Riverina Redevelopment Joint Venture - comprising of CPB Contractors and Downer
DEFENCE ESTATES - RIVERINA REDEVELOPMENT PROGRAM
location_onNSW, VIC Australia
Overview

About the Project Owner

Riverina Redevelopment Joint Venture (RRJV) - comprising of CPB Contractors and Downer.

CPB Contractors (www.cpbcon.com.au) is a subsidiary of CIMIC Group Limited. Downer (www.downergroup.com) is listed on the Australian Securities Exchange.


The Project

The Riverina Redevelopment Project is a program of works across three Department of Defence establishments including:

  • Albury Wodonga Military Area (including North, South & East Bandiana, Latchford Barracks, Wirlinga)
  • Blamey Barracks (Kapooka)
  • RAAF Base Wagga

The scope comprises major upgrade or replacement of existing infrastructure and facilities to support Defence capability for the next 30 years.

The Project is valued at in excess of $1b and will incorporate a variety of elements including:

  • Construction of new messing and living in accommodation
  • Construction of new training facilities
  • Refurbishment and upgrading of existing buildings
  • Construction of new car parks
  • Remedial works and upgrades to infrastructure services

The proposed capital investment is $1.1 billion and is yet to be considered or approved by the Government or Parliament. The RRJV has been appointed to plan, and subject to approvals, deliver the Program works to gain efficiencies in planning, standardisation of design, cost and time efficiencies in Program approvals and construction packaging/delivery. There is also an intent to maximise local and Indigenous industry participation.

The Program is currently in Planning Phase where the design will be developed to 90% and site investigations will be undertaken.

The RRJV is seeking registrations from interested suppliers, consultants and contractors looking to be involved in this program of works.


The indicative program milestones are:

  • Apr 22 - Contract Award for Planning Phase
  • Aug 24 - Delivery Phase Approval - inclusive of all Defence, Government and parliamentary approvals
  • Dec 31 - Completion of the last Stage of Works
  • Nov 32 - End of last Defence Liability Period

General Information on Project

For the avoidance of doubt, this is not the first stage of a multi-stage procurement. In other words, potential tenderers that choose not to participate in this market sounding process will not be prevented from or disadvantaged in participating in the subsequent request for tender (RFT) process, if any. There is no contract being created by this process and RRJV is under no obligation to take into account any information presented or submitted by a registrant. RRJV does not intend, and registrants should not interpret, this market sounding process as indicating anything in relation to the final development and delivery strategy for the Program.


How to Register an Expression of Interest for Listed Packages

Work Packages currently available to submit an EOI for are listed on the 'Work Packages' tab above

To submit an initial EOI for the Work Scopes, companies must have an ICN Gateway capability profile.

Information on how to create your capability profile on ICN Gateway is detailed below.

This is an initial, generic EOI submission only.


ICN Gateway Capability Profile Creation

Click on "Join Now", at the top of this screen, to complete your capability profile on ICN Gateway.

Support and assistance is available through the web links listed below.

Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

42
Total Work Packages
14
Open Work Packages
28
Other Work Packages

Riverina Redevelopment Joint Venture - comprising of CPB Contractors and Downer

location_on

NSW, VIC Australia

Project Primary Contact
person_outline
Geoff Reardon
badge
Regional Manager - Murray/Riverina NSW
phone
+61 402 632 027
42
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Open Tender Packages
Status
Open
Full scope EOI closes on
04 Jul 2025

Design coordination, and Construction of the New Education and Video Conference Facility

Management of the entire building construction from acceptance of site to commissioning, handover and through the defect liability period.

Including the engagement and management of subsubcontractors, suppliers across all trades and disciplines.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Clear, grub and topsoil strip

Bulk and detailed earthworks incl. cut & fill

Management stockpiling and geotechnical testing activities

Traffic and pedestrian management

Construction of roads, kerbs, stormwater pits, carparks, footpaths, flexible and rigid pavements.

Civil finishes including topsoil, seed, simple landscaping works, line marking, and roadway signage.

Civil infrastructure including underground stormwater drainage, swale construction, subsoil drainage, pit, conduit and headwall installation.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Clear, grub and topsoil strip

Bulk and detailed earthworks incl. cut & fill

Management stockpiling and geotechnical testing activities

Traffic and pedestrian management

Construction of roads, kerbs, stormwater pits, carparks, footpaths, flexible and rigid pavements.

Civil finishes including topsoil, seed, simple landscaping works, line marking, and roadway signage.

Civil infrastructure including underground stormwater drainage, swale construction, subsoil drainage, pit, conduit and headwall installation.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Electrical & Security package for 9 x 48 bed Living-in Accommodation (LIA) buildings and 1 x New Recruit Living -In Accommodation Building

Design coordination, construct commission, and certify building electrical and security services

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Facade package for 9 x 48 bed Living-in Accommodation (LIA) buildings and 1 x New Recruit Living -In Accommodation Building

Supply and installation of complete facade system including:
Lightweight framing
Insulation
Weatherproof, waterproof and vapour permeable lining installation
Fibre cement, aluminium and metal linings
Windows, doors, louvres and associated hardware
Flashings and trims
Water testing and certification

(Option) design and construct of 'panelised' facade system

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Decommission and demolish existing hydraulic infrastructure

Design coordination, supply and installation of new water infrastructure inclusive of:
Trenching and backfill
Pipes, pits, valves, valve boxes, meters, meter assemblies, booster assemblies, hydrants, pits, manholes, inspection points, and the like
Upgrades, modification and integration into existing infrastructure
Storage tanks, filters, pumps and the like

Design, drafting, coordination, integration, testing & commissioning

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Hydraulic services package for 9 x 48 bed Living-in Accommodation (LIA) buildings and 1 x New Recruit Living -In Accommodation Building

Design coordination, construct commission, and certify building hydraulic services.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Decommission and demolish existing LV & ICT infrastructure

Design coordination, supply and installation of new LV & ICT infrastructure inclusive of:

Trenching and backfill
Conduits and pits
Cabling, jointing and integration into existing infrastructure
Street and path lighting with foundation, luminaires and cabling.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Mechanical package for 9 x 48 bed Living-in Accommodation (LIA) buildings and 1 x New Recruit Living - In Accommodation Building

Design coordination, construct commission, and certify building mechanical services

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Precast package for 9 x 48 bed Living-in Accommodation (LIA) buildings and 1 x New Recruit Living -In Accommodation Building

Supply and installation of precast panels
Inclusive of manufacture, transport, lifting, installation, temporary bracing design and install, permanent connections (dowels, plates, grouting, welding, etc.).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

FRP package for 9 x 48 bed Living-in Accommodation (LIA) buildings and 1 x New Recruit Living -In Accommodation Building

Manage and construct structural concrete package inclusive of:
Detailed excavation for footings
Installation of sand / concrete blinding's and vapour barrier
Formwork systems design, supply and install
Reinforcement schedule, supply and install
Concrete supply and place

For concrete structural elements including footings, slabs on ground, suspended slabs, columns, walls, etc.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Ceiling and Partition package for 9 x 48 bed Living-in Accommodation (LIA) buildings and 1 x New Recruit Living -In Accommodation Building

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Workstation, Desk & Furniture package for 9 x 48 bed Living-in Accommodation (LIA) buildings and 1 x New Recruit Living -In Accommodation Building

Supply, manufacture and installation

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Miscellaneous
Status
Open
Full scope EOI closes on
31 Dec 2025

To assist RRJV in identifying capability not listed in specific work packages.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Consultants Services
Status
Closed
Full scope EOI closes on
18 Jun 2025

Audio visual supply and install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
15 Jul 2022

Structural, Hydraulics, Electrical, ICT, Mechanical, Fire, Security

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Hardware, cable installation, network construction, telephony

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Trade Packages
Status
Closed
Full scope EOI closes on
18 Jun 2025

Window furnishings

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Electrical, plumbing, fire, communications, mechanical

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

- masonry
- facade & glazing
- ceilings & partitions
- tiling & waterproofing
- metal roofing & cladding
- doors & hardware
- flooring
- joinery
- metal work
- commercial kitchen fit-out
- painting
- FF&E

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Design, supply and installation of communication and data systems

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Concrete Supply and Place

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Demolition

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Earthworks

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Facade/Windows

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Fire Services

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Design and install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Systems, design and installation

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Systems, design and installation

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Potable Water, Fire Mains, Irrigation, Sewer, Trade Waste

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Hard (paving, concrete works & retaining)
Soft (vegetation)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

HVAC, heating and cooling air-conditioning design and install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Metalwork

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Piling, Design and Construct.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Reinforcement Supply/Fixing

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Roller Doors

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Scaffolding

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Security Fencing

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Signage

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Stormwater Drainage

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

In-situ & precast
Formwork
Steel fixing

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2025

Structural Steel

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.