NORTHERN STAR RESOURCES LTD

KCGM Growth Project - Northern Star Resources Limited (Kalgoorlie)

Overview

The primary objective of the KCGM Growth Project is to expand the processing capacity of Northern Star's Fimiston Processing Plant (Kalgoorlie, WA) from the current 13 Mtpa to approximately 27 Mtpa through suitable upgrades, enhancements and modifications of existing facilities and infrastructure to meet the increased target capacity.

Early works construction for the Project commenced in July 2023 and, at this stage, comprises minor bulk earthworks, site clearance works and Enabling Works which include buried services, infrastructure (SMPEI), deconstruction and firewater/scheme water works. These early works also involve the upgrading of the Fimiston site's existing telecommunications and power supply networks.

A Major Equipment Package (Primary Crusher, SAG Mill, Ball Mill, Flotation Cells, Thickener etc.) has also been awarded to FLSmidth Pty Ltd. Associated equipment and services (Mill Reliner, Third Party expediting and inspection and freight and logistics)packages are in the process of being awarded or tendered.

The main Processing Plant construction works contract for the Project (Engineering, Procurement and Construction contract) has been awarded to Primero Group Limited and will include engineering, design, supply, construction, commissioning and testing of the expanded Fimiston Processing Plant. The EPC construction works are expected to commence in January 2024 and feature the following:

- Wet Plant: All work, services, equipment and infrastructure necessary to process, leach and recover gold from the total flotation tailings and total concentrate produced by the expanded Plant at the Fimiston site. This includes concentrate handling, flotation tail leaching, associated reagents, consumables, services (air and water systems) and utilities;
- Earthworks: Bulk earthworks and detailed earthworks, roads, pads, bollards, signage, buried services and drainage;
- All other works or services necessary to deliver the Processing Plant expansion works.

The KCGM Growth Project will also involve a Brownfields scope of work, such as tie-ins to the current Fimiston Processing Plant and the modification and refurbishment of existing plant and equipment. A later phase of the Project will involve the construction of a new Tailings Storage Facility to cater for the expanded production capacity of the upgraded Processing Plant.

Procurement of goods and services associated with the KCGM Growth Project has commenced (by way of seeking Expressions of Interest and the issuing of various Tender packages) and is expected to be ongoing on this basis for the duration of the Project. These packages are expected to include, for example, borefield upgrade, waste water plant upgrade, security fencing and access, demolition and the supply of associated goods (pumps, spares etc.).

Inclusion as a Northern Star approved supplier or a contracting party involves, among other things, agreement to Northern Star's Purchase Order Standard Terms and Conditions or the execution of a formal Goods and Services Agreement, adherence to Northern Star's company policies and procedures and the holding of all relevant insurances.

KCGM Growth Project - Northern Star Resources Limited (Kalgoorlie)

NORTHERN STAR RESOURCES LTD

location_on

WA Australia


Project Primary Contact
person_outline
Hengameh Kiani
phone
+61 08 9365 7543
mail Send Email
Work Package
EOI Open Date
EOI Close Date
Status

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
28 Sep 2023
EOI Close Date
20 Oct 2023
This work package has been awarded to the companies below

REXEL ELECTRICAL SUPPLIES PTY LTD

Rexel Electrical Supplies Pvt Ltd.

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
28 Sep 2023
EOI Close Date
20 Oct 2023
This work package has been awarded to the companies below

CABLE GRID AUSTRALIA PTY LTD

location_on
Unit suite 3 47 Park Road Milton QLD 4064 AU

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
29 Sep 2023
EOI Close Date
13 Oct 2023
This work package has been awarded to the companies below

Kone Cranes and Demag

Kone Cranes and Demag

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
25 Aug 2023
EOI Close Date
08 Sep 2023
This work package has been awarded to the companies below

QANTAS AIRWAYS LIMITED

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
25 Aug 2023
EOI Close Date
08 Sep 2023
This work package has been awarded to the companies below

ATCO

ATCO

Please refer to scope of work document for additional information pertaining to this package.

Status
Awarded
EOI Open Date
31 Aug 2023
EOI Close Date
21 Sep 2023
This work package has been awarded to the companies below

WEIR MINERALS AUSTRALIA LTD

location_on
19 Searle Road Perth Airport WA 6105 AU

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
05 Sep 2023
EOI Close Date
19 Sep 2023
This work package has been awarded to the companies below

Blue Diamond Machinery I Brooks Hire I Northfleet I Onsite Rentals

Package Awarded to: Blue Diamond Machinery I Brooks Hire I Northfleet I Onsite Rentals.

Please refer to the Scope of Work for further detail pertaining to this package.

Status
Awarded
EOI Open Date
06 Sep 2023
EOI Close Date
20 Sep 2023
This work package has been awarded to the companies below

HOLCIM (AUSTRALIA) PTY LTD

location_on
1 Fairbank Place SWANBANK QLD 4306 AU

Please refer to the Scope of Work for further detail pertaining to this package.

Status
Awarded
EOI Open Date
06 Sep 2023
EOI Close Date
22 Sep 2023
This work package has been awarded to the companies below

ALTRAD SERVICES PTY LTD

ALTRAD SERVICES PTY LTD

Please refer to the Scope of Work for further detail pertaining to this package.

Status
Awarded
EOI Open Date
06 Sep 2023
EOI Close Date
20 Sep 2023
This work package has been awarded to the companies below

Catalpa

Catalpa

Please refer to the scope of work for additional details pertaining to this package.

Status
Awarded
EOI Open Date
11 Sep 2023
EOI Close Date
02 Oct 2023
This work package has been awarded to the companies below

ABB

ABB

Please refer to the Scope of Work for further detail pertaining to this package.

Status
Awarded
EOI Open Date
15 Sep 2023
EOI Close Date
09 Oct 2023
This work package has been awarded to the companies below

Siemens Ltd

Siemens Ltd

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
31 Aug 2023
EOI Close Date
20 Sep 2023
This work package has been awarded to the companies below

General Cranes

General Cranes

Please refer to the Scope of Work for further detail pertaining to this package.

Status
Awarded
EOI Open Date
15 Sep 2023
EOI Close Date
09 Oct 2023
This work package has been awarded to the companies below

ABB

ABB

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
31 Aug 2023
EOI Close Date
22 Sep 2023
This work package has been awarded to the companies below

MDHI

MDHI

Please refer to the scope of work for additional information pertaining to this package.

Status
Awarded
EOI Open Date
15 Sep 2023
EOI Close Date
09 Oct 2023
This work package has been awarded to the companies below

Innomatics (Siemens)

Innomatics (Siemens)

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
24 Aug 2023
EOI Close Date
08 Sep 2023
This work package has been awarded to the companies below

CARRIER AUSTRALIA PTY LTD

location_on
38A Walters Drive OSBORNE PARK WA 6017 AU

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
11 Mar 2024
EOI Close Date
26 Mar 2024
This work package has been awarded to the companies below

CAPS AUSTRALIA PTY LTD

location_on
185 Planet Street WELSHPOOL WA 6106 AU

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
19 Mar 2024
EOI Close Date
12 Apr 2024
This work package has been awarded to the companies below

Austruct Industries Pty Ltd

location_on
14 Arthur Road Wattle Grove WA 6107 AU

Please refer to scope of work document for additional details pertaining to this package.

Status
Awarded
EOI Open Date
27 Sep 2023
EOI Close Date
18 Oct 2023
This work package has been awarded to the companies below

POWINS PTY LTD

Please refer to the Scope of Work for further detail pertaining to this package.

Status
Awarded
EOI Open Date
15 Sep 2023
EOI Close Date
09 Oct 2023
This work package has been awarded to the companies below

BESCA Industrial

BESCA Industrial

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
04 Sep 2023
EOI Close Date
19 Sep 2023
This work package has been awarded to the companies below

NMT INTERNATIONAL (AUSTRALIA) PTY LTD

location_on
Suite 16, 524 Abernethy Road KEWDALE WA 6105 AU

Please refer to the SOW for further details pertaining to the package.

Status
Awarded
EOI Open Date
28 Sep 2023
EOI Close Date
20 Oct 2023
This work package has been awarded to the companies below

PIC PTY LTD

PIC PTY LTD

Please refer to the scope of work for additional details pertaining to this package.

Status
Awarded
EOI Open Date
15 Sep 2023
EOI Close Date
09 Oct 2023
This work package has been awarded to the companies below

Austruct Industries Pty Ltd

location_on
14 Arthur Road Wattle Grove WA 6107 AU

Please refer to the SOW for further details pertaining to the package

Status
Awarded
EOI Open Date
19 Mar 2024
EOI Close Date
11 Apr 2024
This work package has been awarded to the companies below

ACU-TECH PIPING SYSTEMS

location_on
119 Kelvin Road MADDINGTON WA 6109 AU
lock
Login to View Details
Login

Please refer to the SOW for further details pertaining to the package.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Please note package has been combined with package PP03A.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Please note that package has been combined with package EL15A.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
Loading...