SRL OPS PTY LTD
SUNRISE BATTERY MATERIALS COMPLEX
location_onNSW Australia
Overview

About the Project Owner


SRL Ops Pty Ltd is a wholly owned subsidiary of Sunrise Energy Metals (SEM)


The Project - Sunrise Battery Materials Complex

As one of the largest nickel-cobalt-scandium deposits in the world, with all key permits and approvals in place, the Sunrise Project is uniquely placed to become a strategic supplier of battery raw materials and aluminum-scandium alloys.

Sunrise Energy Metals (SEM) aspires to be a world leader in the supply of metals that lower the environmental burden, both in the way they are produced and the way they are consumed. SEM is developing its world-class Sunrise Nickel Cobalt Scandium Project, utilising its Clean-iXR technology. The Sunrise deposit is one of the largest and highest-grade undeveloped nickel and cobalt resources outside Africa and contains the world's largest and highest-grade scandium resource.

The Sunrise deposit is situated in central west New South Wales, approximately 350 km WNW of Sydney. The project site is shown below.

Sourcing 100% renewable power, the Sunrise Project is designed and engineered to optimize the production process for high purity battery materials by lowering cost, improving product quality and minimizing carbon emissions.

SEM completed an updated feasibility study referred to as the Project Execution Plan in September 2020 which outlined an overall cost of $2.389B AUD and a 3 year construction period to deliver the project. The Sunrise project is managed by SRL Ops Pty Ltd, a wholly owned subsidiary of Sunrise Energy Metals Ltd.


General Information on Project

More information about the project can be found via the Sunrise Energy Metals Website. Limited procurement and tendering opportunities will be available until the project achieves a Final Investment Decision (FID) with the exception of some early works packages. Interested parties are encouraged to sign up for "Sunrise Energy Metals News" via the Sunrise Energy Metals Website to receive project updates as the Sunrise project progresses and opportunities become available.


ICN Gateway company profile

Your ICN Gateway company profile and any registrations of interest you submit are used to assess your organisation's ability to complete projects.

Click here to create a new company profile or to login to your existing company profile.

Please ensure your business invests the time and energy required to represent itself in the most effective manner possible when completing and/or updating your company profile.

1
Total Work Package
1
Other Work Package

SRL OPS PTY LTD

location_on

NSW Australia

Project Primary Contact
person_outline
Geoff Reardon
badge
Regional Manager - Murray/Riverina NSW
phone
+61 402 632 027
1
Total Work Package
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Project requirements
Status
Closed
Full scope EOI closes on
13 Mar 2023

Construction of 4 Production Water Bores & 5 Monitoring Bores along the Lachlan River at Warroo (45km West of Forbes).