Overview

About the Project Contractor

SecureEnergy, a Joint Venture between Clough and Elecnor, combines world class, proven experience in delivering 300kV-500kV Power Transmission and major civil Infrastructure projects that will deliver certainty for the EnergyConnect Project.

The project requires significant understanding of large scale HV Transmission and Substation projects, local knowledge of environmental constraints and approvals processes, sustainability, community and stakeholder engagement, large scale resource planning and health and safety requirements. Secure Energy is a trusted and highly experienced energy transmission and infrastructure team, ensuring confidence in a safe and timely delivery of EnergyConnect.

Joint Venture General Statement

SecureEnergy is the joint venture of Elecnor and Clough. Combined, we provide the skills, knowledge, and history to deliver zero harm projects, bringing world class and proven experience in high voltage power transmission, substation and infrastructure projects.

Elecnor is a global leader in high voltage transmission and substation EPC, with nearly 60 years of continuous growth and a presence in more than 50 countries. Elecnor's performance has become a benchmark in the infrastructure, renewable energy and technology sectors. Since 2014, Elecnor has proven a commitment to Australia, completing multiple projects across the country.

Clough is an engineering and construction company founded in Australia in 1919. The company successfully delivers challenging high-performing assets for the energy, infrastructure, and resources industries, underpinned by a dedication to problem solving and getting the job done safely and efficiently. Providing EPC services, the Clough team delivers zero harm projects and has worked on some of the world's largest and most technically and logistically challenging projects.

The Project

TransGrid (electricity transmission operator in New South Wales (NSW) and ElectraNet (electricity distributor in South Australia (SA)) are currently progressing planning approvals and associated activities for the construction and operation of a new electrical interconnector and network support options between NSW and SA.

The interconnector is aimed at reducing the cost of providing secure and reliable electricity transmission between NSW and SA in the near term, while facilitating the longer-term transition of the energy sector across the National Electricity Market (NEM) to low emission energy sources.

The current preferred option involves constructing a high voltage electricity interconnector of approximately 900 kilometres between the power grids of SA (starting at Robertstown) and NSW (finishing in Wagga Wagga), known collectively as Project EnergyConnect.

Project EnergyConnect has been identified as a priority transmission project in the NSW Transmission Infrastructure Strategy (DP&E 2018), linking the SA and NSW energy markets and assisting in transporting energy from the South-West Energy Zone to major demand centres.

TransGrid is the proponent and is responsible for obtaining environmental planning approvals for those components located in NSW.

This Environmental Scoping Report refers to Project EnergyConnect - SA/NSW border to Buronga (the proposal). TransGrid will seek subsequent and separate environmental planning approvals for the remainder of Project EnergyConnect in NSW. Furthermore, environmental planning approvals under the relevant jurisdictions would be sought (by ElectraNet) for the sections of Project EnergyConnect that are located in SA.

As part of the early works for Project EnergyConnect, TransGrid and ElectraNet have proceeded with preliminary investigations into transmission line corridor options, combining various corridor selection criteria together with a broad range of environmental, heritage, land use and social constraints and opportunities. This process initially identified a 10 kilometre-wide preliminary alignment corridor within which more detailed environmental and social studies and community and landholder engagement has been undertaken leading to development of an approximate one kilometre wide proposal study area.

Project EnergyConnect - SA/NSW border to Buronga

Project EnergyConnect - SA/NSW border to Buronga would involve the construction and operation of new high voltage (HV) electricity transmission lines between the NSW-SA border at Chowilla and Buronga; and the expansion of the existing substation facilities at Buronga NSW.

The scope of the application made by TransGrid under Division 5.2 of the Environmental Planning and Assessment Act 1979 (EP&A Act) and the basis for the Scoping Report for the proposal includes:

About 130 kilometres of new 330 kV double circuit transmission line and associated infrastructure between the SA and NSW border in the vicinity of Chowilla, and the existing Buronga 220 kV substation

The expansion of the existing Buronga 220 kV substation to an operating capacity of 330 kV

Establishment and upgrade of access tracks and roads to the new substation and transmission line structures, as required

Other ancillary works required to facilitate the construction of the proposal e.g. laydown and staging areas, concrete batching plants, brake/winch sites, site offices and accommodation camps.

The Proponent

NSW Electricity Networks Operations Pty Ltd as a trustee for NSW Electricity Operations Trust (referred to as TransGrid) is the operator and manager of the main HV transmission network in NSW and the Australian Capital Territory (ACT), enabling more than three million homes and businesses to access a safe, reliable and affordable supply of electricity. Its system transports electricity from sources of generation including wind, coal, solar, gas and hydro to large industrial customers and to the distribution networks which deliver it to homes and businesses. Comprising over 100 substations and more than 13,000 kilometres of HV transmission lines, cables, and interconnections with Queensland and Victoria, the network is instrumental to the electricity system and economy and facilitates energy trading across the National Electricity Market.

Current Status

Project EnergyConnect forms a central feature of the roadmap for the transition of the powersystem developed by the Australian Energy Market Operator (AEMO) in its 2020 IntegratedSystem Plan (ISP). The ISP classifies Project EnergyConnect as an 'actionable ISP project' whichwill deliver net market benefits and support energy market transition.

TransGrid currently is working with relevant State and Commonwealth agencies to progress planning and environmental assessments for the project. In NSW, the project will be assessed under two separate Environmental Impact Statements - NSW Western Section (SA/NSW Border to Buronga and NSW/Victorian Border), and NSW Eastern Section (Buronga to Wagga Wagga).

Further information on TransGrid can be found at www.transgrid.com.au.

Mid Tier Supplier Panel

SecureEnergy has committed to supporting capacity building of prospective suppliers for the EnergyConnect project and forthcoming projects in the region. It recognises business's within the region may need some assistance in developing non-technical capability to provide services to the project, either directly or indirectly through primary contractors performing work on the project.

Companies wishing to apply for the project Mid Tier Supplier panel can do so by completing a "Partial Scope'' against the relevant work package on ICN Gateway. In addition to applying to work on the project, the process will help determine your company's readiness for the project, the geographic area of interest and will allow the project to identify what assistance could be provided to ensure your company is ready for the project and other projects that arise in the region .

Prospective suppliers will be required to address some of SecureEnergy's prequalification requirements. These prequal includes questions relating to financial wellbeing, safety, quality and industrial relations. The answers provided will help to determine what assistance may need to be made available.To qualify, the business must be located in the LGAs of Albury City Council, Balranald Shire Council, Edward River Council, Federation Council, Griffith City Council , Hay Shire Council , Lockhart Shire Council , Murray River Council, Murrumbidgee Shire Council , Narrandera Shire Council , Wagga Wagga City Council and Wentworth Shire Council.

Once a business meets the prequal criteria, it will be placed on the Mid-Tier Supplier Panel, which will be accessible to primary contractors when seeking sub-contractors. Additionally, the company will have access to a central communications portal managed by ICN for information about available training, resources and RFT/RFQ announcement

Briefing session links

https://youtu.be/8i2RVnDbkg0

https://youtu.be/RZzNqMXxMO4

https://youtu.be/8i2RVnDbkg0


26
Total Work Packages
1
Open Work Package
25
Other Work Packages
26
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Project Wide Requirements
Status
Open
Full scope EOI closes on
31 Dec 2025
Partial scope EOI closes on
30 Dec 2025

Please register your interest for any future opportunities that may arise on the EnergyConnect project

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
30 Sep 2021
Partial scope EOI closes on
30 Sep 2021

Secure Energy wish to identify Contractors that have the ability and equipment to provide civil works services - Clearing and Grubbing with relevant plant & equipment.

Awarded Company
ACTIVE TREE SERVICES PTY LTD
location_on
Unit 405 20 Bungan Street Mona Vale NSW 2103 Australia
phone_enabled
+61 2 9997 4422

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
23 Feb 2022
Partial scope EOI closes on
23 Mar 2022

Supply and install Site Pilings for Tower Foundations

Awarded Company
CIVIL GROUP (AUST) PTY LTD
location_on
47 Cairns Street LOGANHOLME QLD 4129 Australia
phone_enabled
+61 7 3209 9388

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
10 Nov 2021
Partial scope EOI closes on
28 Apr 2022

Secure Energy wish to identify Suppliers that have the capacity to provide qualified Level 4 or Level 5 Arborists.

Awarded Company
ENSPEC PTY. LTD
location_on
Unit 22 24 McCallum Street Swan Hill VIC 3585 Australia
phone_enabled
+61 3 9755 6799

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
23 Aug 2021

Secure Energy wish to identify Suppliers that have the capacity to provide a range of installation capabilities for road access points and Access Tracks along the Transmission Line

Awarded Companies
SYMAL INFRASTRUCTURE PTY LTD
location_on
50 Hunter Street Newcastle NSW 2300 Australia
GARRAWAY EARTHMOVING PTY. LTD.
location_on
367 Benetook Avenue Mildura VIC 3500 Australia
phone_enabled
+61 3 5021 5888

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
23 Sep 2021

SecureEnergy wish to identify suppliers that have the experience, plant and personnel to complete the following Works.
- Site set up and operation of the borrow pits
- Site set up and completing of the substation bench and drainage in
3x stages

Awarded Company
GARRAWAY EARTHMOVING PTY. LTD.
location_on
367 Benetook Avenue Mildura VIC 3500 Australia
phone_enabled
+61 3 5021 5888

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
15 Apr 2022

SecureEnergy wish to identify suppliers that have the ability to provide personal protective equipment
This includes but not limited to:
. Shirts (long sleeves)
. Pants (full length)
. Winter Jacket
. Safety Glasses
. Safety Helmet
. Safety Boots
. Water Bottle
. Duffle Bag
. Gloves

Awarded Company
SOUTHLAND SUPPLY GROUP
location_on
20 Nagle Street East Wagga Wagga NSW 2650 Australia
phone_enabled
+61 02 6938 3900

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
09 Apr 2022

SecureEnergy wish to identify suppliers that have the ability and equipment to provide Waste Management Services for Site Works
Industrial Waste various types, collection and disposal of waste over all 7 sites along alignment

Awarded Company
CLEANAWAY WASTE MANAGEMENT LIMITED
location_on
9 Schiller Street East Wagga Wagga NSW 2650 Australia
phone_enabled
+61 02 5908 4401

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
28 Jan 2021

Opportunity Description. SecureEnergy wish to identify suppliers that have the capacity to provide a range of fixed and mobile welfare facilities
This includes the mobilisation, hire, erection, maintenance and removal of welfare facilities. The range of welfare facilities will include:
- Fixed facilities including:
- Lunch (crib) rooms with furniture and appliances
- Ablution blocks
- Portaloo toilets
- Generators and fuel tanks to suit
- Plumbing and tanks for potable water and sewage to suit
- Mobile facilities including:
- Caravan / Wagon type towable combined lunch room with furniture and appliances and ablution blocks with integral generator, fuel tank, potable water tank and sewage tank.
- Mobile facilities shall be provided with RMS registration.
All vehicles including road worthy mobile plant (trailers) used for Works under Contract shall be fitted with GPS tracking capability.
Equipment should be to Industry safety and maintenance standards and be provided with a plant hazard risk assessment.
Welfare facilities will be sited at or operate out of SecureEnergy's laydowns of which 7 are proposed between Wagga Wagga and the SA Boarder.
Options for Hire or Purchase will be evaluated.

Awarded Company
THE TRUSTEE FOR MONACILIONI FAMILY TRUST
location_on
3264 Old Princes Highway MONARTO SOUTH SA 5254 Australia
phone_enabled
+61 8 8534 3000

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
08 Aug 2021
Partial scope EOI closes on
30 Sep 2021

Secure Energy wish to identify suppliers that have the ability and equipment to install fencing on the PEC project.
Steel Fence construction including the following
- Installation of 2, 3, 4 strand fencing
- Gates including strainer posts
- Insulators and the earth
Equipment should all be installed in line with Transgrids Fencing Guidelines.
Equipment should be to Industry safety and maintenance standards.
Operators should possess all necessary VOC and National Certifications of safe plant operation

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
05 Oct 2021
Partial scope EOI closes on
05 Oct 2021

SecureEnergy wish to identify suppliers that have the ability and equipment to provide high quality steel structure buildings including design, manufacture and construction

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
10 Nov 2021
Partial scope EOI closes on
30 Mar 2022

Opportunity Description. SecureEnergy wish to identify suppliers that have the capacity to provide a range of transportation equipment both wet and dry hire.
. Truck and Dogs
. Body Tipper Trucks
. Water Trucks 10 - 40kl
. Fuel trucks
. Service trucks
. Prime Movers
. Trailers incl. extendable, floats to 50T and dolly's
. Single / Dual Cab Trucks with tray
. Crane Trucks
. Tilt Tray Trucks
. Spreader Trucks 20m3
All vehicles including road worthy mobile plant used for Works under Contract shall be fitted with GPS tracking capability, dash camera and Operator Fatigue Management systems as a minimum.
All vehicles including road worthy mobile plant used for Works under Contract shall be fitted with GPS tracking capability, dash camera and Operator Fatigue Management systems as a minimum
Equipment should be to Industry safety and maintenance standards and be provided with a plant hazard risk assessment.
Operators should possess all necessary VOC and National Certifications of safe plant operation.
Plant and equipment will operate out of SecureEnergy's laydowns of which 7 are proposed between Wagga Wagga and the SA Boarder.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
10 Nov 2021
Partial scope EOI closes on
28 Apr 2022

SecureEnergy wish to identify suppliers that have the capacity to provide a range of wet and dry hire plant and equipment
Earthmoving
. Dozers D6 & D8 or equivalent incl. tree pusher
. Compactors 815 or equivalent
. Smooth Drum Vibrating Rollers 10-15T
. Padfoot Vibrating Rollers 10-15T
. Excavators 8 - 40T including attachments such as skeleton, GP and mud buckets, ripper, hydraulic breaker.
. Wheeled Excavators
. Graders 140M - 14M
. Articulated Dump Trucks 20 - 40T
. Backhoes
. Bobcat / Pozitacks
. Wheeled Loaders 950 or equivalent
. Integrated Tool Handers IT28 or equivalent with bucket and forks.
. Scrapers 637 or equivalent
All vehicles including road worthy mobile plant used for Works under Contract shall be fitted with GPS tracking capability, dash camera and Operator Fatigue Management systems as a minimum
Equipment should be to Industry safety and maintenance standards and be provided with a plant hazard risk assessment.
Operators should possess all necessary VOC and National Certifications of safe plant operation.
Plant and equipment will operate out of SecureEnergy's laydowns of which 7 are proposed between Wagga Wagga and the SA Boarder.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
10 Nov 2021
Partial scope EOI closes on
28 Apr 2022

Opportunity Description. SecureEnergy wish to identify suppliers that have the capacity to provide a range of plant:
. Telehandlers 6-19m reach / 5 - 25T
. Generators 5 - 100kVA
. Lighting Towers
. Elevated Work Platforms / Boom Lifts etc
All vehicles including road worthy mobile plant used for Works under Contract shall be fitted with GPS tracking capability, dash camera and Operator Fatigue Management systems as a minimum.
All vehicles including road worthy mobile plant used for Works under Contract shall be fitted with GPS tracking capability, dash camera and Operator Fatigue Management systems as a minimum
Equipment should be to Industry safety and maintenance standards and be provided with a plant hazard risk assessment.
Operators should possess all necessary VOC and National Certifications of safe plant operation.
Plant and equipment will operate out of SecureEnergy's laydowns of which 7 are proposed between Wagga Wagga and the SA Boarder.
Supplier Requirements. SecureEnergy requires suppliers that:
. Have a demonstrated track record of providing Plant and Equipment hire for a Tier One Contractors.
. Have updated service logs for all plant and equipment.
. Have the required government or industry certifications, licenses, associations and/or insurances to deliver the opportunity.
. Have an exemplary safety record and a documented management system for tracking safety performance.
. Are financially viable and can demonstrate commercial value.
. Can demonstrate a strong commitment to training and retaining a local workforce.
. Have an excellent track record in employing and progressing the careers of Indigenous people.
. Are progressively finding ways to develop the careers of women, veterans and people with disabilities.
. Treat the environmental they are working in with respect and consideration.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
10 Nov 2021
Partial scope EOI closes on
28 Apr 2022

SecureEnergy wish to identify suppliers that have the capacity to provide a range of wet and dry hire cranage.
This includes the wet and / or dry hire of cranes including mobilisation, maintenance and servicing and demobilsation. The classes of cranes will include
- Truck Cranes 5 to 10T
- Hydraulic All Terrain Pick & Carry Cranes 15 to 25T
- City-Class Hydraulic Cranes 20 to 55T
- All-Terrain Hydraulic Cranes 50 to 450T
Equipment should all be fitted with GPS Tracking and Operator Fatigue Management systems.
Equipment should be to Industry safety and maintenance standards.
Operators should possess all necessary VOC and National Certifications of safe plant operation.
Cranes will operate out of SecureEnergy's laydowns of which 7 are proposed between Wagga Wagga and the SA Boarder

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
25 Mar 2022

SecureEnergy wish to identify suppliers that have the experience and personnel to complete the following Works.
. Set out site boundaries and confirm property boundaries in the vicinity of the site.
. Set out concrete footings and foundations, various underground services (drainage, communication and electrical conduits etc), and WAC survey of these.
. Process the survey data and produce drawings, or provide the drawing files as required.
Site mobilisation is expected June 2022, with all works to be completed by December 2022.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Feb 2022

a) The Cattle / Stock grid of 4m x 2.1m shall be designed and Manufactured in accordance with Australian and relevant state transport standards.
b) 500mm deep, 40MPa Concrete abutment shall be supplied to suit the size of the Cattle /Stock grid as per Figure - (example only). Supplier to provide drawings certified by Structural Engineer.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Sep 2021

Secure Energy wishes to identify Suppliers that
have the capacity to provide charter buses and coaches to
support the movement of the project workforce.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Jan 2021

SecureEnergy wish to identify subcontractractors that have the capacity and experience to perform Civil and Earth Works packages.
This includes the provision of Management, Supervision, Labour and Plant and Equipment. The types of works that would be undertaken would include
- Establishment and provision of temporary offices and welfare facilities for works
- Protection of existing site services
- Temporary access road point construction from existing roads;
- Site preparation including clear and grub works and top soil stripping
- Erection and management of sediment and erosion control measures
- Temporary site fencing
- Establishment of borrow pit(s) including: top soil and overburden removal
- Temporary access track construction
- Bulk earthworks to form camp and laydown pads
- Culvert and drainage installation
- Turkey nest / dam construction
- Temporary car pack construction
- Concrete hardstands for workshops and laydown facilities
- Operation of borrow pit(s) to win material for bulk earthworks
- Bulk earthworks for substation(s) including haulage, placement and compaction of material
- Underground and Infrastructure services including site drainage works.
Equipment should all be fitted with GPS Tracking and Operator Fatigue Management systems.
Equipment should be to Industry safety and maintenance standards.
Operators should possess all necessary VOC and National Certifications of safe plant operation.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
07 Dec 2021

The Substation earth grid conductors shall be flat copper strip to designation C11000 to AS1566
Over Head transmission line earthing to be defined

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Feb 2022

SecureEnergy wish to identify suppliers that have the ability to supply Reinforcement Steel bars (3 grades N32, N24, N16) and Fabricate Reinforcement Cages to Australian Standards

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Jan 2021

SecureEnergy wish to identify suppliers that have the capacity to provide a range of light vehicles and trucks.
This includes the hire of light vehicles and trucks including mobilisation, maintenance and servicing and demobilsation. The range of light vehicles and trucks will include
- 4WD dual cab utes
- 4WD single cab utes
- 4WD wagons
- 4WD light trucks and buses including:
- 12 seat bus
- 14 seat bus
- 18 seat bus
- 20 seat bus
- 32 seat bus
- 5 seat dual cab truck with tray
- 7 seat dual cab truck with tray
All vehicles including road worthy mobile plant used for Works under Contract shall be fitted with GPS tracking capability, dash camera and Operator Fatigue Management systems as a minimum.
All vehicles shall confirm with the specifications for unsealed / off road or remote / rural areas: Refer table in attachment for relevant information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Sep 2022

Manufacture , Supply and Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Mar 2022

SecureEnergy wish to identify suppliers that have the ability and resources to provide training and assessment services and associated training and assessment material / equipment.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Jan 2021

SecureEnergy wish to identify suppliers that have the capacity to provide a range of specialist plant:
. Tractors with offset plough and / or slasher
. Excavators 8 - 40T including attachments such as shears, grab, harvester, stick rake
. Broad Acre Mulchers
. Horizontal and Tub Grinders ~ 800HP
All vehicles including road worthy mobile plant used for Works under Contract shall be fitted with GPS tracking capability, dash camera and Operator Fatigue Management systems as a minimum.
All vehicles including road worthy mobile plant used for Works under Contract shall be fitted with GPS tracking capability, dash camera and Operator Fatigue Management systems as a minimum
Equipment should be to Industry safety and maintenance standards and be provided with a plant hazard risk assessment.
Operators should possess all necessary VOC and National Certifications of safe plant operation.
Plant and equipment will operate out of SecureEnergy's laydowns of which 7 are proposed between Wagga Wagga and the SA Boarder.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
03 Jun 2022

SecureEnergy wish to identify suppliers that have the ability and equipment to supply and install high quality steel structures.
The following works will be required :
Procure, manufacture, transport and erect at project site as per detailed design drawings.
Project site: Buronga Substation and Dinawan Substation