ARAFURA RARE EARTHS PTY LTD

Nolans Project

Overview

Arafura Nolans Project Ltd (Arafura) is developing the Nolans Rare Earths project (the Project), which will encompass a mine, beneficiation plant, extraction plant, separation plant, sulphuric acid plant, and related non-process infrastructure to be constructed in the Northern Territory. The project site is on Aileron Station, approximately 135 kilometres NW of Alice Springs.

The Project mining operation will use conventional open-pit truck and excavator mining methods, supplemented by drill and blasting for ore and waste. A JORC-compliant Ore Reserve supports an initial mine life of 38 years, with mining and processing of all known mineral resources extending the project's operational life beyond 45 years. Ore Reserves are based on an average mining rate of 7.6 million tonnes per annum to produce 1 to 1.3 million tonnes of ROM ore each year and 316,000 tpa of concentrate through the hydrometallurgical plant to produce a range of rare earth products and a phosphoric acid by-product.

Project Status

The site enabling works, consisting of minor bulk earthworks and the installation of the bore field headworks, was completed in late 2023.

In March 2024 Arafura received conditional support from the Commonwealth Government with a debt finance package of US$533 million. This announcement catalysed Arafura to advance the project's remaining debt and equity funding. Once this remaining funding is secured, Arafura will be ready to make a final investment decision on Nolans and move immediately into construction. Arafura is committed to providing updates on the timing of construction commencement and other milestones.

Nolans Project

ARAFURA RARE EARTHS PTY LTD

location_on

NT Australia


Project Primary Contact
person_outline
Industry Capability Network (NT)
phone
+61 08 8922 9422
mail Send Email

General Updates

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login

Express interest to be notified of any updates or opportunities that may arise.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Work Packages

Work Package
EOI Open Date
EOI Close Date
Status

See attached scope of work for additional information.

Status
Awarded
EOI Open Date
14 Jun 2022
EOI Close Date
30 Jun 2022
This work package has been awarded to the companies below

SILVER CITY DRILLING

location_on
LOT 45 Barfield Road BANANA QLD 4702 AU
Contact
person_outline
Vivian Oldfield
email
vivoldfield@oftrust.com.au

Construction Contract (Earthworks).

Status
Awarded
EOI Open Date
01 Feb 2022
EOI Close Date
18 Feb 2022
This work package has been awarded to the companies below

BLACK CAT CIVIL PTY LTD

location_on
968 Nambour Connection Road Nambour QLD 4560 AU
Contact
person_outline
Brendan Flynn
email
brendan@blackcatcivil.com.au

See attached scope of work for additional information

Status
Awarded
EOI Open Date
14 Jun 2022
EOI Close Date
24 Jun 2022
This work package has been awarded to the companies below

SILVER CITY DRILLING

location_on
LOT 45 Barfield Road BANANA QLD 4702 AU
Contact
person_outline
Vivian Oldfield
email
vivoldfield@oftrust.com.au

This work package has been awarded to the below company.

Status
Awarded
EOI Open Date
14 Jun 2022
EOI Close Date
24 Jun 2022
This work package has been awarded to the companies below

GROUNDWAVE DRILLING SERVICES (AUSTRALIA) PTY LTD

location_on
13 Huntington Street Clontarf QLD 4019 AU
Contact
person_outline
Duncan Black
email
duncanb@groundwavedrilling.com

Expression of Interest (EOI) process to find suitable Proponents who can deliver the owners team support (IPMT) contract package.

Status
Awarded
EOI Open Date
28 Jan 2020
EOI Close Date
28 Jan 2020

This work package has been awarded to the below company.

Status
Awarded
EOI Open Date
17 Feb 2022
EOI Close Date
07 Mar 2022
This work package has been awarded to the companies below

PLUMMERS INDUSTRIES PTY LTD

location_on
10 Wheeler Street BELMONT WA 6104 AU
Contact
person_outline
Joape Soko
email
tenders@plummers.com.au

Hydrometallurgical Plant Engineering and Procurement contract.

Status
Awarded
EOI Open Date
01 Sep 2021
EOI Close Date
13 Sep 2021
This work package has been awarded to the companies below

HATCH PTY LTD

location_on
'The Barracks', 61 Petrie Terrace BRISBANE QLD 4000 AU
Contact
person_outline
Claudia Wong
email
claudia.wong@hatch.com

Monadelphous Engineering Associates Pty Ltd is the preferred contractor for the Hydromet construction.

Status
Awarded
EOI Open Date
01 Jan 2023
EOI Close Date
28 Feb 2023

Sulphuric Acid Plant for the Nolans Neodymium-Praseodymium Project

Status
Awarded
EOI Open Date
08 Feb 2023
EOI Close Date
27 Feb 2023
This work package has been awarded to the companies below

Chemetics

location_on
2930 Virtual Way Vancouver Metro Vancouver BC V5M 3M4 CA
Contact
person_outline
Matthew King
email
matthew.j.king@worley.com
lock
Login to View Details
Login

Design and construction involving electrical and civil works relating to the burying by directional drilling of powerlines currently crossing the Stuart Highway. Further details available in the attachment.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

The Beneficiation EPC package includes: . Ore receival facility. . Crushing plant. . Grinding and Milling facility. . Flotation and Dewatering facility. . Beneficiation Reagent plants.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Expression of Interest (EOI) for suppliers of equipment and materials for the early works / non-process infrastructure services and construction packages.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Expression of Interest (EOI) for suppliers of equipment and materials for the Beneficiation Plant.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

The PCS package scope of work shall include the supply of all professional and technical resources, software and equipment necessary to engineer, design, manufacture, install, test and commission the process control system for the process plant (Beneficiation Plant, Hydrometallurgy Plant and Sulphuric Acid Plant).

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Works include the material supply, installation and termination of site CSMPEI related works for non-process site utilities interfacing with the main Hydrometallurgical contractor. Further details available in the attachment.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Expression of Interest (EOI) for suppliers of equipment and materials for the Sulphuric Acid Plant.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Expression of Interest (EOI) process to find suitable Proponents who can deliver the main process plant package.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Expression of Interest (EOI) for suppliers of equipment and materials for the Hydrometallurgical Plant.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Please see the attached scope for further information.

Status
Under evaluation
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Please see the attached scope for further information.

Status
Under evaluation
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Construction Contract (Bore Development and Headworks).

Status
No longer required
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

This work package has been cancelled.

Status
No longer required
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
Loading...