ACCIONA CONSTRUCTION AUSTRALIA PTY LTD

Western Harbour Tunnel Stage 2

Overview

The Western Harbour Tunnel Project (WHT) includes 6.5 kilometres of dual three-lane tunnels, stretching from the Warringah Freeway in Cammeray, across Sydney Harbour, to the WestConnex interchange at Rozelle, alleviating congestion on the Anzac Bridge, Sydney Harbour Bridge and Sydney Harbour Tunnel.

The Tunnel will be delivered in two packages:
- Stage 1 (delivered by John Holland CPB Contractors) includes excavation and partial civil fit out of the southern section of the tunnel between Rozelle and Birchgrove.
- Stage 2 (this project) includes the construction of approximately 4.8 kilometres of tunnels from under Birchgrove, through to the Warringah Freeway near North Sydney and tunnelling under Sydney Harbour. Stage 2 also includes the remaining civil fit out of the Stage 1 section, surface works at the North Sydney end of the tunnel, and mechanical and electrical fit out for the entire 6.5km length of the tunnel.

ACCIONA Construction Australia Pty Ltd has been appointed by Transport for NSW to deliver Stage 2 of the WHT Project.

ACCIONA is proposing that roadheaders will be used to excavate the tunnels on the northern side of Sydney Harbour between North Sydney and Balls Head. Two tunnel boring machines (TBMs) will be used to excavate the remainder of the tunnels from Birchgrove on the southern side of the Harbour through to a cavern at Balls Head where they will meet the northern roadheader tunnels.

The Stage 2 tunnelling works are outline in Figure 1 below. The orange lines indicate the TBM tunnels and the caverns where the TBMs will be launched and retrieved. While the light blue lines indicate the roadheader tunnels. The dark blue lines indicate the extent of Stage 1 works. Figure 2 demonstrates the tunnel vertical alignment from south at Birchgrove to north at Warrigah Freeway.

Further information on the project is available here with an interactive portal to provide area specific information to help you navigate the project.

How to register an Expression of Interest (EOI)
- Work packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to the EOI User Guide below for instructions and assistance to submit an EOI.
- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.

ICN Gateway Company Registration
- Click here to register your company profile on ICN Gateway.
- Support and assistance is available through the web links listed below.
- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

Western Harbour Tunnel Stage 2

ACCIONA CONSTRUCTION AUSTRALIA PTY LTD

location_on

NSW Australia


Project Primary Contact
person_outline
Thuy Ho
badge
Operations Manager
phone
+61 02 9927 3100
mail Send Email

Civil Fitout

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login

Supply and potentially install of AI detection/ CCTV cameras in the tunnel.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

May include the supply and installation of fencing, along with hard landscaping for the shared pedestrian bridge.

Status
Pending
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

General earthworks and groundworks (cut and fill earthworks)

Status
Pending
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply and installation of motorway signage.

Status
Pending
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

This scope covers the second Southern section of the Project, the TBM Tunnel: - Excavation - Pipe Install - Pit Install (including pipe connections) - Subsurface drain install - Backfill after installation of pit, and pipe.

Status
Pending
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

The supply, design, installation and certification of formwork, falsework, access platforms and walkways, fixing of reinforcement steel, placement of concrete and finishes for the following in-situ concrete elements.

Status
Pending
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Installation of concrete curbs, completion of paving works.

Status
Pending
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Road line marking and the supply and installation of street signage.

Status
Pending
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply and installation of parkland furniture and playground equipment.

Status
Pending
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Completion of CCTV pipe inspections in the tunnel.

Status
Pending
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI

Project Wide

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login

Completion of project landscaping, including the installation of trees, plants and associated works.

Status
Pending
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
Loading...