SIRROM CORPORATION (AUST.) PTY LTD
BORUMBA PUMPED HYDRO PROJECT - TEMPORARY WORKERS ACCOMMODATION CAMPS - OPERATIONS AND MAINTENANCE
Borumba Pumped Hydro Project
The proposed Borumba Pumped Hydro Project is a long duration pumped hydro energy storage system being developed at Lake Borumba and surrounding areas located in between Imbil, west of the Sunshine Coast, and Jimna in the Somerset region.
The site was identified more than 40 years ago in the 1980s as having significant potential for a pumped hydro scheme because of ideal topography, an existing reservoir, and geological stability. The proposed project site is on State land and is on the traditional country of the Kabi Kabi People.
As project developer, Queensland Hydro is currently undertaking early works onsite, technical investigations, project planning, design and community work while important regulatory approvals continue to be progressed.
Temporary Workers Accommodation Camps - Operations and Maintenance
Queensland Hydro has engaged Sirrom Corporation (Aust.) Pty Ltd to deliver operations and maintenance services for the Temporary Workers Accommodation Camps associated with the proposed Borumba Pumped Hydro Project.
Established in 1966, Sirrom Corporation is an Australian-owned business, committed to providing accommodation and facility services for mining and energy operations and their workforces. Operating in over 35 locations nationally, with a workforce of more than 800 staff, we have earned our reputation through consistent delivery of tailored catering and hospitality services to remote accommodation facilities.
- Camp management, reception and administration.
- Bus transport services.
- Cleaning services.
- Food and beverage supply.
- Laundry services.
- Maintenance services (including roads, grounds and gardens).
- Pest/vermin control services.
- Potable water supply.
- Power supply.
- Security services and equipment supply/installation.
- Waste management services.
- Security and management of weed hygiene requirements at Security and Access Control Stations.
- Operation of a wet mess and supply of 2x gas barbeques.
- Operation of an incidental store (at reception).
- Supplementary services such as physical trainer and well-being services.
- Provision of internet, free to air and communications.
- All other incidental and peripheral things necessary for the good and efficient operation of a camp such as this.
Engaging local and First Nations suppliers
Sirrom Corporation is committed to providing opportunities for local and First Nations businesses and individuals through procurement, employment, and training and skills development - especially in the Somerset, Gympie, Sunshine Coast Hinterland, and surrounding areas.
Registration of Interest
Businesses interested in supplying Sirrom Corporation (Aust) Pty Ltd are encouraged to register interest via Gateway by ICN.
Current Registration of Interest (ROI) opportunities can be found in the Work Packages tab below.
When submitting your Registration of Interest (ROI), please ensure the following:
- Your company profile on Gateway by ICN is complete, up-to-date and accurate, including selecting the option to receive email notifications about supply opportunities.
- You register interest as a full or partial scope supplier, where applicable.
- You respond to all project and work package-specific questions.
- Incomplete submissions may not be considered.
Businesses submitting an ROI should be aware that submission does not guarantee progression to the next stage of the procurement process. Only those organisations that clearly demonstrate the capability and capacity to meet Sirrom Corporation's requirements will be invited to pre-qualify for specific opportunities
For guidance on creating a Gateway by ICN company profile and submitting an ROI, please refer to the ICN User Guides below.
Gateway by ICN company profile
Your Gateway by ICN company profile, along with any submitted ROI, is used to assess your organisation's capability to deliver on project requirements.
Click here to create a new company profile or login to update an existing one.
We encourage you to invest the time and effort needed to ensure your profile accurately and effectively represents your business.
Sirrom Corporation (Aust.) Pty Ltd strongly recommends that suppliers contact the Industry Capability Network (ICN) as a first step to gain a better understanding of the ROI process.
Further assistance
For Gateway by ICN support and profile updates, email the ICN team at info@icnqld.org.au
For all other enquiries, email the Sirrom team at procurement@sirromcorp.com.
Key Documents
Gateway by ICN - Profile User Guide
Gateway by ICN - EOI User Guide
SIRROM CORPORATION (AUST.) PTY LTD
QLD Australia
Project Primary Contact
Work Packages
This work package involves the supply and delivery of diesel fuel to support ongoing operations and project activities. The successful supplier will be responsible for providing high-quality diesel in accordance with Australian standards, ensuring timely and reliable delivery to designated project sites.
Scope Includes:
- Bulk supply of diesel fuel suitable for heavy machinery, generators, and transport vehicles.
- Delivery to remote or regional locations as specified by the project schedule.
- Compliance with all relevant safety, environmental, and fuel handling regulations.
- Provision of fuel usage tracking and reporting (if applicable).
- Emergency delivery capabilities and contingency planning.
Requirements:
Proven experience in fuel logistics and delivery.
Valid licenses and certifications for fuel transport and handling.
Ability to meet fluctuating demand and delivery timelines.
Demonstrated commitment to safety and environmental standards.
Each camp will be powered by four 350 KVa generators and minimum of one 20KVa emergency generators. Diesel supply for camp vechiles.
Full Scope
This work package involves the collection, transport, and disposal of hard waste materials generated during project activities. The successful contractor will be responsible for managing non-hazardous bulky waste in compliance with environmental regulations and site-specific waste management protocols.
Scope Includes:
- Collection of hard waste.
- Collection of recyclable materials.
- Transport to approved waste processing or disposal facilities.
- Provision of appropriate bins, skips, or containers for on-site waste storage.
- Documentation and reporting of waste volumes and disposal methods.
Requirements:
Valid waste transport and disposal licenses.
Proven experience in commercial or industrial waste management.
Compliance with local council and environmental regulations.
Ability to meet scheduled pickups and respond to ad hoc removal requests.
Commitment to sustainability and recycling practices where applicable.
Full Scope
This work package involves the collection, transport, and disposal of oil waste and grease trap contents from project sites. The successful contractor will be responsible for managing liquid waste in accordance with environmental regulations and health standards, ensuring safe and efficient removal from designated facilities.
Scope Includes:
- Scheduled and on-demand servicing of grease traps and oil waste containers.
- Transport of waste to licensed treatment or disposal facilities.
- Cleaning and maintenance of grease traps to prevent blockages and odours.
- Provision of compliant waste storage units, if required.
- Documentation and reporting of waste volumes and disposal methods.
Requirements:
Valid licenses for liquid waste transport and disposal.
Proven experience in grease trap servicing and oil waste management.
Compliance with local environmental and wastewater regulations.
Ability to meet service schedules and respond to urgent requests.
Commitment to hygiene, safety, and sustainability practices.
Full Scope
This work package covers the supply and delivery of potable (drinking) water to support project operations, workforce amenities, and site requirements. The successful supplier will be responsible for providing safe, high-quality drinking water in compliance with Australian Drinking Water Guidelines and relevant health and safety standards.
Scope Includes:
- Bulk supply of potable water suitable for human consumption.
- Delivery to designated project sites, specified by the project schedule..
- Supply of quality assurance documentation as requested.
- Emergency delivery capabilities and contingency planning.
Requirements:
Accreditation and compliance with local and national water safety regulations.
Proven experience in potable water logistics and delivery.
Ability to meet variable demand and delivery schedules.
Demonstrated commitment to hygiene, safety, and environmental standards.
Full Scope
This work package involves the safe and compliant removal, transport, and disposal of sewerage waste from project sites. The successful contractor will be responsible for managing liquid waste generated from temporary amenities, holding tanks, or other on-site wastewater systems in accordance with environmental and public health regulations.
Scope Includes:
- Scheduled and ad hoc collection of sewerage waste from designated locations.
- Transport of waste to licensed treatment or disposal facilities.
- Provision and maintenance of appropriate waste storage units (e.g., holding tanks or portable toilets), if required.
- Compliance with all relevant environmental, health, and safety standards.
- Record-keeping and reporting of waste volumes and disposal activities.
Requirements:
Valid licenses for liquid waste transport and disposal.
Proven experience in sewerage waste management for industrial or construction sites.
Capability to respond promptly to service requests and emergencies.
Demonstrated commitment to hygiene, safety, and environmental protection.
Full Scope
This work package is intended for suppliers who wish to express interest in the TWAC project but whose capabilities, products, or services are not specifically covered by the currently listed work packages.
Organisations are invited to provide a brief overview of their offerings and relevant experience that may be of value to the TWAC project in future phases or unlisted scopes of work.
