SA Australia
OZ Minerals Prominent Hill Operations Pty Ltd
The Prominent Hill Expansion Project (PHOX Project) is an upgrade to the existing Prominent Hill copper-gold mine deposit located approximately 130 km southeast of Coober Pedy and 150 km northwest of Roxby Downs. The PHOX Project is establishing a 1,300m deep shaft for ore transport to the surface in lieu of the existing truck haulage. The project includes underground truck loading chutes, underground primary crushing station, skip loading station, production hoisting system and surface materials handling infrastructure.
OZ Minerals is seeking expressions of interest (EOI) for the selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for one (1) off Clamping and Lifting Device (CLD) to be installed at the OZ Minerals Prominent Hill mine.
The Clamping and Lifting Device (CLD) shall be supplied complete, including all necessary supply for complete and proper operation of the equipment.
The Scope of Supply includes, but is not necessarily limited to, the following:
Design, manufacture and supply of One (1) Clamping and Lifting Device (CLD). The CLD will be used to introduce slack into the head ropes of a ground mounted Koepe Friction hoist during head rope change out. The CLD will be installed on the lower sheave deck of the Head Frame.
To submit an EOI, please:
1) Log into the ICN Gateway, click 'Create EOI' and respond to the questions
3) once completed, click SUBMIT.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
This Scope of Supply sets out the requirements for the design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, and acceptance testing for sixteen (16) off complete grizzly panel assemblies comprising of two (2) grizzly panels in each assembly to be installed underground at the OZ Minerals Prominent Hill mine.
The Scope of Supply includes, but is not necessarily limited to, the following:
1. Thirty-two (32) grizzly panels:
Grizzly Panels - 16 off assemblies (32 off panels)
2. Undertaking all necessary design works to ensure the adequacy of the cast panels, including but not limited to engineering and finite element analysis (FEA). The supplier submission should include any recommended changes in the geometry and heat treatment if required.
3. Completion of final arrangement drawings for cast grizzly panels and submission for review and approval prior to manufacture.
4. Quality control of Cast Grizzly panels. The surface of the castings shall be free of adhering sand, scale, cracks and hot tears as determined by visual and dye penetrant inspection.
To submit an EOI, please:
1. click 'Create EOI' and respond to the questions
2. once completed, click SUBMIT.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The OZ Minerals PHOX Project is seeking expressions of interest for the hire of a 900-1200t crane for the headframe erection at the Prominent Hill Mine site. The crane must be available mid-2022.
To submit an EOI, please:
1. click 'Create EOI' and respond to the questions
2. once completed, click SUBMIT.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
OZ Minerals is seeking expressions of interest (EOI) for the design, supply, delivery and commissioning for the High Voltage Variable Speed Drives for Prominent Hill Mine Site.
To submit an EOI, please:
1) review the Scope Document
2) click 'Create EOI' and respond to the questions
3) once completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
OZ Minerals is seeking expressions of interest (EOI) for the supply, manufacture, delivery, commissioning and acceptance testing for one (1) off complete Primary Crusher Assembly to be installed underground at the OZ Minerals Prominent Hill mine.
Scope of Supply includes:
1. One (1) Primary Gyratory Crusher Assembly
2. The Primary Crusher Assembly shall include:
i. Primary crusher body assembly, including top and bottom shells, main shaft, main shaft bushings and bearings, spider and all wear liners.
ii. Primary crusher drive assembly, including (where applicable) wound rotor induction motor.
iii. Low Voltage motor electrolyte liquid resistance starter (LRS) suitable sized for motor starting duty.
iv. Hydraulic power packs, automatic lubrication systems and automatic main shaft adjustment system. Suitable electrical, control, instrumentation and monitoring field devices and local wiring.
v. Supplier's control and protection system including PLC and IO, local control unit, display, contactors, Ethernet module for interface with site SCADA supplied by others.
To submit your EOI please:
1) Click 'Create EOI' and complete the questions
2) When completed, click SUMBIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
SCOPE OF SUPPLY
Selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for two (2) identical horizontally mounted primary axial fans (Nominal Duty of 350m3/s @ 3.5 kPa) to be installed underground at the OZ Minerals Prominent Hill - Malu mine area
The fans shall be supplied complete, including all necessary supply for complete and proper operation of the equipment.
To register interest in this work package please:
1) Click 'Create EOI' and complete the Prequalification Questionnaire
2) When completed, click SUBMIT.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Oz Minerals - Prominent Hill is inviting Expressions of Interest (EOIs) for a Production Winder.
Prior to submitting an EOI, please review the Scope Document titled 'Prominent Hill - PHOX Project - Production Winder Package Description'.
To submit an EOI, please click 'Create EOI' and respond to the questions.
Once questions are completed and relevant attachments uploaded, please click Submit.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
SCOPE OF SUPPLY
Selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for the ammonia type refrigeration chiller assembly packages serving the underground cooling requirements at the OZ Minerals Prominent Hill mine.
To register interest in this work package please:
1) Click 'Create EOI' and complete the Prequalification Questionnaire
2) When completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
OZ Minerals is seeking expressions of interest (EOI) for the selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for one (1) off complete Rock Breaker Assembly to be installed underground at the OZ Minerals Prominent Hill mine.
To submit an EOI, please:
1) review the Scope Document
2) click 'Create EOI' and respond to the questions
3) once completed, click SUBMIT.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
OZ Minerals is seeking expressions of interest (EOI) for surface enabling works at the OZ Minerals Prominent Hill mine.
The Contractor shall supply all management, labour, supervision, equipment, services and materials, other than free issue materials, and include all necessary expenses for all construction, installation, temporary works, construction verification, commissioning and acceptance testing (where required) of the works described in the Scope Document.
To submit an EOI, please:
1) review the Scope Document
2) click 'Create EOI' and respond to the questions
3) once completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
OZ Minerals is seeking expressions of interest (EOI) for the selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for four (4) off complete Truck Loading Chute Assemblies to be installed underground at the OZ Minerals Prominent Hill mine.
To submit an EOI, please:
1) review the Scope Document
2) click 'Create EOI' and respond to the questions
3) once completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
This Scope of Supply sets out the requirements for the selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for the Conveyor Hydraulic package to be installed underground at the OZ Minerals Prominent Hill mine.
To submit an EOI, please:
1) review the Scope Document
2) click 'Create EOI' and respond to the questions
3) once completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
This Scope of Supply sets out the requirements for the selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for Winder Rope Attachments to be installed at the OZ Minerals Prominent Hill mine.
The Scope of Supply includes, but is not necessarily limited to, the following:
1. Head, Tail and Guide Rope Attachments:
Head Rope Fixed Attachment - 4 off
Head Rope Adjustable Attachment - 4 off
Head Rope Manoeuvring Gland - 4 off
Tail Rope Attachments - 8 off
Top Guide Rope Anchors - 8 off
Bottom Guide Rope Anchors - 8 off
Guide Rope Manoeuvring Gland - 4 off
i. Tail rope socketing resin.
ii. Permanent and temporary surface treatment.
To submit an EOI, please:
1. click 'Create EOI' and respond to the questions
2. once completed, click SUBMIT.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
This Scope of Supply sets out the requirements for the selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for Winder Ropes to be installed at the OZ Minerals Prominent Hill mine.
The Scope of Supply includes, but is not necessarily limited to, the following:
1. Head, Tail and Guide Ropes:
Winder Head Ropes - 4 of
Winder Tail Ropes - 4 of
Winder Guide Ropes - 8 of
i. Rope reels suitable for use with pneumatic rope reeling equipment.
ii. Permanent and temporary surface treatment.
iii. All manufacturer's certificates, NDT results and destructive testing results
To submit an EOI, please:
1) click 'Create EOI' and respond to the questions
2) once completed, click SUBMIT.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
BHP is seeking an engineering services provider (ESP) to design the tailings disposal system upgrade for the Prominent Hill mine site operations expansion project (Services).
The tailings disposal system is responsible for delivering tailings from the tails thickener via interconnecting pipework and discharge spigots to the TSF. The existing tailings disposal system has been designed to accommodate the tailings produced when the process plant is operating at its nameplate capacity of 10Mtpa. The future tailings disposal system will be required to operate at both the existing processing plant capacity and at a reduced rate.
Previous studies have reported a risk of solids settling in the tailings pipeline at low flow conditions, and possible pump performance issues. The purpose of the Services is to re-confirm these impacts and complete the detailed design for any upgrades required to the tailings disposal system to accommodate the revised tailings throughputs. Maintaining reliable performance of the tailings disposal system for the remaining life of mine is a key priority for the project to ensure continued operation of the process plant. To achieve this, the tailings disposal system must accommodate variability in throughput volumes and material composition reporting to the Tailings Storage Facility.
The Services will be delivered in two phases:
Phase 1 - Scoping
The ESP will familiarise themselves with the project requirements, develop a preferred solution, and summarise the alternative options. These shall be presented to BHP for evaluation and confirmation the solution meets project objectives and operational requirements.
Phase 2 - Detailed Design
Based on the outcome and endorsement of Phase 1, the ESP will execute the detailed design portion of the Services, including the full range of engineering deliverables for civil, SMP and EIC works.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
A Rope-up and Rope-handling system is required for the Prominent Hill mine shaft as part of the PHOX project. This work package is for the fabrication and supply of the following Rope-up and Rope-handling equipment:
1. 3T Reeler Assembly
2. 3T Reeler Hydraulic Power Unit Assembly
3. 30T Winch Assembly
4. 30T Winch Hydraulic Power Unit Assembly
5. 5T Winch Assembly
6. 5T Winch Hydraulic Power Unit Assembly
7. Factory Acceptance Testing / Commissioning
Note that installation will be subject to a separate works package.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
OZ Minerals is seeking expressions of interest (EOI) for the selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for Packaged Diesel Fuel and Lubrication Systems to be installed underground at the OZ Minerals Prominent Hill mine.
To submit an EOI, please:
1) review the Scope Document
2) click 'Create EOI' and respond to the questions
3) once completed, click SUBMIT.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
OZ Minerals is seeking expressions of interest (EOI) for the selection, design, supply, manufacture, delivery, commissioning and acceptance testing for the Surface Switchrooms, Switchgear and Distribution Boards to be installed at the OZ Minerals Prominent Hill mine.
To submit an EOI, please:
1) review the Scope Document
2) click 'Create EOI' and respond to the questions
3) once completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
OZ Minerals is seeking expressions of interest (EOI) for the Civil, Structural, Mechanical and Piping (SMP) and Electrical, Control & Instrumentation (ECI) installation for the surface infrastructure for the OZ Minerals Prominent Hill PHOX shaft sink project.
The successful contractor will be required to supply all management, labour, supervision, equipment, services and minor materials, other than free issue materials for all surface construction, installation, temporary works, commissioning and acceptance testing of the project's surface plant and equipment.
This package of work will require a significant level of prior experience in mine site installation and commissioning works.
To submit an EOI, please:
1) review the Scope Document
2) click 'Create EOI' and respond to the questions
3) once completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
OZ Minerals is seeking expressions of interest (EOI) for the Civil, Structural, Mechanical and Piping (SMP) and Electrical, Control & Instrumentation (ECI) installation for the underground infrastructure for the OZ Minerals Prominent Hill PHOX shaft sink project.
The successful contractor will be required to supply all management, labour, supervision, equipment, services and minor materials, other than free issue materials for all underground construction, installation, temporary works, commissioning and acceptance testing of the project's underground plant and equipment.
This package of work will require a significant level of prior experience in underground mining installation and commissioning works.
To submit an EOI, please:
1) review the Scope Document
2) click 'Create EOI' and respond to the questions
3) once completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
If you would like to keep updated on the PHOX Project, please click 'Create EOI' and then click SUBMIT.
NB: by responding to this work package, you are not registering interest for any specific work package and your company information will not be provided to the OZ Minerals - Prominent Hill Team. ICN SA may use you company's contact details to inform you about industry briefings, new work packages, etc.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.