Woodside Energy Ltd

Scarborough Project

Overview

Woodside will develop the Scarborough gas resource through new offshore facilities connected by an approximately 430 km pipeline to a brownfield expansion of the existing Pluto LNG onshore facility (Pluto Train 2).


The proposal is to initially develop the gas field with eight subsea, high-rate gas wells, and thirteen wells drilled over the life of the Scarborough field, with all wells tied back to a semi-submersible floating production unit (FPU) moored in 950 m of water close to the Scarborough field.


The development of Scarborough will provide a boost to Western Australia, growing jobs and bringing work through the supply chain. Woodside is working closely with its key contractors to maximise opportunities for local, regional and WA businesses across the supply chain for Scarborough.


Woodside has engaged with a range of specialist contractors in the offshore, subsea and pipeline sectors to deliver the Scarborough Project, including Subsea Integrated Alliance for the engineering, manufacture, supply and installation of the subsea hardware, umbilicals, risers and flowlines scope, McDermott for the engineering, procurement, construction and delivery of the FPU, Saipem for the coating and installation of the export pipeline and Boskalis for the seabed intervention and shore crossing scope.


In Q4 2021, Woodside announced a final investment decision for the Scarborough Project. Woodside has issued Full Notice to Proceed to key Scarborough contractors.


Contractor Details

McDermott Australia Pty Ltd https://www.mcdermott.com/Suppliers

Subsea Integration Alliance https://www.subseaintegrationalliance.com/contact-us\

Saipem Australia Pty Ltd SaipemProc.Au@saipem.com

Intecsea Pty Ltd http://www.intecsea.com/contact/

Boskalis Australia Pty Ltd https://australia.boskalis.com/contact/head-office-contact-details.html

Scarborough Project

Woodside Energy Ltd

location_on

WA Australia


Project Primary Contact
person_outline
Raymond Loh
badge
Manager
phone
+61 08 9365 7499
mail Send Email

Subsea Integration Alliance

Work Package
EOI Open Date
EOI Close Date
Status

See scope for full details

Status
Awarded
EOI Open Date
06 Dec 2021
EOI Close Date
16 Dec 2021
This work package has been awarded to the companies below

Flexible Engineered Solutions International

Contact Details: Alvin Leung Project Engineer al@fesltd.co.uk Location: Merchant Court, North Seaton Industrial Estate, Ashington, Northumberland, NE63 0YH, UK

See scope for full details

Status
Awarded
EOI Open Date
02 Jun 2021
EOI Close Date
16 Jun 2021
This work package has been awarded to the companies below

National Oilwell Varco Denmark I/S

Contact Details: Michael Cadovius Project Manager Michael.Cadovius@nov.com Location: Priorparken 480 2605 Brondby Denmark

See scope for full details

Status
Awarded
EOI Open Date
02 Jun 2021
EOI Close Date
16 Jun 2021
This work package has been awarded to the companies below

4 Subsea AS

Peter Jenkins Chief Executive Officer +4799275435 Peter.jenkins@4subsea.com

Please refer to the scope of works document for details of the package

Status
Awarded
EOI Open Date
12 Nov 2019
EOI Close Date
22 Nov 2019
This work package has been awarded to the companies below

National Oilwell Varco Denmark I/S

Michael Cadovius (Project Manager) Email: Michael.Cadovius@nov.com Location: Priorparken 480, 2605 Brondby Denmark

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
11 Mar 2024
EOI Close Date
25 Mar 2024
This work package has been awarded to the companies below

MMA Offshore Vessel Operations Pty Ltd

Contractor Name: MMA Offshore Vessel Operations Pty Ltd. Contractor website: mmaoffshore.com Contractor email: Wesley.griffiths@mmaoffshore.com Contractor address: EQ12, Level 10 12-14 The Esplanade, Perth, WA 6000.

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
04 Sep 2023
EOI Close Date
14 Sep 2023
This work package has been awarded to the companies below

Jumbo Shipping Contractors BV

Contractor Name: Jumbo Shipping Contractors BV. Contractor Website: jumbomaritime.nl Email: krystal.cheng@harren-group.com Contractor Address: Havenstraat 23, 3115 HC Schiedam. P.O.Box 3070, 3101 EB Schiedam, Netherlands

See scope for full details

Status
Awarded
EOI Open Date
27 May 2021
EOI Close Date
09 Jun 2021
This work package has been awarded to the companies below

Civmec Construction and Engineering Pty Ltd

Contractor Name: Civmec Construction and Engineering Pty Ltd. Contractor Website: civmec.com.au Email: david.power@civmec.com.au Contractor Address: 16 Nautical Drive Henderson, Western Australia, 6166 WA.

Pease see SoW document for full details of the package

Status
Awarded
EOI Open Date
08 Jun 2021
EOI Close Date
22 Jun 2021
This work package has been awarded to the companies below

Sumitomo

Anthony Walker Deputy Department General Manager +4764612382

Vallourec

Vallourec: Gael David Project Linepipe/Operations Project Lead Gael.david@vallourec.com +33643246675

Please see SoW document for details of the package

Status
Awarded
EOI Open Date
08 Jun 2021
EOI Close Date
22 Jun 2021
This work package has been awarded to the companies below

Sumitomo

Anthony Walker Deputy Department General Manager +4764612382

Vallourec

Gael David Project Linepipe/Operations Project Lead Gael.david@vallourec.com +33643246675

See scope for full details

Status
Awarded
EOI Open Date
02 Aug 2022
EOI Close Date
16 Aug 2022
This work package has been awarded to the companies below

Process and Pipeline Services Pty Ltd

Contractor Name: Process and Pipeline Services Pty Ltd. Contractor Website: bakerhughes.com Email: Bianca.Frzop@bakerhughes.com Contractor Address: Level 14, London House, 216 St George's Terrace, Perth, Western Australia, 6000.

See scope for full details

Status
Awarded
EOI Open Date
04 Oct 2021
EOI Close Date
18 Oct 2021
This work package has been awarded to the companies below

VSL Australia Pty Ltd

David Trayner EMAIL: david.trayner@vsl.com PH: +61 (0) 2 9484 5944

See scope for full details

Status
Awarded
EOI Open Date
27 May 2021
EOI Close Date
09 Jun 2021
This work package has been awarded to the companies below

Civmec Construction and Engineering Pty Ltd

Rod Bowes (Executive Group Manager Proposals) Email: rod.bowes@civmec.com.au PH: +61 8 9437 6288
lock
Login to View Details
Login

Please refer to the SOW for further details pertaining to the package.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Please refer to the Scope of Work for further detail pertaining to this package.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Please refer to the SOW fur further details pertaining to this package.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Please refer to the scope of works document for details of the package

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI

Boskalis

Work Package
EOI Open Date
EOI Close Date
Status

See Scope for full details

Status
Awarded
EOI Open Date
11 Apr 2022
EOI Close Date
25 Apr 2022
This work package has been awarded to the companies below

Bhagwan Marine

Contact person: Josh Board Email: commercial@bhagwanmarine.com Phone number: +61 8 9424 2300

See Scope for full Details

Status
Awarded
EOI Open Date
22 Apr 2022
EOI Close Date
09 May 2022
This work package has been awarded to the companies below

Subsea Protection Systems LTD

Contact person: Andy Rogers Email: enquiries@sps-gb.com Phone number: 44 (0)1493 600700

See scope for full details

Status
Awarded
EOI Open Date
11 Apr 2022
EOI Close Date
25 Apr 2022
This work package has been awarded to the companies below

Joyce Krane

Contact person: Sean Joyce Email: info@joycekrane.com Phone number: +61 8 6371 5012

See scope for full details

Status
Awarded
EOI Open Date
19 Apr 2022
EOI Close Date
30 Apr 2022
This work package has been awarded to the companies below

Globe Construction

Contact person: Michael Meason Email: admin@globeconstruction.com.au Phone number: +61 (08) 9185 2794

See Scope for full details (Wet Hire)

Status
Awarded
EOI Open Date
07 Apr 2022
EOI Close Date
02 May 2022
This work package has been awarded to the companies below

Snijder B.V.

Contact person: Jerry Wolsink Email: info@snijder.nl Phone number: +31 (0) 229 210 617

Please refer to the SOW for further details pertaining to this package.

Status
Awarded
EOI Open Date
19 Jan 2022
EOI Close Date
17 Feb 2022
This work package has been awarded to the companies below

Boral Resources W.A.

Contact: Jamie Bartlett Email: info@boral.com.au Phone: 1300 267 253

Saipem

Work Package
EOI Open Date
EOI Close Date
Status

Please refer to SOW for further information.

Status
Awarded
EOI Open Date
28 Nov 2022
EOI Close Date
09 Dec 2022
This work package has been awarded to the companies below

ATOM SUPPLY PTY LTD

ATOM SUPPLY PTY LTD Email: Mak.Cooke@atom.com.au Tel: +610891440800 Adress: 11/15 Mackay ST 6105 Kewdale (WA) - Australia

Please refer to SOW for further details pertaining to this package. Only companies that have not previously been contacted by Saipem should submit an EOI.

Status
Awarded
EOI Open Date
29 Sep 2022
EOI Close Date
13 Oct 2022
This work package has been awarded to the companies below

AUSTRALIAN OFFSHORE SOLUTIONS PTY LTD

AUSTRALIAN OFFSHORE SOLUTIONS PTY LTD 14 Kearns Crescent, Applecross, WA 6153 Ardross (WA), Australia Phone: +61893179000 Email: bill.reay@aosau.com

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
31 Mar 2023
EOI Close Date
14 Apr 2023
This work package has been awarded to the companies below

FUGRO AUSTRALIA PTY LTD

FUGRO AUSTRALIA PTY LTD Suite 3, 128 Main Street, 6017 Osborne Park, (WA) Australia Tel: +61892182000

Please refer to SOW for additional information pertaining to this package.

Status
Awarded
EOI Open Date
05 May 2023
EOI Close Date
22 May 2023
This work package has been awarded to the companies below

SUPAGAS PTY LIMITED

SUPAGAS PTY LIMITED Address: 5 BENSON ROAD2565 INGLEBURN (NSW) AUSTRALIA Tel. No. : +6161432176381 E-mail address : olgalonsdale@supagas.com.au

PROVISION OF ANCHOR HANDLING TUGS ON HIRE FOR ANCHOR HANDLING ACTIVTIES WITH SHALLOW WATER PIPELAY BARGE (SEND).

Status
Awarded
EOI Open Date
05 May 2023
EOI Close Date
22 May 2023
This work package has been awarded to the companies below

TIDEWATER OFFSHORE PTY LTD

Package awarded to: TIDEWATER OFFSHORE PTY LTD ATWELL BUILDINGS' LEVEL 2 3 CANTONM 6160 FREMANTLE (WA)AUSTRALIA Contact emails: thibault.thiery@tdw.com I efin.chen@tdw.com

Please refer to the SOW document for additional information pertaining to this package.

Status
Awarded
EOI Open Date
08 May 2023
EOI Close Date
05 Jun 2023
This work package has been awarded to the companies below

Safe Helidecks PTY LTD

Address: North Fremantle 6159 Perth (WA) Australia E-mail address: Info@safehelidecks.com

Please refer to the SOW for additional details pertaining to this package.

Status
Awarded
EOI Open Date
17 Apr 2023
EOI Close Date
27 Apr 2023
This work package has been awarded to the companies below

MET OFFICE and STORMGEO AS NORDRE NOSTEKAIEN

Package has been awarded to:- MET OFFICE FITZROY ROAD EXETER DV EX1 3PB UNITED KINGDOM enquiries@metoffice.gov.uk STORMGEO AS NORDRE NOSTEKAIEN 1 5011 BERGEN (12) NORWAY ouafa.huson@stormgeo.com

Please refer to the SOW for additional details pertaining to this package.

Status
Awarded
EOI Open Date
12 Apr 2023
EOI Close Date
24 Apr 2023
This work package has been awarded to the companies below

DAN-BUNKERING PTY LTD

Address: Level 6, Suite 604, 50 Clarence STR 2000 Sydney NSW (NSW) AUSTRALIA Email: cvf@dan-bunkering.com

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
05 Apr 2023
EOI Close Date
19 Apr 2023
This work package has been awarded to the companies below

Fugro Australia PTY LTD

Suite 3, 128 Main Street, 6017 Osborne Park (WA) Australia Email : info@fugro.com Tel. No.: +61892182000

Please refer to SOW document for additional details pertaining to this package.

Status
Awarded
EOI Open Date
05 May 2023
EOI Close Date
15 May 2023
This work package has been awarded to the companies below

Subsea Protection Systems Ltd

Subsea Protection Systems Ltd 225 SPS House, Holmes Wharf, Southt Great Yarmouth NK NR31 0JJ United Kingdom Email address: adam@sps.gb.com

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
30 Mar 2023
EOI Close Date
11 Apr 2023
This work package has been awarded to the companies below

TRANS GLOBAL PROJECTS LOGISTICS PTY LTD

Trans Global Projects Logistics PTY Ltd L 4, 37 ST Georges Terrace 6000 Perth WA Australia Tel. No.: +61732051888 E-mail address: brisbane@tglobal.com

Please see SOW document for details

Status
Awarded
EOI Open Date
21 Jun 2021
EOI Close Date
01 Jul 2021
This work package has been awarded to the companies below

Process & Pipeline Services PTY LTD

Lionel Platel Email: Lionel.Platel@bakerhughes.com Tel: +61 400 011 025

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
27 Jun 2023
EOI Close Date
10 Jul 2023
This work package has been awarded to the companies below

Australian Offshore

Australian Offshore Solutions Pty Ltd 14 Kearns Crescent Applecross WA 6153 Ardross WA Australia

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
14 Apr 2023
EOI Close Date
26 Apr 2023
This work package has been awarded to the companies below

JETWAVE MARINE SERVICES PTY LTD

Address: 7/13 Mews Road, 6162 South Fremantle, WA 6162, Australia Email: jnapier@jwms.com.au

Please refer to SOW for additional details pertaining to this package.

Status
Awarded
EOI Open Date
12 Apr 2023
EOI Close Date
24 Apr 2023
This work package has been awarded to the companies below

GO OFFSHORE PTY LTD

GO OFFSHORE PTY LTD LEVEL 1, 72 MELVILLE PARADE 6151 SOUTH PERTH WA (WA) AUSTRALIA K.Wardle@gomarinegroup.com.au; k.clark@gomarinegroup.com.au

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
14 Apr 2023
EOI Close Date
26 Apr 2023
This work package has been awarded to the companies below

For MSV1:

For MSV1: FUGRO Australia Pty Ltd S Suite 3, 128 Main Street, Osborne Park, 6017, Perth, WA Western Australia. Email address: info@fugrotsm.com Tel No: +61 8 9218 2000 For MSV2: Subsea 7 Australia Contracting Pty Ltd Level 15 141 St Georges Terrace, 6000, Perth, WA Western Australia. Email address: Marocchichristian.marocchi@subsea7.com Tel No: +61 8 9326 1281

Woodside

Work Package
EOI Open Date
EOI Close Date
Status

See scope for full details

Status
Awarded
EOI Open Date
06 May 2022
EOI Close Date
19 May 2022
This work package has been awarded to the companies below

strohm

Strohm B.V Contact person: Robby O'Sullivan Technical Representative - Australia Mobile: +61 459 992 264 Email: r.osullivan@strohm.eu

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
01 Nov 2023
EOI Close Date
16 Nov 2023

Please refer to SOW for further details pertaining to this work package.

Status
Awarded
EOI Open Date
01 Jul 2022
EOI Close Date
01 Aug 2022
This work package has been awarded to the companies below

WA Marine Pty Ltd trading as O2 Marine

Website: o2marine.com.au Email address: admin@o2marine.com.au Address: 20 Mews Road, Fremantle, WA,6160

Please refer to SOW for further information pertaining to this SOW.

Status
Awarded
EOI Open Date
03 Nov 2021
EOI Close Date
01 Dec 2021
This work package has been awarded to the companies below

Fugro Australia

Fugro Australia Contact person: Barry Walsh Address: 1060 Hay Street, West Perth, WA 6005. Website: https://www.fugro.com/about-fugro/locations/asia-pacific/australia
lock
Login to View Details
Login

Please refer to SOW for further details pertaining to this package.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Please refer to SOW for further details pertaining to this package.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Please see SoW document for details of the package

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI

McDermott

Work Package
EOI Open Date
EOI Close Date
Status

Please see scope of work document for further details

Status
Awarded
EOI Open Date
22 Sep 2021
EOI Close Date
05 Oct 2021
This work package has been awarded to the companies below

FRAMO AS

Contact person: Mr. Stian Namtvedt Gjelsvik Contact number: +4748068362 Email: sngj@framo.no

Please refer to the scope of works for details of the package

Status
Awarded
EOI Open Date
14 May 2019
EOI Close Date
11 Jun 2019
This work package has been awarded to the companies below

Eureka Pumps AS

Rolf Thorkildsen +47 915 34 944 rolf.thorkildsen@eureka.no

Please see scope of work document for further details

Status
Awarded
EOI Open Date
22 Sep 2021
EOI Close Date
05 Oct 2021
This work package has been awarded to the companies below

ABB Australia Pty Ltd

Contact Person: Steve Hollyoak Contact Number: +61 (0) 419 233 763 Contact Email: steve.hollyoak@au.abb.com

See scope for full details

Status
Awarded
EOI Open Date
14 Oct 2021
EOI Close Date
29 Oct 2021
This work package has been awarded to the companies below

Exo Industries

Contact Person: Alexandre Sorel Contact Number: +6013 354 4077 Contact Email: alexandre.sorel@exo-international.com

Please refer to scope of works document for details of teh package

Status
Awarded
EOI Open Date
04 Apr 2019
EOI Close Date
24 Apr 2019
This work package has been awarded to the companies below

Morimatsu (Jiangsu) Heavy Industry Co. Ltd.

Mr. Xia Gongzhi 086-18516276240 xiagongzhi@morimatsu.cn

Please refer to the scope of works for details of the package

Status
Awarded
EOI Open Date
14 May 2019
EOI Close Date
11 Jun 2019
This work package has been awarded to the companies below

Solar Turbines International Company

Chris Patterson +1 858 779 7514 Patterson_Chris_R@solarturbines.com

Please refer to the scope of works document for details of the package

Status
Awarded
EOI Open Date
14 May 2019
EOI Close Date
11 Jun 2019
This work package has been awarded to the companies below

Lewa-Nikkiso Australia Pty Ltd

Mr. John Andony +61-4272 15389 john.andony@lewa.com

Please review the scope of works document for more details on the package.

Status
Awarded
EOI Open Date
16 Dec 2019
EOI Close Date
10 Jan 2020
This work package has been awarded to the companies below

ITT Blakers Pty Ltd.

Mr. Gunjan Shah + 61 (0) 8 9302 1855 gunjan.shah@itt.com

Please see scope of work document for further information

Status
Awarded
EOI Open Date
14 Oct 2021
EOI Close Date
29 Oct 2021
This work package has been awarded to the companies below

Honeywell Limited

Contact Person: Mr. Shalender Hingorani Contact Number: +61 407 244 435 Contact Email: shalender.hingorani@honeywell.com

Please refer to SOW for further details pertaining to this package.

Status
Awarded
EOI Open Date
22 Jan 2020
EOI Close Date
03 Feb 2020
This work package has been awarded to the companies below

Viking Norsafe Life-Saving Equipment

Joe Dawes +47 3788 8549 jdaw@viking-life.com

Please see scope of work for further information

Status
Awarded
EOI Open Date
14 Oct 2021
EOI Close Date
29 Oct 2021
This work package has been awarded to the companies below

FG VALVOLE S.r.l

Contact Person: Giuseppe Padalino Contact Number: + 39 035 4541160 Contact Email: giuseppe.padalino@fgvalvole.com

Please refer to SOW for further details pertaining to this package.

Status
Awarded
EOI Open Date
22 Jan 2020
EOI Close Date
03 Feb 2020
This work package has been awarded to the companies below

Carpenter & Paterson Asia Ltd

Mr. Jonathan Jones +66 (0)6 2234 5505 j.jones@cp-ltd.co.th

Package scope: . 2x Pedestal Offshore Cranes (Full Electric or Electric/Hydraulic) . Type = Lattice Boom Crane . Hoists = Main + Whip . Optional = Fly Jib . Installation Type = Floating Production Unit - FPU (semi-submersible) . Crane Installation Height = 56m from SL . Crane Capacity: o On-board lift = 100 SWL @ 8000 / 20t SWL @ 60m lifts. o Off-board lifts = 80 SWL @ 8000 / 20t SWL @ 60m lifts. . Total Significant Wave height: o During summer period (Oct. to Mar) = Max: 5.83m / Mean 2.23m / Std. Dev 0.63 o During winter period (Apr. to Sep) = Max: 6.58m / Mean 2.57m / Std. Dev 0.72 . Fall Configurations:1,2,3,4 . Note: o Platform will be operating in low manning or unmanned. o Cranes will be able to handshake each other for maintenance. Seller to provide the pump, submerged electric motor, power cabling, diesel engine generator, auxiliaries as one package (inspection & testing, assembly, documentation, design & engineering etc. also to be executed by the seller). Estimated pump power: approximately 650 kW (1.500 m3/h , 12 bar) Independent power supply: medium or high voltage power supply from diesel engine driven generator. Submerged installation of motor and pump in a dedicated caisson (far below the topside). *Please refer to scope of work for further details relation to specifications and standards.

Status
Awarded
EOI Open Date
22 Mar 2019
EOI Close Date
17 Apr 2019
This work package has been awarded to the companies below

National Oilwell Varco Norway AS.

Robin Sporsheim +47 7140 1150 Robin.Sporsheim@nov.com

Please refer to the scope of works document for details of the package

Status
Awarded
EOI Open Date
03 Feb 2020
EOI Close Date
13 Feb 2020
This work package has been awarded to the companies below

Siemens Ltd

Ravi Gajaria +61 407 564 558 Ravi.Gajaria@siemens.com

There are two FW pump packages foreseen on the FPU:- Package scope: . Submerged electric motor driven FW pump. . Diesel engine generator (including auxiliaries: diesel storage, lube oil system starting system etc) to provide power to the submerged electric motor. .Instrumentation condition/performance monitoring. .Acoustic enclosure and ventilation system for diesel generator. . Documentation. . Test & Inspection. . Engineering & Design . Spares and special tools . Offshore application and remote (low- or unmanned) operation of the FPU and equipment. Seller to provide the pump, submerged electric motor, power cabling, diesel engine generator, auxiliaries as one package (inspection & testing, assembly, documentation, design & engineering etc. also to be executed by the seller). Estimated pump power: approximately 650 kW (1.500 m3/h, 12 bar) Independent power supply: medium or high voltage power supply from diesel engine driven generator. Submerged installation of motor and pump in a dedicated caisson (far below the topside).

Status
Awarded
EOI Open Date
22 Mar 2019
EOI Close Date
17 Apr 2019
This work package has been awarded to the companies below

Eureka Pumps AS

Rolf Thorkildsen 7 915 34 944 rolf.thorkildsen@eureka.no

Please refer to the scope of woks document for details of the package

Status
Awarded
EOI Open Date
03 Feb 2020
EOI Close Date
13 Feb 2020
This work package has been awarded to the companies below

PT Profab Indonesia

Mr. Paul McFarlane +61 (0)4 8873 1088 paul.mcfarlane@NOV.com

Please see SOW for further details on this package

Status
Awarded
EOI Open Date
03 Feb 2020
EOI Close Date
13 Feb 2020
This work package has been awarded to the companies below

Birwelco Limited

Bryan Senior +44 121 585 3979 B.Senior@unitbirwelco.com

Please refer to SOW for further details pertaining to this package.

Status
Awarded
EOI Open Date
17 Feb 2020
EOI Close Date
27 Feb 2020
This work package has been awarded to the companies below

FPE Sontum AS

Pal Vidar Stokvik +47 413 04 760 pal.stokvik@fpe.no

See scope for full details

Status
Awarded
EOI Open Date
18 Feb 2020
EOI Close Date
28 Feb 2020
This work package has been awarded to the companies below

MIZCO Pty Ltd

James Watson +61 8 9247 6000 watsonj@mizco.com.au

Please refer to SOW for further details pertaining to this package.

Status
Awarded
EOI Open Date
24 Feb 2020
EOI Close Date
05 Mar 2020
This work package has been awarded to the companies below

NOV Process & Flow Technologies AS

Mr. Svein Erik Hjortland +44 47 93 44 37 37 sveinerik.hjortland@nov.com

Please refer to SOW for further details pertaining to this package.

Status
Awarded
EOI Open Date
24 Feb 2020
EOI Close Date
05 Mar 2020
This work package has been awarded to the companies below

PT Profab Indonesia

Mr. Paul McFarlane +61 (0)4 8873 1088 paul.mcfarlane@NOV.com

Please refer to SOW for further details pertaining to this package.

Status
Awarded
EOI Open Date
24 Feb 2020
EOI Close Date
06 Mar 2020
This work package has been awarded to the companies below

BROWN FINTUBE France SA

Mr. Eric Noireterre +33 (0) 6 80 68 79 76 eric.noireterre@ait-stein.com

Please refer to SOW for further details pertaining to this package.

Status
Awarded
EOI Open Date
25 Feb 2020
EOI Close Date
09 Mar 2020
This work package has been awarded to the companies below

Viking Norsafe Life-Saving Equipment

Joe Dawes +47 3788 8549 jdaw@viking-life.com

*SOFT AND METAL SEATED Valves - Please refer to SOW for further details pertaining to this package.

Status
Awarded
EOI Open Date
27 Feb 2020
EOI Close Date
09 Mar 2020
This work package has been awarded to the companies below

OMS SALERI S.p.A

Andrea Gnecchi +39 0365 826611 a.gnecchi@oms-saleri.com

Please refer to SOW for further details pertaining to this package.

Status
Awarded
EOI Open Date
07 Apr 2020
EOI Close Date
20 Apr 2020
This work package has been awarded to the companies below

ORTON S.r.l.

Mr. Cristian Chiozza +39 0523 762525 cristian.chiozza@imi-critical.com

Please refer to SOW for further details pertaining to this package.

Status
Awarded
EOI Open Date
08 Apr 2020
EOI Close Date
20 Apr 2020
This work package has been awarded to the companies below

O.M.S. SALERI S.p.A.

Mr. Tarek Cherri +39 344 0808454 t.cherri@oms-saleri.com

Please refer to SOW for further details pertaining to package.

Status
Awarded
EOI Open Date
20 Apr 2020
EOI Close Date
04 May 2020
This work package has been awarded to the companies below

Vicinay Marine S.L.

Alex Nicol +44 (0) 208 446 6001 alexnicol@vicinaymarine.com

Please see SOW for further details pertaining to this package.

Status
Awarded
EOI Open Date
20 Apr 2020
EOI Close Date
04 May 2020
This work package has been awarded to the companies below

Arcelormittal

Mr.Morten Breddam +45 521 935 09 morten.breddam@arcelormittal.com

Please refer to SOW for further details pertaining to this work.

Status
Awarded
EOI Open Date
10 Feb 2021
EOI Close Date
23 Feb 2021
This work package has been awarded to the companies below

Trelleborg Singapore Pte Ltd

Mr. Vincent Tan +65 8828 8585 vincent.tan@trelleborg.com

Please see full scope of work (SOW) for details on the package

Status
Awarded
EOI Open Date
05 Aug 2021
EOI Close Date
18 Aug 2021
This work package has been awarded to the companies below

STATRON Manufacturing Sdn Bhd

Ms. Pearly Liew +60 3-6151 1900 pearly.liew.my@statron.com

Please see scope of work document for full details

Status
Awarded
EOI Open Date
22 Sep 2021
EOI Close Date
12 Oct 2021
This work package has been awarded to the companies below

Draeger Malaysia Sdn. Bhd.

Aina Amilina Binti Hussin +603 5022 2000 ainaamilina.hussin@draeger.com

Please see full scope of work document for further details

Status
Awarded
EOI Open Date
22 Sep 2021
EOI Close Date
05 Oct 2021
This work package has been awarded to the companies below

FRAMO

Mr. Paul Ringheim 4755999000 pari@framo.no

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
21 Mar 2025
EOI Close Date
18 Apr 2025
This work package has been awarded to the companies below

Normand Drift AS

Guan Sheng Chai Commercial Manager Solstad

Siem Offshore PSV AS

John Annat General Manager APAC Level 3, 1060 Hay Street, West Perth WA 6005 M: + 61 (0) 408 703 387 E-mail: John Annat ja@auroraoffshore.com

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
21 Mar 2025
EOI Close Date
18 Apr 2025
This work package has been awarded to the companies below

FUGRO AUSTRALIA PTY LTD

location_on
Unit level 1 1060 Hay Street West Perth WA 6005 AU
Contact
person_outline
Elaine Pankhurst
email

Please refer to the Scope of Work for further Information

Status
Awarded
EOI Open Date
25 Jul 2025
EOI Close Date
08 Aug 2025
This work package has been awarded to the companies below

Cyan Renewables Holdings Pty Ltd

Cyan Subsea Pty Ltd. Ethan Tan - Commercial Engineer P: +61 406 623 238 E-Mail: Ethan.Tan@cyanrenewables.com

Please refer to SOW for further details pertaining to this package.

Status
Awarded
EOI Open Date
07 Apr 2020
EOI Close Date
20 Apr 2020
This work package has been awarded to the companies below

Emerson Asia Pacific Pte Ltd

Mr. Nalluri Bhasker Rao +65 67708223 bhaskerrao.nalluri@emerson.com

Please refer to SOW for more information pertaining to this package.

Status
Awarded
EOI Open Date
20 Feb 2020
EOI Close Date
01 Mar 2020
This work package has been awarded to the companies below

INCOS ENGINEERING PTY LTD

Harshal Mankar +61 862 527 908 hma@incos-e.com

Please review the scope of works document for more details of the package.

Status
Awarded
EOI Open Date
16 Dec 2019
EOI Close Date
10 Jan 2020
This work package has been awarded to the companies below

Worthington S.r.l

Mr. Balraj Hooda +91 9718056032 bhooda@flowserve.com

Please see scope for full details

Status
Awarded
EOI Open Date
18 Feb 2020
EOI Close Date
28 Feb 2020
This work package has been awarded to the companies below

MIZCO Pty Ltd

James Watson +61 8 9247 6000 watsonj@mizco.com.au

Please refer to SOW for further details pertaining to this package.

Status
Awarded
EOI Open Date
23 Apr 2020
EOI Close Date
04 May 2020
This work package has been awarded to the companies below

MIZCO Pty Ltd

James Watson +61 8 9247 6000 watsonj@mizco.com.au

Please refer to the scope of works document for details of the package

Status
Awarded
EOI Open Date
03 Feb 2020
EOI Close Date
13 Feb 2020
This work package has been awarded to the companies below

PT Profab Indonesia

Mr. Paul McFarlane +61 (0)4 8873 1088 paul.mcfarlane@NOV.com

Please refer to the scope of works document for details of the package

Status
Awarded
EOI Open Date
03 Feb 2020
EOI Close Date
13 Feb 2020
This work package has been awarded to the companies below

Vahterus OY

Mr. Riku Aerikkala +358 44 742 7007 riku.aerikkala@vahterus.com

Please refer to the scope of works document for details of the package

Status
Awarded
EOI Open Date
03 Feb 2020
EOI Close Date
13 Feb 2020
This work package has been awarded to the companies below

SCHNEIDER ELECTRIC (AUSTRALIA) PTY LTD

Steven Briggs +617 3635 7724 Steven.briggs@se.com

See scope for full details

Status
Awarded
EOI Open Date
14 Oct 2021
EOI Close Date
29 Oct 2021
This work package has been awarded to the companies below

ORION S.p.A

Contact Person: Chiara Meani Contact Number: +39 040 9713 (Ext.237) Contact Email: c.meani@orionvalves.com

Please refer to SOW for further details pertaining to this package.

Status
Awarded
EOI Open Date
21 Apr 2020
EOI Close Date
01 May 2020
This work package has been awarded to the companies below

Red Fox Environmental Services

Red Fox Environmental Services, Inc Contact: Justin Emerson email: justin@redfoxenviro.com Phone: +1 3378563709

Please refer to SOW for further details pertaining to this work.

Status
Awarded
EOI Open Date
20 Feb 2020
EOI Close Date
01 Mar 2020
This work package has been awarded to the companies below

HADETEC B.V

Rene Hageman +31(0)33-247 1060 rene.hageman@hadetec.com

Please refer to the scope of works document for details of the package

Status
Awarded
EOI Open Date
03 Feb 2020
EOI Close Date
13 Feb 2020
This work package has been awarded to the companies below

ABB Australia Pty Ltd

Steve Hollyoak +61 (0) 419 233 763 steve.hollyoak@au.abb.com

Please see scope of work document for further information

Status
Awarded
EOI Open Date
22 Sep 2021
EOI Close Date
05 Oct 2021
This work package has been awarded to the companies below

Himile Mechanical Manufacturing (Shandong)

Ms. Jane Li 8618353611122 Jane.Li@himile.com

Please refer to the scope of works for details of the package

Status
Awarded
EOI Open Date
09 May 2019
EOI Close Date
06 Jun 2019
This work package has been awarded to the companies below

COSCO Shipping Shipyard (Nantong) Co Ltd

Yu Jian +86 0513 85056209 y.jian@coscoshipping.com
lock
Login to View Details
Login

Please refer to SOW for further details pertaining to this package.

Status
No longer required
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Please refer to SOW for further details pertaining to this package.

Status
No longer required
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Please see full scope of work document for further details

Status
No longer required
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
Loading...