Pluto LNG Train 2



Contact Details


  Linus O'Brien
  (08) 9365 7556
 CONTACT EMAIL

  Locations: WA Australia (Onshore)
  Project Status: FEED
  Project Owner Woodside Energy Ltd

Project Details


The project comprises a proposed expansion of the Woodside-operated Pluto LNG facility through construction of a second LNG train.  Expanded capacity allows for the potential processing of third-party gas resources through the Pluto LNG facilities, including the proposed Scarborough Development. 

                                                                                                       

Woodside has selected Bechtel as its preferred contractor, initially to undertake FEED and with an option to construct the project subject to FID.  Woodside intends to enter into negotiations to finalise contract arrangements for the work, based upon Bechtel’s proposal which reflects a proven design that it has previously constructed in Australia.

                                                                                                                    

As the successful EPC contractor, Bechtel would assume responsibilities as the procurement entity for all itemised packages that result as sub-contracts.

                                                              

Woodside’s own procurement activities will be limited to sourcing materials or services occasionally required to supplement the services provided by the EPC contractor.

                                                   


Woodside’s project milestones are aligned with the proposed upstream Scarborough Development, targeting front-end engineering and design entry in Q1 2019 and a final investment decision in 2020. Ready for start-up of the downstream expansion is targeted in 2024.                                                                                              

SHOW LESS

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Anti - Foam Metering and Injection System16 Aug 1926 Aug 1926 Aug 19
Please refer to the scope of works document for details of the package.
CO2 Absorber13 Mar 193 Apr 193 Apr 19
Please refer to the scope of works document for details of the package
Inlet Air Chilling System13 Mar 193 Apr 193 Apr 19
Please refer to scope of works document for details of the package
Heavy Wall Vessels - Carbon Steel (CS)14 Mar 194 Apr 194 Apr 19
Please review the scope of works document for details of the package.
Internals for Columns14 Mar 194 Apr 194 Apr 19
Please review the scope of works document for details of the package.
FEED Gas Expander Compressor14 Mar 195 Apr 195 Apr 19
Please review the scope of works document for details of the package.
Power Transformers14 Mar 195 Apr 195 Apr 19
Please review the scope of works document for details of the package.
Columns and Vessels (Carbon Steel) - Proprietary14 Mar 198 Apr 198 Apr 19
Please review the scope of works document for details of the package.
Columns and Vessels (Stainless Steel)14 Mar 198 Apr 198 Apr 19
Please review the scope of works document for details of the package.
Columns and Vessels (Carbon Steel)15 Mar 199 Apr 199 Apr 19
Please review the scope of works document for details of the package.
Columns and Vessels (Stainless Steel)15 Mar 199 Apr 199 Apr 19
Please review the scope of works document for details of the package.
Coalescers15 Mar 1910 Apr 1910 Apr 19
Please review the scope of works document for details of the package.
Prefabricated Substation Buildings15 Mar 1910 Apr 1910 Apr 19
Please review the scope of works document for details of the package.
Filters and Gas Separators15 Mar 1911 Apr 1911 Apr 19
Please review the scope of works document for details of the package.
Safety Instrumented System and Fire and Gas System15 Mar 1911 Apr 1911 Apr 19
Please review the scope of works document for details of the package.
Actuated On-Off Ball Valves15 Mar 1912 Apr 1912 Apr 19
Please review the scope of works document for details of the package.
General Service Control Valves15 Mar 1912 Apr 1912 Apr 19
Please review the scope of works document for details of the package.
Concrete Batch Plant and Aggregate Supply5 Apr 1926 Apr 1926 Apr 19
Please review the scope of works document for details of the package.
Construction Village Buildings Utilities Operations and Catering16 Apr 197 May 197 May 19
Please refer to the scope of works document for details of the package
Air Services23 May 1913 Jun 1913 Jun 19
Please review the scope of works document for details of the package.
Bussing23 May 1913 Jun 1913 Jun 19
Please review the scope of works document for details of the package.
Temporary Buildings - Facilities - Utilities23 May 1913 Jun 1913 Jun 19
Please review the scope of works document for details of the package.
Temporary Telecoms23 May 1913 Jun 1913 Jun 19
Please review the scope of works document for details of the package.
Concrete Pumping24 May 1914 Jun 1914 Jun 19
Please review the scope of works document for details of the package.
NDE Testing24 May 1914 Jun 1914 Jun 19
Please review the scope of works document for details of the package.
Site Preparation - Crushing and Earthworks24 May 1914 Jun 1914 Jun 19
Please review the scope of works document for details of the package.
Soil and Concrete Testing24 May 1914 Jun 1914 Jun 19
Please review the scope of works document for details of the package.
Medical and ER Services11 Jun 1925 Jun 1925 Jun 19
Please refer to the scope of works document for details of the package
Road Paving11 Jun 1925 Jun 1925 Jun 19
Please refer to the scope of works document for details of the package
Compressor Bridge Crane26 Jun 196 Jul 196 Jul 19
Please refer to the scope of works for further details pertaining to this package.
Pipe Fittings Flanges and Valves26 Jun 196 Jul 196 Jul 19
Please refer to the scope of works for further details pertaining to this work.
Pump Metering or Proportioning26 Jun 196 Jul 196 Jul 19
Please refer to scope of work for further details pertaining to this package.
Pump Vertical Sump26 Jun 196 Jul 196 Jul 19
Please refer to scope of work for further details pertaining to this package.
Electric Heater25 Jun 1916 Jul 1916 Jul 19
Please refer to the scope pf works document for details of the package
Ethylene Storage Drums26 Jun 1916 Jul 1916 Jul 19
Please refer to the scope of works document for details of the package
Pig Receiver25 Jun 1916 Jul 1916 Jul 19
Please refer to the scope pf works document for details of the package
Pump Centrifugal ANSI Pumps25 Jun 1916 Jul 1916 Jul 19
Please refer to the scope of works document for details of the package
Standby Diesel Generator25 Jun 1916 Jul 1916 Jul 19
Please refer to the scope of works document for details of the package
Tank Shop Fabricated25 Jun 1916 Jul 1916 Jul 19
Please refer to the scope of works document for details of the package
Level Gauge Sight Glass11 Jul 1921 Jul 1921 Jul 19
Please refer to the package description as detailed in the pdf under DOCS
Nitrogen Generation Plant11 Jul 1921 Jul 1921 Jul 19
please refer to the package description as detailed in the pdf under DOCS
Pressure Relief Valves11 Jul 1921 Jul 1921 Jul 19
please refer to the package description as detailed in the pdf under DOCS
Pump (Centrifugal/API) Lean Solvent Charge11 Jul 1921 Jul 1921 Jul 19
Please refer to the package description as detailed in the pdf under DOCS
Pump Centrifugal API11 Jul 1921 Jul 1921 Jul 19
Please refer to the package description as detailed in the pdf under DOCS
Rupture Disks11 Jul 1921 Jul 1921 Jul 19
please refer to the package description as detailed in the pdf under DOCS
T-Strainers11 Jul 1921 Jul 1921 Jul 19
please refer to the package description as detailed in the pdf under DOCS
Vibration Monitoring System11 Jul 1921 Jul 1921 Jul 19
Please refer to the package description as detailed in the pdf under DOCS
Security (Access and Traffic Control - Camp)12 Jul 192 Aug 192 Aug 19
Please review the scope of works document for details of the package.
Waste (Solid and Liquid and Hazardous) Removal and Recycle12 Jul 192 Aug 192 Aug 19
Waste (Solid, Liquid and Hazardous) Removal and Recycle