NORTHERN STAR RESOURCES LTD

Hemi Gold Project

Overview

The Hemi Project is a greenfield gold development forming part of the Northern Star's long-term regional growth strategy. The project involves establishing a new open-pit mining operation, gold processing plant and the supporting non-process infrastructure. A final investment decision is due in 2027 for a two and half year construction period.

The Project is located within 60 minute drive from the ports and regional centers of Port Hedland and Karratha. The region is rich with critical infrastructure to support a future mining operation including two major sealed highways that run within 20km of the Hemi discovery, a gas pipeline located 5km and 20km from Hemi, and a major 220kV electricity transmission line which also lies within 20km of Hemi.

The Processing Plant will be delivered through an Engineering, Procurement, and Construction Management (EPCM) delivery model. Ore is initially treated via a multi-stage comminution circuit utilising two stages of crushing, high pressure grinding rolls, ball milling and classification. The comminution circuit product is fed to a flotation circuit with flotation concentrate reporting to the POx circuit and flotation tailings to the CIL neutralisation circuit. The POx circuit is utilised to oxidise the refractory sulphide minerals to enable liberation and recovery of encapsulated gold. Following oxidation, the process transitions to a conventional carbon-in-leach (CIL) circuit for gold adsorption and final extraction via elution and electrowinning.

Supporting the processing plant will be a range of non-process infrastructure. The engineering, procurement and construction of the non-process infrastructure will be supported by a Project Management Consultant working on an integrated basis with Northern Star.

Northern Star will undertake the sourcing and selection of suppliers for the project through an open tender process. Northern Star will utilise the ICN network to publish upcoming tenders and supply opportunities. Interested suppliers may be included in the Request for Tender process. However, in some circumstances, Northern Star may choose to use an existing supplier to leverage off their specific experience and knowledge.

Northern Star will actively seek and show preference to Suppliers who demonstrate a commitment to Work Health and Safety environmental, social and governance practices in alignment with Northern Star's Supplier Code of Conduct available on the Northern Star website. Northern Star encourages participation from local, regional, Indigenous owned and diverse suppliers as apart of the procurement approach.

Additional project information Hemi Project | Northern Star

Northen Star Supplier Information Suppliers | Northern Star

Hemi Gold Project

NORTHERN STAR RESOURCES LTD

location_on

WA Australia


Project Primary Contact
person_outline
Hengameh Kiani
phone
+61 08 9365 7543
mail Send Email
Work Package
EOI Open Date
EOI Close Date
Status

This is only the award information package

Status
Awarded
EOI Open Date
26 May 2026
EOI Close Date
05 Jun 2026
This work package has been awarded to the companies below

WOOD AUSTRALIA PTY LTD

location_on
L1 240 St. Georges Terrace PERTH WA 6000 AU

This is only the award information package

Status
Awarded
EOI Open Date
20 May 2026
EOI Close Date
30 May 2026
This work package has been awarded to the companies below

METSO AUSTRALIA PTY LTD

location_on
Level 2, 1110 Hay Street WEST PERTH WA 6005 AU

This is only the award information package

Status
Awarded
EOI Open Date
20 May 2026
EOI Close Date
30 May 2026
This work package has been awarded to the companies below

METSO AUSTRALIA PTY LTD

location_on
Level 2, 1110 Hay Street WEST PERTH WA 6005 AU

This is only the award information package

Status
Awarded
EOI Open Date
20 May 2026
EOI Close Date
30 May 2026
This work package has been awarded to the companies below

METSO AUSTRALIA PTY LTD

location_on
Level 2, 1110 Hay Street WEST PERTH WA 6005 AU

This is only the award information package

Status
Awarded
EOI Open Date
20 May 2026
EOI Close Date
30 May 2026
This work package has been awarded to the companies below

METSO AUSTRALIA PTY LTD

location_on
Level 2, 1110 Hay Street WEST PERTH WA 6005 AU

This is only the award information package

Status
Awarded
EOI Open Date
20 May 2026
EOI Close Date
30 May 2026
This work package has been awarded to the companies below

GREENLAND PTY LTD

location_on
7 Boreham St Cottesloe WA 6011 AU

This is only the award information package

Status
Awarded
EOI Open Date
25 May 2026
EOI Close Date
04 Jun 2026
This work package has been awarded to the companies below

ANTRAK LOGISTICS PTY LTD

location_on
Unit 1 10 Hines Road O'Connor WA 6163 AU

This is only the award information package

Status
Awarded
EOI Open Date
25 May 2026
EOI Close Date
04 Jun 2026
This work package has been awarded to the companies below

BOC Australia

location_on
57 Baile Road CANNING VALE WA 6155 AU

This is only the award information package

Status
Awarded
EOI Open Date
25 May 2026
EOI Close Date
04 Jun 2026
This work package has been awarded to the companies below

METSO AUSTRALIA PTY LTD

location_on
Level 2, 1110 Hay Street WEST PERTH WA 6005 AU

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
20 May 2026
EOI Close Date
30 May 2026
This work package has been awarded to the companies below

ADD BUSINESS GROUP PTY LTD

location_on
225 Kelvin Road Orange Grove WA 6109 AU

This is only the award information package

Status
Awarded
EOI Open Date
20 May 2026
EOI Close Date
30 May 2026
This work package has been awarded to the companies below

ANTRAK LOGISTICS PTY LTD

location_on
Unit 1 10 Hines Road O'Connor WA 6163 AU

This is only the award information package

Status
Awarded
EOI Open Date
20 May 2026
EOI Close Date
30 May 2026
This work package has been awarded to the companies below

EKATO CORPORATION

location_on
Unit suite 39 328 Albany Highway Victoria Park WA 6100 AU

This is only the award information package

Status
Awarded
EOI Open Date
20 May 2026
EOI Close Date
30 May 2026
This work package has been awarded to the companies below

WEIR MINERALS AUSTRALIA LTD

location_on
36 Stockyards Lane HAZELMERE WA 6055 AU

This is only the award information package

Status
Awarded
EOI Open Date
20 May 2026
EOI Close Date
30 May 2026
This work package has been awarded to the companies below

WEIR MINERALS AUSTRALIA LTD

This is only the award information package

Status
Awarded
EOI Open Date
26 May 2026
EOI Close Date
05 Jun 2026
This work package has been awarded to the companies below

SANDVIK ROCK PROCESSING AUSTRALIA PTY LIMITED

location_on
17 Marriott Road JANDAKOT WA 6164 AU

This is only the award information package

Status
Awarded
EOI Open Date
26 May 2026
EOI Close Date
05 Jun 2026
This work package has been awarded to the companies below

Knight Material Technologies

Knight Material Technologies

This is only the award information package

Status
Awarded
EOI Open Date
20 May 2026
EOI Close Date
30 May 2026
This work package has been awarded to the companies below

Cimtas

Cimtas
Loading...