WOODSIDE BURRUP PTY. LTD.

PLUTO TRAIN 1 SCARBOROUGH MODIFICATIONS

location_onWA Australia
location_on

WA Australia

business

WOODSIDE BURRUP PTY. LTD.

Project Primary Contact
person_outline
Raymond Loh
Manager
phone_enabled
+61 8 9365 7499
Overview

The Pluto Train 1 Scarborough Modifications Project ("Project") comprises of modifications to the existing Woodside-operated Pluto LNG Train 1 facility and associated infrastructure ("Pluto Train 1 Facilities") to enable gas from the Scarborough Project to be processed at the Pluto Train 1 Facilities.


Following completion of the Project and once the capacity becomes available, up to 3mtpa of gas from the Scarborough Project will be processed at the Pluto Train 1 Facilities. The Project is based on a modular design of additional equipment and will be accommodated within the existing pre-disturbed Pluto LNG footprint. New facilities to be installed include a Natural Gas Liquids Unit, Nitrogen Recycle Compressor, Pluto gas custody metering, and a range of modifications to auxiliary facilities. After a competitive FEED, Kellogg Brown and Root Pty Ltd were selected as the Engineering, Procurement and Construction Management ("EPCM") Contractor for the Execute phase of the Project and were awarded an EPCM Contract on 01 September 2023.


43
Total Work Packages
2
Open Work Packages
41
Other Work Packages
43
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Monadelphous Engineering Associates Pty Ltd
Status
Open
Full scope EOI closes on
25 Nov 2024
Partial scope EOI closes on
25 Nov 2024

Please refer to the scope of work for further information pertaining to the comprehensive package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Oct 2024
Partial scope EOI closes on
04 Oct 2024

Please note of the following EOI Evaluations within the scope of work:-
The Expression of Interest will be evaluated on the following criteria:
. Willingness to supply Aspen Aerogel products.
. Demonstrated experience in the installation of FEM (Flexible Elastomeric Membrane) insulation material.
. Experience in performing works in an LNG or oil and gas environment.
. Contractors who can also perform Structural Fireproofing works will be preferred.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Oct 2024
Partial scope EOI closes on
28 Oct 2024

Please refer to the scope of work for additional information pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Oct 2024
Partial scope EOI closes on
28 Oct 2024

Please Note:
The scope of work consists of the two separable work portions, however this is intended to be listed under one package:-

1. BW110-SBC-007 Pressure Testing Package

2. BW110-SBC-008 Chemical Cleaning Service Package

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Winyama Contracting Group
Status
Closed
Full scope EOI closes on
01 Nov 2024
Partial scope EOI closes on
01 Nov 2024

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

KBR
Status
Open
Full scope EOI closes on
11 Dec 2024
Partial scope EOI closes on
11 Dec 2024

Wind walls are required by the Pluto Train 1 Modifications Project to function as a wind break
to reduce wind forces on equipment and piping, whilst still allowing a through flow of air for
ventilation. The wind walls shall be supplied as a set of panels for fixing on major steelwork
structures (provided by others). Vendors shall provide the panel supporting steelwork system
along with the wind wall panels. The panels and support steelwork shall be from a proven
proprietary system. Depending on the design offered by the Supplier, acoustic insulation to
control internal reverberant noise levels may also be required. There is also a requirement for
steel framed sliding doors clad with the wind wall panel material

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
19 May 2022
Partial scope EOI closes on
19 May 2022

Please refer to SOW for further details pertaining to this package.

Awarded Company
Winyama Construction Group Pty Ltd
Contractor Name: Winyama Construction Group Pty Ltd
Contractor website: https://www.winyamacontracting.com.au/
Contractor email: wayiba@winyamacontracting.com.au
Contractor address: 9/9 Oxide Loop, Gap Ridge LIA, WA 6714

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
19 May 2022
Partial scope EOI closes on
19 May 2022

Please refer to SOW for further details pertaining to this package.

Awarded Company
Monadelphous Engineering Associates Pty Ltd
Package awarded to: Monadelphous Engineering Associates Pty Ltd
Contact person: Krish Naren
Email: KNaren@monadel.com.au
Website: www.monadelphous.com.au
Address: Level 4/59 Albany Hwy, Victoria Park WA 6100.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
25 May 2022
Partial scope EOI closes on
25 May 2022

Please refer to SOW for further details pertaining to this package.

Awarded Company
Sulzer Chemtech
Contractor name: Sulzer Chemtech
Contractor website: www.sulzer.com
Contractor Details:
Contact person: Alvin Tang - Project Manager
Mobile: +65 9017 9563
DID: +65 6800 0062
Email: alvin.tang@sulzer.com
Fax: +65 68627563

Contractor address:
Sulzer Singapore Pte Ltd
10 Benoi Sector
Singapore 629845

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
25 May 2022
Partial scope EOI closes on
25 May 2022

Please refer to SOW for further details pertaining to this package.

Awarded Company
Larsen & Toubro
Contractor Name: Larsen & Toubro
Contractor website: www.larsentoubro.com
Contractor Details:-
Contact person: Jaynil Panwala - Assistant Manager - International Marketing & Business Development
Email: jaynil.panwala@larsentoubro.com
Phone: 91-22 6705 2946
O: +91 261 280 7260 I Cell: +91 886 6684 743

Contractor address:
Larsen & Toubro Limited Heavy Engineering Division Mumbai
India
400072

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
13 Jun 2022
Partial scope EOI closes on
13 Jun 2022

Please note:-
Package Awarded as part of AR01

Awarded Company
Package
Package Awarded as part of AR01

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
13 Jun 2022
Partial scope EOI closes on
13 Jun 2022

Please note:-
Package Awarded as part of AR01

Awarded Company
Package Awarded as part of AR01
Package Awarded as part of AR01

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
13 Jun 2022
Partial scope EOI closes on
13 Jun 2022

Please note:
Package Awarded as part of AR01

Awarded Company
Package Awarded as part of AR01
Package Awarded as part of AR01

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
15 Jun 2022
Partial scope EOI closes on
15 Jun 2022

Please refer to SOW for further details pertaining to this package.

Awarded Company
Krohne
Contractor Name: Krohne
Contractor website: www.krohne.com
Contractor Details:-
Contact person: Joel Choong - Project Manager
Telephone: +603 7932 0500 ext: 124
Fax: +603 7932 5800
Mail: j.choong@krohne.com
Website: www.my.krohne.com

Contractor address:
Axis Business Campus, Unit G.01, Block B,
No. 13A & 13B Jalan 225 Seksyen 51A,
46100 Petailing Jaya,
Selangor.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
20 Jan 2023
Partial scope EOI closes on
20 Jan 2023

Please refer to the SOW for additional details pertaining to this work.

Awarded Company
Integraph PP and M Australia Pty ltd (Hexagon)
Integraph PP and M Australia Pty ltd (Hexagon)
Contact Name: Robi Yasser
Contractor website: https://hexagon.com/intergraph
Contractor email: yasser.robi@hexagon.com
Contractor address:
Level 4, 32 Walker Street, North Sydney, NSW 2060, Australia

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
31 Mar 2023
Partial scope EOI closes on
31 Mar 2023

Please refer to scope of work for further information.

Awarded Company
ATCO STRUCTURES & LOGISTICS PTY LTD
Website: www.atco.com/en-au
Contractor email address: aslau.perth@atco.com
Contractor Address: 28 Armstrong Road, Hope Valley, Perth, WA, 6165

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
11 Apr 2023
Partial scope EOI closes on
11 Apr 2023

Please refer to SOW for further information.

Awarded Company
Nikkiso
Contractor Name: Nikkiso
Contractor website: www.nikkisoceig.com
Contractor Details:-
Contact person: Kevin Roschitz
Phone: 702-643-4900
Email: kevin.roschitz@acdcryo.com

Contractor address:
Nikkiso Cryo Inco
4661 Eaker St North Las Vegas
Nevada US
89081

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
12 Jun 2023
Partial scope EOI closes on
12 Jun 2023

Please refer to the SOW for further details pertaining to the package.

Awarded Company
Schneider Electric Australia Pty Ltd
Schneider Electric Australia Pty Ltd
Website: https://www.se.com/au
Email: Steven.Briggs@se.com
Address: 2 Banfield Road, Macquarie Park, NSW, 2113

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
22 Jun 2023
Partial scope EOI closes on
22 Jun 2023

Please refer to the SOW for further details pertaining to the package.

Awarded Company
F.H. BERTLING LOGISTICS ABERDEEN LTD
Contractor name: F.H. BERTLING LOGISTICS ABERDEEN LTD
Contractor website: https://www.bertling.com/logistics
Contractor email: samantha.nelson@bertling.com
Contractor address:
FH Bertling Logistics Aberdeen Ltd. 23, Twin Spires Business Park, Mugiemoss Road Aberdeen, AB21 9BG.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
15 Sep 2023
Partial scope EOI closes on
15 Sep 2023

Please refer to the SOW for further details pertaining to the package.

Awarded Companies
Bunbara Pty Ltd
Contractor Name: Bunbara Pty Ltd
Contractor Website: Bunbara.com.au
Contractor email address:
peter@bunbara.com.au
Contractor Address:
Bunbara Pty Ltd, 3 Teakle Road, Osborne Park, Western Australia, 6017.
LFF Glamal
Contractor Website: www.LFFGroup.com
Contractor email: michael.lidster@glamal.co.uk
Contractor Address: Christy Way, Southfields Industrial Park, Basildon, Essex, SS15 6TE,
United Kingdom

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
21 Sep 2023
Partial scope EOI closes on
21 Sep 2023

Please refer to the SOW for further details pertaining to the package.

Awarded Company
JORD International Pty Ltd
JORD International Pty Ltd
Contractor Name: Mohamed Yunoos
Contractor website: www.jord.com.au
Contractor email: myunoos@jord.com.au
Contractor address: Jord International Pty Ltd, 40 Oxley Street, St Leonards, NSW, Australia 2065.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
13 Oct 2023
Partial scope EOI closes on
13 Oct 2023

Please refer to the Scope of Work for further detail pertaining to this package.

Awarded Company
Ampo S Coop I Ampo Poyam Valves and OMB Valves
Ampo S Coop I Ampo Poyam Valves and OMB Valves

Contracor Name: Ampo S Coop I Ampo Poyam Valves.
Contractor website: www.ampo.com
Contractor email: sgarcia@ampo.com
Contractor address: Barrio Katea S/N, Idiazabal, Guipuzcoa, Spain, 20213.

Contractor Name: OMB Valves
Contractor website: www.ombvalves.com
Contractor email: p.lazarowicz@ombvalves.com
Contractor address: OMB Valves, Via Europa, 7 24069, Cenate Sotto, Bergamo, Italy.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
26 Dec 2023
Partial scope EOI closes on
26 Dec 2023

Please refer to the SOW for further details pertaining to the package.

Awarded Company
ABB Australia Pty Ltd
ABB Australia Pty Ltd
Contractor Name: Bauke Blok
Contractor website: www.new.abb.com/au
Contractor email: bauke.blok@au.abb.com
Contractor address: ABB Australia Pty Ltd, 1 Bapaume Road, Moorebank, NSW 2170.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
11 Jan 2024
Partial scope EOI closes on
11 Jan 2024

Please refer to the SOW for further details pertaining to the package.

Awarded Company
BGW Group
BGW Group
Contractor name: Laurie Murphy
Contractor website: www.bgwgroup.com.au
contractor email: lmurphy@bgwgroup.com.au
Contractor address:
CNW Pty Ltd, 675 Macarthur Avenue, Central Pinkenba, Queensland 4008, Australia.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
03 May 2024
Partial scope EOI closes on
03 May 2024

Please note:-
Package PI29 awarded.
PI26 and PI27 not yet awarded.

Awarded Company
CARPENTER and PATERSON (ASIA) Ltd
CARPENTER and PATERSON (ASIA) Ltd
Contractor website: https://cpa-pipesupports.com/
Contractor email: info@cp-ltd.co.th
Contractor address:
Bangkok Free Trade Zone, 88/91 Moo 15 Tambol
Bangsaothong,
Amphoe Tambol Bangsaothong, Samuthprakarn Province, 10540 Thailand.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
03 May 2024
Partial scope EOI closes on
03 May 2024

Please refer to the scope of work for additional information.

Awarded Company
Walker Newman & Associates Pty Ltd
Walker Newman & Associates Pty Ltd
Contractor name: Davide Ciotti
Contractor website: www.wna.com.au
Contractor email: davide.ciotti@wna.com.au
Contractor address:
Walker Newman & Associates Pty Ltd
23 Stiles Avenue, Burswood, WA 6100.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
25 May 2022
Partial scope EOI closes on
25 May 2022

Please refer to SOW for further details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
25 May 2022
Partial scope EOI closes on
25 May 2022

Please note:-
Package Deleted from Scope.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
27 May 2022
Partial scope EOI closes on
27 May 2022

Please refer to SOW for further details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
27 May 2022
Partial scope EOI closes on
27 May 2022

Please refer to SOW for further details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
27 May 2022
Partial scope EOI closes on
27 May 2022

Please note:-
Package Deleted from Scope

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
27 May 2022
Partial scope EOI closes on
27 May 2022

Please note:-
Package Deleted from Scope

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
09 Oct 2023
Partial scope EOI closes on
09 Oct 2023

Please note:-
Package Deleted from Scope

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
09 Oct 2023
Partial scope EOI closes on
09 Oct 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
13 Feb 2024
Partial scope EOI closes on
13 Feb 2024

Please refer to the scope of work for additional information pertaining to this scope of work.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
01 Mar 2024
Partial scope EOI closes on
01 Mar 2024

Please refer to the scope of work for additional information regarding this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
03 May 2024
Partial scope EOI closes on
03 May 2024

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
15 May 2024
Partial scope EOI closes on
15 May 2024

Please refer to the scope of work for additional information pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 May 2024
Partial scope EOI closes on
22 May 2024

Please refer to scope of work for additional information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 May 2024
Partial scope EOI closes on
22 May 2024

Please refer to the SOW for further details pertaining to the package

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 May 2024
Partial scope EOI closes on
22 May 2024

Please refer to the SOW for further details pertaining to the package

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 May 2024
Partial scope EOI closes on
22 May 2024

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Sep 2024
Partial scope EOI closes on
04 Sep 2024

Please note:
This scope is for provision of a heavy lift vessel. We are seeking to contract directly with a shipping company/vessel owner, rather than through a freight forwarder or another third party.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.