OZ Minerals Prominent Hill Operations Pty Ltd

Prominent Hill Expansion Project (PHOX)

Overview


BHP's Prominent Hill Expansion Project (PHOX Project) is an upgrade to the existing Prominent Hill copper-gold mine deposit located approximately 130 km southeast of Coober Pedy and 150 km northwest of Roxby Downs. The PHOX Project is establishing a 1,300m deep shaft for ore transport to the surface in lieu of the existing truck haulage. The project includes underground truck loading chutes, underground primary crushing station, skip loading station, production hoisting system and surface materials handling infrastructure.



Prominent Hill Expansion Project (PHOX)

OZ Minerals Prominent Hill Operations Pty Ltd

location_on

SA Australia


Project Primary Contact
person_outline
Eddie Ivar
badge
ICN South Australia
mail Send Email
Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login

BHP Prominent Hill is transitioning from a 10Mtpa processing plant to a 7.5Mtpa processing plant. This decrease in processed material, in addition to increased backfill demand has resulted in the current final tailings pumps (PPC-284, PPC-285, PPC291) operating outside their pump curve. An engineering review has been completed of the likely operating conditions of the final tailings pumps and has found the existing pumps need to be downsized to operate efficiently and reliability. Accordingly, BHP requires a surface to underground lined borehole and dropper that will be utilised as a second pastefill reticulation system from the Ankata paste plant to the underground mine workings. The requirements of this scope are supply of a lined borehole assembly suitable for pastefill delivery, in addition to services for supervision of the installation, handling and QA/QC. A suitable drilled and oversized steel lined borehole will be provided for installation of the Ankata paste dropper. The drilling of the initial cased hole is excluded from this scope of works. The scope requires provision of labour and equipment for the handling and installation of the Ankata Paste Dropper along with quality assurance and quality control services. Planned installation methodology is with use of a slew crane, pick and carry mobile crane and a hydraulic breakout/torque unit. Crane hire and rigger labour is excluded from this scope.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

OZ Minerals is seeking expressions of interest (EOI) for the design, supply, delivery and commissioning for the High Voltage Variable Speed Drives for Prominent Hill Mine Site. To submit an EOI, please: 1) review the Scope Document 2) click 'Create EOI' and respond to the questions 3) once completed, click SUBMIT

Status
Awarded
EOI Open Date
12 Oct 2021
EOI Close Date
26 Oct 2021
This work package has been awarded to the companies below

INNOMOTICS PTY LTD

This Scope of Supply sets out the requirements for the selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for Winder Ropes to be installed at the OZ Minerals Prominent Hill mine. The Scope of Supply includes, but is not necessarily limited to, the following: 1. Head, Tail and Guide Ropes: Winder Head Ropes - 4 of Winder Tail Ropes - 4 of Winder Guide Ropes - 8 of i. Rope reels suitable for use with pneumatic rope reeling equipment. ii. Permanent and temporary surface treatment. iii. All manufacturer's certificates, NDT results and destructive testing results To submit an EOI, please: 1) click 'Create EOI' and respond to the questions 2) once completed, click SUBMIT.

Status
Awarded
EOI Open Date
29 Oct 2021
EOI Close Date
15 Nov 2021
This work package has been awarded to the companies below

WIRECO PTY. LTD.

location_on
7 Demand Ave Arundel QLD 4214 AU

SCOPE OF SUPPLY Selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for the ammonia type refrigeration chiller assembly packages serving the underground cooling requirements at the OZ Minerals Prominent Hill mine. To register interest in this work package please: 1) Click 'Create EOI' and complete the Prequalification Questionnaire 2) When completed, click SUBMIT

Status
Awarded
EOI Open Date
09 Sep 2021
EOI Close Date
23 Sep 2021
This work package has been awarded to the companies below

HOWDEN AUSTRALIA PTY LTD

location_on
58 Norwest Boulevard Baulkham Hills NSW 2153 AU

OZ Minerals is seeking expressions of interest (EOI) for surface enabling works at the OZ Minerals Prominent Hill mine. The Contractor shall supply all management, labour, supervision, equipment, services and materials, other than free issue materials, and include all necessary expenses for all construction, installation, temporary works, construction verification, commissioning and acceptance testing (where required) of the works described in the Scope Document. To submit an EOI, please: 1) review the Scope Document 2) click 'Create EOI' and respond to the questions 3) once completed, click SUBMIT

Status
Awarded
EOI Open Date
03 Nov 2021
EOI Close Date
22 Nov 2021
This work package has been awarded to the companies below

RJE GLOBAL PTY LTD

location_on
115 Morphett Road Morphettville SA 5043 AU

The OZ Minerals PHOX Project is seeking expressions of interest for the hire of a 900-1200t crane for the headframe erection at the Prominent Hill Mine site. The crane must be available mid-2022. To submit an EOI, please: 1. click 'Create EOI' and respond to the questions 2. once completed, click SUBMIT.

Status
Awarded
EOI Open Date
04 Nov 2021
EOI Close Date
19 Nov 2021
This work package has been awarded to the companies below

LAMPSON AUSTRALIA PTY LTD

SCOPE OF SUPPLY Selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for two (2) identical horizontally mounted primary axial fans (Nominal Duty of 350m3/s @ 3.5 kPa) to be installed underground at the OZ Minerals Prominent Hill - Malu mine area The fans shall be supplied complete, including all necessary supply for complete and proper operation of the equipment. To register interest in this work package please: 1) Click 'Create EOI' and complete the Prequalification Questionnaire 2) When completed, click SUBMIT.

Status
Awarded
EOI Open Date
09 Sep 2021
EOI Close Date
23 Sep 2021
This work package has been awarded to the companies below

Zitron Australia Pty Ltd

location_on
3 Redemptora Rd HENDERSON WA 6166 AU

Oz Minerals - Prominent Hill is inviting Expressions of Interest (EOIs) for a Production Winder. Prior to submitting an EOI, please review the Scope Document titled 'Prominent Hill - PHOX Project - Production Winder Package Description'. To submit an EOI, please click 'Create EOI' and respond to the questions. Once questions are completed and relevant attachments uploaded, please click Submit.

Status
Awarded
EOI Open Date
01 Sep 2021
EOI Close Date
15 Sep 2021
This work package has been awarded to the companies below

OZ Minerals is seeking expressions of interest (EOI) for the supply, manufacture, delivery, commissioning and acceptance testing for one (1) off complete Primary Crusher Assembly to be installed underground at the OZ Minerals Prominent Hill mine. Scope of Supply includes: 1. One (1) Primary Gyratory Crusher Assembly 2. The Primary Crusher Assembly shall include: i. Primary crusher body assembly, including top and bottom shells, main shaft, main shaft bushings and bearings, spider and all wear liners. ii. Primary crusher drive assembly, including (where applicable) wound rotor induction motor. iii. Low Voltage motor electrolyte liquid resistance starter (LRS) suitable sized for motor starting duty. iv. Hydraulic power packs, automatic lubrication systems and automatic main shaft adjustment system. Suitable electrical, control, instrumentation and monitoring field devices and local wiring. v. Supplier's control and protection system including PLC and IO, local control unit, display, contactors, Ethernet module for interface with site SCADA supplied by others. To submit your EOI please: 1) Click 'Create EOI' and complete the questions 2) When completed, click SUMBIT

Status
Awarded
EOI Open Date
01 Oct 2021
EOI Close Date
14 Oct 2021
This work package has been awarded to the companies below

THYSSENKRUPP INDUSTRIAL SOLUTIONS (AUSTRALIA) PTY LTD

location_on
Level 11, 140 St Georges Terrace PERTH WA 6000 AU

OZ Minerals is seeking expressions of interest (EOI) for the selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for four (4) off complete Truck Loading Chute Assemblies to be installed underground at the OZ Minerals Prominent Hill mine. To submit an EOI, please: 1) review the Scope Document 2) click 'Create EOI' and respond to the questions 3) once completed, click SUBMIT

Status
Awarded
EOI Open Date
02 Nov 2021
EOI Close Date
03 Dec 2021
This work package has been awarded to the companies below

Nordic Minesteel Technologies Inc.

location_on
18 Legault Street Ontario P1B 8Z4 CA

This Scope of Supply sets out the requirements for the selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for the Conveyor Hydraulic package to be installed underground at the OZ Minerals Prominent Hill mine. To submit an EOI, please: 1) review the Scope Document 2) click 'Create EOI' and respond to the questions 3) once completed, click SUBMIT

Status
Awarded
EOI Open Date
18 Oct 2021
EOI Close Date
02 Nov 2021
This work package has been awarded to the companies below

BOSCH REXROTH PTY LTD

location_on
21-23 Naweena Road Unit 1 Regency Park SA 5010 AU

This Scope of Supply sets out the requirements for the selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for Winder Rope Attachments to be installed at the OZ Minerals Prominent Hill mine. The Scope of Supply includes, but is not necessarily limited to, the following: 1. Head, Tail and Guide Rope Attachments: Head Rope Fixed Attachment - 4 off Head Rope Adjustable Attachment - 4 off Head Rope Manoeuvring Gland - 4 off Tail Rope Attachments - 8 off Top Guide Rope Anchors - 8 off Bottom Guide Rope Anchors - 8 off Guide Rope Manoeuvring Gland - 4 off i. Tail rope socketing resin. ii. Permanent and temporary surface treatment. To submit an EOI, please: 1. click 'Create EOI' and respond to the questions 2. once completed, click SUBMIT.

Status
Awarded
EOI Open Date
29 Oct 2021
EOI Close Date
15 Nov 2021
This work package has been awarded to the companies below

BECKER MINING AUSTRALIA PTY LTD

location_on
46 Glenwood Drive Thornton NSW 2322 AU

OZ Minerals is seeking expressions of interest (EOI) for the selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for one (1) off complete Rock Breaker Assembly to be installed underground at the OZ Minerals Prominent Hill mine. To submit an EOI, please: 1) review the Scope Document 2) click 'Create EOI' and respond to the questions 3) once completed, click SUBMIT.

Status
Awarded
EOI Open Date
08 Nov 2021
EOI Close Date
23 Nov 2021
This work package has been awarded to the companies below

TRANSMIN PTY LTD

location_on
35 Denninup Way MALAGA WA 6090 AU

This Scope of Supply sets out the requirements for the design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, and acceptance testing for sixteen (16) off complete grizzly panel assemblies comprising of two (2) grizzly panels in each assembly to be installed underground at the OZ Minerals Prominent Hill mine. The Scope of Supply includes, but is not necessarily limited to, the following: 1. Thirty-two (32) grizzly panels: Grizzly Panels - 16 off assemblies (32 off panels) 2. Undertaking all necessary design works to ensure the adequacy of the cast panels, including but not limited to engineering and finite element analysis (FEA). The supplier submission should include any recommended changes in the geometry and heat treatment if required. 3. Completion of final arrangement drawings for cast grizzly panels and submission for review and approval prior to manufacture. 4. Quality control of Cast Grizzly panels. The surface of the castings shall be free of adhering sand, scale, cracks and hot tears as determined by visual and dye penetrant inspection. To submit an EOI, please: 1. click 'Create EOI' and respond to the questions 2. once completed, click SUBMIT.

Status
Awarded
EOI Open Date
05 Nov 2021
EOI Close Date
23 Nov 2021
This work package has been awarded to the companies below

BRADKEN RESOURCES PTY LIMITED

OZ Minerals is seeking expressions of interest (EOI) for the selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning and acceptance testing for one (1) off Clamping and Lifting Device (CLD) to be installed at the OZ Minerals Prominent Hill mine. The Clamping and Lifting Device (CLD) shall be supplied complete, including all necessary supply for complete and proper operation of the equipment. The Scope of Supply includes, but is not necessarily limited to, the following: Design, manufacture and supply of One (1) Clamping and Lifting Device (CLD). The CLD will be used to introduce slack into the head ropes of a ground mounted Koepe Friction hoist during head rope change out. The CLD will be installed on the lower sheave deck of the Head Frame. To submit an EOI, please: 1) Log into the ICN Gateway, click 'Create EOI' and respond to the questions 3) once completed, click SUBMIT.

Status
Awarded
EOI Open Date
19 Nov 2021
EOI Close Date
03 Dec 2021
This work package has been awarded to the companies below

SIEMAG TECBERG AUSTRALIA PTY LTD

location_on
10 - 14 Kellogg Road Glendenning NSW 2761 AU
lock
Login to View Details
Login

If you would like to keep updated on the PHOX Project, please click 'Create EOI' and then click SUBMIT. NB: by responding to this work package, you are not registering interest for any specific work package and your company information will not be provided to the OZ Minerals - Prominent Hill Team. ICN SA may use you company's contact details to inform you about industry briefings, new work packages, etc.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

The Prominent Hill Expansion Project (PHOX) will increase mine production with the construction of a 6.5 MTPA materials handling system to transport ore from the underground mine to the surface course or stockpile. The Rope-up installation works is a critical element required to construct this system. This package is for construction works for the installation of major Rope-up equipment (to be free issued) and supporting equipment (to be supplied by the Contractor). Divided into three separable portions: - SP1: Provision of detailed construction methodology and planning documentation - SP2: Supply of supporting equipment - SP3: On-Site Installation Works

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

This Scope of Work is for the structural, mechanical, piping, civil, and electrical works associated with the upgrade of the Ankata paste plant facility at the Prominent Hill mine. The Ankata Paste Plant takes a portion of the tailings stream from the Prominent Hill processing plant, utilises cyclones to filter out the ultra-fines/slimes portion of the tailings, and then uses a vacuum disc filter to remove water. The wet-cake mix is then further treated and transferred to the underground stopes via a series of boreholes and pipes. The Scope of Work includes demolition, construction, construction verification, commissioning and acceptance testing (where required) of the works. This Scope of Work also includes fabrication, transportation and installation, including structural, mechanical, and piping works (SMP) and Electrical & Instrumentation (E&I) works. The below items are required to be fabricated off-site and supplied by the contractor: - All steel pipe spools - All HDPE pipe spools - All piping gaskets and fasteners - All manual valves - Supports for new cable tray & piping - Floc storage tank (151-TNK-009)

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

A Rope-up and Rope-handling system is required for the Prominent Hill mine shaft as part of the PHOX project. This work package is for the fabrication and supply of the following Rope-up and Rope-handling equipment: 1. 3T Reeler Assembly 2. 3T Reeler Hydraulic Power Unit Assembly 3. 30T Winch Assembly 4. 30T Winch Hydraulic Power Unit Assembly 5. 5T Winch Assembly 6. 5T Winch Hydraulic Power Unit Assembly 7. Factory Acceptance Testing / Commissioning Note that installation will be subject to a separate works package.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

BHP is seeking an engineering services provider (ESP) to design the tailings disposal system upgrade for the Prominent Hill mine site operations expansion project (Services). The tailings disposal system is responsible for delivering tailings from the tails thickener via interconnecting pipework and discharge spigots to the TSF. The existing tailings disposal system has been designed to accommodate the tailings produced when the process plant is operating at its nameplate capacity of 10Mtpa. The future tailings disposal system will be required to operate at both the existing processing plant capacity and at a reduced rate. Previous studies have reported a risk of solids settling in the tailings pipeline at low flow conditions, and possible pump performance issues. The purpose of the Services is to re-confirm these impacts and complete the detailed design for any upgrades required to the tailings disposal system to accommodate the revised tailings throughputs. Maintaining reliable performance of the tailings disposal system for the remaining life of mine is a key priority for the project to ensure continued operation of the process plant. To achieve this, the tailings disposal system must accommodate variability in throughput volumes and material composition reporting to the Tailings Storage Facility. The Services will be delivered in two phases: Phase 1 - Scoping The ESP will familiarise themselves with the project requirements, develop a preferred solution, and summarise the alternative options. These shall be presented to BHP for evaluation and confirmation the solution meets project objectives and operational requirements. Phase 2 - Detailed Design Based on the outcome and endorsement of Phase 1, the ESP will execute the detailed design portion of the Services, including the full range of engineering deliverables for civil, SMP and EIC works.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

BHP Prominent Hill is transitioning from a 10Mtpa processing plant to a 7.5Mtpa processing plant. This decrease in processed material, in addition to increased backfill demand has resulted in the current final tailings pumps (PPC-284, PPC-285, PPC291) operating outside their pump curve. An engineering review has been completed of the likely operating conditions of the final tailings pumps and has found the existing pumps need to be downsized to operate efficiently and reliably. Accordingly, BHP requires civil, structural, mechanical, piping (CSMP) and electrical, control and instrumentation (ECI) works associated with the Tailing disposal system upgrade supply and installation at the BHP Prominent Hill mine. This scope includes the supply and installation of the following infrastructure: - Three Warman 8/6 AHPP pump sets (include 300kw motors) - All piping, valving, instruments - Structural steel, platforms, gridmesh, hand railings, pipe supports. - Civil works (include slabs, bunds, plinths, etc) - New Power and control cabling, cable ladder (expand electrical) - Gland water piping - Relocation of Fire Hydrant - Relocation of Hydraulic Power Unit (HPP-016)

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

The PHOX project will increase mine production with the construction of a 6.5 MTPA materials handling system to transport ore from the underground mine to the surface course or stockpile. The construction of underground Truck Loading stations and Grizzlies is a critical element required to construct this system. This package includes underground Civil, Structural, Mechanical, Piping (CSMP) and Electrical, Control and Instrumentation (ECI) works. The scope includes supply and installation of: - Three (3) off Drive-Through Truck Loading Stations - One (1) off 1 Reverse-In Truck Loading Station - Five (5) off Finger pass Grizzly Stations - Eight (8) off Ore pass Grizzly Stations For further details, please download the attached 'Scope Doc'.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

OZ Minerals is seeking expressions of interest (EOI) for the selection, design, supply, manufacture, delivery, commissioning and acceptance testing for the Surface Switchrooms, Switchgear and Distribution Boards to be installed at the OZ Minerals Prominent Hill mine. To submit an EOI, please: 1) review the Scope Document 2) click 'Create EOI' and respond to the questions 3) once completed, click SUBMIT

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

OZ Minerals is seeking expressions of interest (EOI) for the Civil, Structural, Mechanical and Piping (SMP) and Electrical, Control & Instrumentation (ECI) installation for the surface infrastructure for the OZ Minerals Prominent Hill PHOX shaft sink project. The successful contractor will be required to supply all management, labour, supervision, equipment, services and minor materials, other than free issue materials for all surface construction, installation, temporary works, commissioning and acceptance testing of the project's surface plant and equipment. This package of work will require a significant level of prior experience in mine site installation and commissioning works. To submit an EOI, please: 1) review the Scope Document 2) click 'Create EOI' and respond to the questions 3) once completed, click SUBMIT

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

OZ Minerals is seeking expressions of interest (EOI) for the Civil, Structural, Mechanical and Piping (SMP) and Electrical, Control & Instrumentation (ECI) installation for the underground infrastructure for the OZ Minerals Prominent Hill PHOX shaft sink project. The successful contractor will be required to supply all management, labour, supervision, equipment, services and minor materials, other than free issue materials for all underground construction, installation, temporary works, commissioning and acceptance testing of the project's underground plant and equipment. This package of work will require a significant level of prior experience in underground mining installation and commissioning works. To submit an EOI, please: 1) review the Scope Document 2) click 'Create EOI' and respond to the questions 3) once completed, click SUBMIT

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
Loading...