KENT PROJECTS PTY LTD & VALMEC AUSTRALIA PTY LTD

Hunter Valley Hydrogen Hub Project (HVHH)

Overview

Introduction

Valmec Kent Joint Venture (VKJV) have been engaged formally by Origin Energy Future Fuels (Origin) to execute a Front End Engineering and Design (FEED) for the initial phase of the Project.

Following delivery of FEED, the strategy is for VKJV to take the Project through full EPC execution, subject to appropriate approvals being achieved.

As part of the early FEED phase, VKJV is looking to get some high-level budget pricing on key selected packages to understand the Order of Magnitude cost. A formal inqury for these packages will be followed in due course once the engineering is progressed to sufficient detail.

Project Background

The Project objective is to develop an integrated group of production and distribution assets required to establish a hydrogen hub. Hydrogen will be produced from recycled water and renewable electricity using a grid-connected 60MW (nominal) electrolyser.

Hydrogen gas will then be directed to multiple end uses, including:

Local Industry manufacturing Hydrogen will be supplied via pipeline to Orica's Kooragang Island ammonia manufacturing facility.

Heavy vehicles and public transport Hydrogen will be compressed and distributed by road to public and transport industry refueling depots for use in trucking and passenger bus operations in the Hunter, Central Coast, and Greater Sydney regions. The project will include two satellite hydrogen refueling stations supplied with hydrogen by tube trailers filled at the production facility. A hydrogen refueling station will also be included at the production facility.

More information about this project you may find here.


How to register an Expression of Interest (EOI)

- Work packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to the 'EOI User Guide' below for instructions and assistance to submit an EOI.

- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.

- Please dowload "EOI Capabilities & Experience Questionnaire" from Project Documents section below, and provide all answers. When you will register your EOI, the system will prompt you to upload your completed document. Providing all answers is mandatory and decision on further steps will be based on information you provided in your Gateway profile and the answers in this questionnaire.


ICN Gateway Company Registration

- Click here to register your company profile on ICN Gateway.

- Support and assistance are available through the document 'Creating an ICN Gateway Company Profile' below.

- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

Hunter Valley Hydrogen Hub Project (HVHH)

KENT PROJECTS PTY LTD & VALMEC AUSTRALIA PTY LTD

location_on

NSW Australia


Project Primary Contact
person_outline
Dusko Bajic
badge
Industry Manager
phone
+61 4 1732 3636
mail Send Email

01 Subcontracts

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login

Sewage connection

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

H2 Pipeline to Orica Design & Instal ( include CP)

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Water Supply Pipeline

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Waste Water Pipeline

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Installation of H2 Refueller Stations

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Pipe Spool Fabrication

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI

02 Engineering, & Material Supply

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login

H2 Pigging Station ( Launcher and Receiver )

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Mobility Equipment Package( including High Pressure H2 Storage vessels and Tube and trailers)

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Cooling tower

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Demineraliser (RO) Unit Packages

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Dryer / Chiller Packages

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Transformers Power

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Orica Custody Transfer Skid

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Harmonics Filters

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Statcom

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Fiscal Metering to Orcia

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

MV Switchgear (3.3kV MCC) MCCs UPS Battery Charger

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

ICSS

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Deoxygeniser Packages

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI

03 Material Supply

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login

Motor Operated Valves (LLI)

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Analysers

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Condition Monitoring

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Electrical Bulks Packages (incl. the below) Glands Grounding System Lighting System Cable Trays Junction Boxes

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Bolts & Nuts, Gaskets

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Instrument Air Compressor Package

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

F&G Detector

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Other Pumps

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Control Valves

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Instrument Package (incl. the below) Flow Nozzles Flow Meters (LLI) On-Off Valves (LLI) Pressure & Temperature Gauges Tube & Fittings, Pre-insulated Tubes Flex Thermocouples

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Buffer H2 Storage vessels

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

H2 Compressors

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Field Erected Tanks ( D& C package)

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Fire Water Pumps

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Manual Valves

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Plate Material

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Fire Fighting equipment

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Cables (incl FOC) and HV Terminations

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Safety Valves

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Pipe Supports

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Security Systems (ACS) Permanent PAGA and CCTV System Poles for PAGA and CCTV Comms Equip

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

H2 Isolation Valve

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

SS Pipe and Fittings CS Seam & SMLS Pipe

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Waste Water Isolation Valve

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Cooling water pumps

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Diesel Gen-set

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Nitrogen Storage Package

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Cooling Tower Chemicals

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI

04 Facilities

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login

Permanent building

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI

05 Services & Miscellaneous

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login

Survey Services

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Telecom Service Provider

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply & Delivery of Fuel

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Heavy Lift and Rigging

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Temporary Facilities

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply & Delivery of Construction Water

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Insulation

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Offsite Warehousing and Transport

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

International Freight

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Overland Transport & Logistics

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

NDT & PWHT

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Site Security

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Occupational Hygiene Monitoring Services

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Construction Communication Systems

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Scaffolding

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Sandblasting and painting

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Temporary power connection

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Plant & Equipment (P&E) - Direct

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Heavy Transportation (SPMT)

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Third Party Inspection

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Plant & Equipment Monitoring & Maintenance

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Customs Brokerage

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Plant & Equipment (P&E) - Indirect

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Waste Management

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Temporary Facilities Service and Maintenance

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Vacuum and Water Tanker services

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Traffic Management

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
Loading...