Overview

The Contractor

ATB Riva Calzoni , is a leading player with global experience in design manufacture and commissioning of equipment for the energy sector. The company is looking to identify Australian business's to assist with the delivery of the scope of works described below.


The Project

SNOWY 2.0 Pumped Storage Project is the largest committed renewable energy project in Australia. The project involves linking two existing dams, Tantangara and Talbingo, through 27km of tunnels and building a new underground power station.
Water will be pumped to the upper dam when there is surplus renewable energy production and the demand for energy is low, and then released back to the lower dam to generate energy when electricity demand is high.


The scope of works

ATB Riva Calzoni as Subcontractor of FGJV for SNOWY 2.0 Pumped Storage Project , will be in charge of the supply, fabrication, installation and commissioning of all steel liners as per here below main description:
Penstock ID3800
Draft tube steel lining ID4700
Draft tube bifurcation
Collectors Steel lining ID 6600
Orifices (downstreem and upstream);
To comply with this scope of Work additional services will be needed such as:
Sandblasting and painting
PWHT
NDT Controls:
Transport services from the Port to site of the Items of the Scope of Supply
Transport services from laydown area in the site to the work front.
Temporary warehouse:supply and installation
Temporary Utilities internal network and connextion to the main grid: Supply and installation
Site erection equipment supply and/or renting:


ICN Gateway company profile

Your ICN Gateway company profile and any registrations of interest you submit are used to assess your organisation's ability to complete projects.

Click here to create a new company profile or to login to your existing company profile.

Please ensure your business invests the time and energy required to represent itself in the most effective manner possible when completing and/or updating your company profile.

ATB Riva Calzoni strongly encourages suppliers to contact ICN in the first instance to gain an understanding of the ROI process and development programs, such as their ICN Gateway Profile Improvement Workshops.

5
Total Work Packages
5
Other Work Packages
5
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
General Requirements
Status
Closed
Full scope EOI closes on
31 Jul 2024

Bifurcation Fabrication - See Attached scoping document

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Jul 2024

Draft Tube and Collector Steel Linings

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Jul 2024

Penstock Fabrication - See Scoping document

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
19 Jul 2024

The building will be installed in Snowy 2.0 Hydro Project, NSW - Australia,
around 1.5 hours by car from Cooma.
The warehouse is mainly composed by:
- No.1 modular framed temporary building
- No.1 modular unit to be used as storekeeper office with toilets

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Jul 2024

Welding Subcontractors - Labour Hire

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.