an unincorporated joint venture between Glencore Bauxite Resources Pty Ltd & MDP Bauxite Pty Ltd
AURUKUN BAUXITE PROJECT
location_onQLD Australia
Overview

The Aurukun Bauxite Project is a greenfield bauxite operation in the Aurukun region of Western Cape York, Far North Queensland. The bauxite will be mined using conventional truck and loader operation, and ore will be processed in an on-site beneficiation plant.


Product ore will then be transported to a Coastal Loading Facility (CLF) from which it will then be transported by transhipment vessel to an offshore transhipment area and transferred to bulk carriers for export.


The project is anticipated to produce approximately 8 million dry product tonnes of bauxite per year over a life of mine of more than 20 years.


Proposed project components include:

  • Truck dump station and run of mine storage
  • Ore beneficiation facility
  • Coastal Loading Facility (Land and Marine)
  • Transhipment vessel
  • Water supply dam and infrastructure
  • Fines (tailings) storage facility
  • Power generation
  • Initial haul roads network
  • Communications / Control system
  • Mine infrastructure buildings, including operations and temporary workshops and general infrastructure including a telecommunications system
  • Temporary works required to support construction, including a construction camp, accommodation village, power, water and telecommunications; and
  • Information systems and technology equipment, heavy mine equipment, Product Haulage equipment and mine operations equipment


DELIVERY SCHEDULE


The Aurukun Bauxite Project Joint Venture is currently undertaking a program of technical, approvals and community work that will inform a final investment decision by the Joint Venture.

Future procurement decisions are dependent on approval of the Joint Venture.

Construction of associated mine infrastructure is anticipated to take 2-3 years from investment decision.


58
Total Work Packages
26
Open Work Packages
32
Other Work Packages

an unincorporated joint venture between Glencore Bauxite Resources Pty Ltd & MDP Bauxite Pty Ltd

location_on

QLD Australia

Project Primary Contact
person_outline
Nimmi Pushparajan
phone
+61 7 3364 0670
58
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Construction Packages
Status
Open
Full scope EOI closes on
04 Jul 2025

Design and Construct of the concrete batch plant and the delivery transportation

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Supply of resource and geotechnical drilling services

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Design, Supply and commission of fuel storage tanks and dispensing units

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Drilling of one (1) Great Artesian Bore for construction water

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Purchase / Hire or Lease to Buy (and including maintenance services) for HME Fleet for Mining Operations

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Design and supply of MIA and CLF modular buildings

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Project Management Services during project execution (Construction phase)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Supply and installation of LV & HV electrical equipment (including free issued items)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Design and supply of OT network hardware and control system

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Supply of HV switchgear

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Supply of motor control centres and PLC cubicles

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Supply of Stackers

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Design and manufacture of transportable switchrooms (excluding Power Station SWRM)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Survey services to support construction and civil works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022
Partial scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022
Partial scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022
Partial scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022
Partial scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
30 Jun 2025

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Miscellaneous
Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
30 Apr 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Operations Packages
Status
Open
Full scope EOI closes on
04 Jul 2025

Accelerated Mechanical Consolidation (AMC) Services

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Supply of Labour Hire

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Supply and operation of powered road trains and loading equipment (Hire)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Operation and Maintenance of the Transhipment Vessel

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022
Partial scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2022

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Aurukun Bauxite project. All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Construction & Operations Packages
Status
Open
Full scope EOI closes on
04 Jul 2025

Onsite provision of equipment and staffing for laboratory services on site.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Supply of Light Vehicle Fleet

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Supply of maintenance services for operation LV fleet

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Supply of services for annual clearing of mining blocks

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Service for all Tyre fitting (HME, LVs..)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Supply of tyres for all Light Vehicles (LVs), Heavy Mobile Equipment (HME), and ancillary plant

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Landfill Management Services Onsite and Aurukun Waste Management Services (Construction & Operations)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Jul 2025

Supply of Air transportation for construction and operations

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.