Valmec Kent Joint Venture (VKJV) have been engaged formally by Origin Energy Future Fuels (Origin) to execute a Front End Engineering and Design (FEED) for the initial phase of the Project.
Following delivery of FEED, the strategy is for VKJV to take the Project through full EPC execution, subject to appropriate approvals being achieved.
As part of the early FEED phase, VKJV is looking to get some high-level budget pricing on key selected packages to understand the Order of Magnitude cost. A formal inqury for these packages will be followed in due course once the engineering is progressed to sufficient detail.
Project Background
The Project objective is to develop an integrated group of production and distribution assets required to establish a hydrogen hub. Hydrogen will be produced from recycled water and renewable electricity using a grid-connected 60MW (nominal) electrolyser.
Hydrogen gas will then be directed to multiple end uses, including:
Local Industry manufacturing Hydrogen will be supplied via pipeline to Orica's Kooragang Island ammonia manufacturing facility.
Heavy vehicles and public transport Hydrogen will be compressed and distributed by road to public and transport industry refueling depots for use in trucking and passenger bus operations in the Hunter, Central Coast, and Greater Sydney regions. The project will include two satellite hydrogen refueling stations supplied with hydrogen by tube trailers filled at the production facility. A hydrogen refueling station will also be included at the production facility.
More information about this project you may find here.
How to register an Expression of Interest (EOI)
- Work packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to the 'EOI User Guide' below for instructions and assistance to submit an EOI.
- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
- Please dowload "EOI Capabilities & Experience Questionnaire" from Project Documents section below, and provide all answers. When you will register your EOI, the system will prompt you to upload your completed document. Providing all answers is mandatory and decision on further steps will be based on information you provided in your Gateway profile and the answers in this questionnaire.
ICN Gateway Company Registration
- Click here to register your company profile on ICN Gateway.
- Support and assistance are available through the document 'Creating an ICN Gateway Company Profile' below.
- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.