DEPARTMENT OF HEALTH

BALLARAT BASE HOSPITAL REDEVELOPMENT

location_onVIC Australia
location_on

VIC Australia

business

DEPARTMENT OF HEALTH

Project Primary Contact
person_outline
Michael Smith
Industry Adviser
phone_enabled
+61 447 330 836
Overview

The Victorian Government is investing $541.6 million to redevelop and expand the Ballarat Base Hospital.


The redevelopment will deliver a new emergency department, a women and children's hub, state-of-the-art theatre suite and an extra 100 additional inpatient and short stay beds.


A new and expanded critical care floor will bring together operating theatres, procedure rooms, an expanded intensive care unit, endoscopy suites and consulting rooms - delivering capacity for an additional 4,000 surgeries every year.


Once completed, the upgraded hospital will have the capacity to treat at least 18,000 more emergency patients and an extra 14,500 inpatients per year.


The redevelopment will be completed over multiple stages and construction of the final stage is expected to be completed in 2027.


Decant Works


This package of works includes the decanting of existing departments out of the Edward Wilson Building for demolition to ground level and the scope includes:

  • Construction of a new Reception Desk, Support Services Office, Prayer Room; Spiritual Centre and Mailroom on the Ground Level of Gardner Pittard Building,
  • Heavy refurbishment of Level 1 Cafeteria Building;
  • Heavy refurbishment of Level 3 within the BRICC Building; and
  • Demolition of the Edward Wilson Building

Awarded to H Troon with completion due June 2021


Central Energy Building


This package of works is for the construction of a 6 storey tower including:

  • Sitewide Central Energy Plant
  • Education & Training
  • Pharmacy & Pathology
  • Staff Workstation Hubs

Potential of some refurb/repurposing of spaces within existing buildings.


Tenders for this package will be released approx. June 2022 with construction completion due mid 2024 (subject to change)


Main Tower

This package of works includes the demolition of required buildings to clear the site, the refurb of spaces within existing buildings and the construction of a 7-8 storey tower including:

  • Emergency Department
  • Theatres and Procedure Rooms
  • CSSD
  • Maternity, Birthing & Special Care Nursery
  • 100 new inpatient and short-stay beds

Potential of some refurb/repurposing of spaces within existing buildings.


Tenders for this package will be released in mid 2022 with construction completion due end of 2027 (subject to change)


Project Timings

Construction commences - Mid 2021

Construction completion - Late 2027 (subject to change)


Project Website


This is NOT an EOI for potential Construction Companies as that process will be carried out directly by the Victorian Health Building Authority (VHBA). However if you are a sub-contractor and/or product supplier please Register an EOI as below:


HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)

  • To submit an initial EOI, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
  • This is an initial, generic EOI submission only. All companies who submit an EOI will be included in information presented to Construction Companies who are shortlisted to bid for this Project.
  • All companies who submit an EOI will be included in information presented to the project owner.
  • It will then be the responsibility of the project owner to make direct contact with your company.
  • The services, programmes and initiatives provided by ICN Victoria are aimed at complementing a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.


ICN GATEWAY COMPANY REGISTRATION

  • Click hereto register your company profile on ICN Gateway.
  • Support and assistance is available through the web links listed below.
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN network - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • Companies should ensure that the email notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to ICN Information and Updates, Major Projects and Regional Opportunities.

(1)ICN Gateway Setup Wizard

(2)ICN Gateway User Guide

2
Total Work Packages
2
Open Work Packages
2
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Status
Open
Full scope EOI closes on
31 Dec 2024
Partial scope EOI closes on
31 Dec 2024

Express interest for any opportunities that may arise for this project.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2024
Partial scope EOI closes on
31 Dec 2024

The Ballarat Base Hospital Project may have potential opportunities for locally manufactured Items such as, but not limited to:
Beds - Clinical
Beds - Mental Health
Bins
Bins - Clinical
Blood fridges
CSSD Equipment
Cleaning equipment
Commercial whitegoods
Couches, trolleys and medical chairs
Curtains
Dispensers
Domestic whitegoods
Drug safes
Furniture - chairs, desks
Furniture - loose items
Medical fridges and freezers
Mortuary equipment
Operating tables and associated equipment
Patient lifter
Pendants and lights
Pharmacy equipment
Recliners
Scales
Shelving
Warming cabinets
Washers

As well as:
Anaesthetic machine
Diagnostic equipment
Dialysis machine
Endoscopy
infusion pumps
Medical imaging
Patient monitoring
Pump - breast
Screens
Surgical equipment
Surgical instruments
Theatre equipment
Ventilators

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.