About The Company - Hydrostor
.A-CAES NSW Pty Ltd (A-CAES NSW) is proposing the Silver City Energy Storage (SCES) Project (the Project), which will use Hydrostor's proprietary advanced compressed air energy storage (A-CAES) technology to provide large-scale, long-duration energy storage for Broken Hill and the Far West of NSW.
The project capacity is anticipated to be 200 megawatt (MW) generation and 1600 megawatt hours (MWh) of energy storage, including a reserve of 250 MWh (50 MW of electricity for up to hours) to provide back-up power to Broken Hill and the Far West
The Project includes the SCES Facility and a new 220 kV electricity transmission line approximately 16 km in length. The proposed SCES Facility is to be co-located on the Potosi Mine site, approximately 3 km northeast of Broken Hill between the Silver City and Barrier Highways.
The proposed transmission line passes between South Broken Hill and the airport, connecting to an existing Transgrid substation in Pinnacles Road.
The Project involves the design, construction and operation of the SCES Facility, including
ancillary power, water and road infrastructure. The key project components include:
Your ICN Gateway company profile and any registrations of interest you submit are used to assess your organisation's ability to complete projects.
Please see below to assist with creating a new company profile or to login and amend your existing company profile.
Please ensure your business invests the time and energy required to represent itself in the most effective manner possible when completing and/or updating your company profile.