OZ Minerals Carrapateena Pty Ltd

Carrapateena Expansion Stage 2 Project (CXPS2)

Overview

The CXPS2 Project will extend the operating life of Carrapateena by transitioning from sub-level caving to block caving and increasing ore throughput from approximately 7 Mtpa to 12 Mtpa. The development includes a new block cave mine, expanded underground materials handling infrastructure, a new crusher, an additional concentrator, and supporting surface infrastructure. Long-lead procurement is targeted to commence in Q2 FY2027, with construction planned to start in Q1 FY2028.



Project Scope

The underground mining scope includes development of the block cave footprint through extensive lateral and vertical mine development, drawbell and undercut construction, hydrofracturing activities, extraction drives, and supporting mine infrastructure. The project will progressively close portions of the existing Sub-Level Cave operation while transitioning production to the new Block Cave mine. Mining operations will incorporate remote loading systems at drawpoints with future progression toward autonomous mining technologies.

Supporting underground infrastructure includes dewatering systems, pump stations, electrical reticulation, communications networks, potable and fire water systems, compressed air, workshops, fuel facilities, explosive magazines, ventilation and refrigeration systems, and geotechnical and hydrogeological monitoring systems. These facilities will provide the services required to support safe and productive underground mining operations.

The project also includes expansion of the Materials Handling System (MHS), comprising a new crushing tipple, run-of-mine bin, primary crusher, crushed ore storage facilities, conveyor systems, transfer stations, stackers, tramp metal removal systems, and upgrades to existing ore handling infrastructure. The expanded MHS will transport ore from the underground mine to the processing facilities and support sustained production at increased throughput rates.

To accommodate higher ore production, CXP Stage 2 includes construction of an additional ~5 Mtpa concentrator. The mineral processing facilities will include stockpile reclaim systems, grinding circuits, flotation and regrind circuits, reagent storage and distribution, concentrate thickening, concentrate filtration and storage facilities, and tailings handling systems integrated with the existing Tailings Storage Facility infrastructure.

The scope further includes substantial surface infrastructure developments, including access roads, laydown areas, warehouses, workshops, office and crib facilities, stormwater management systems, water storage and reticulation infrastructure, and power distribution systems. Regional infrastructure works include a new water supply system incorporating approximately 55 km of pipeline and associated pumping infrastructure, expansion of the regional power supply network including a new 132 kV yard, and upgrades to the Western Access Road to support construction and operational requirements.

Project Execution Schedule

Current planning indicates that procurement activities for long-lead equipment and critical supply packages will commence during Q2 FY2027 to support engineering development and execution readiness. Construction activities are planned to commence in Q1 FY2028, with procurement activities progressively aligned to engineering releases, work package readiness, construction sequencing, commissioning requirements, and operational integration milestones.

The procurement strategy has been developed to ensure that equipment, materials, and contractor services are available when required to support underground development, surface construction, infrastructure installation, commissioning, and operational readiness objectives.

Procurement and Supply of Goods and Services

The procurement function will play a critical role in enabling successful project delivery by ensuring the timely sourcing, acquisition, expediting, delivery, and management of all goods and services required to execute CXP Stage 2. Procurement activities will be aligned to overall project execution readiness objectives, including material readiness, construction readiness, commissioning readiness, and operational readiness.

The project is expected to involve a combination of engineered equipment purchases, bulk material supply agreements, specialist contractor engagements, construction trade contracts, logistics services, mining infrastructure packages, and long-lead equipment procurements. Procurement activities will include market engagement, supplier qualification, tendering, evaluation, award recommendation, contract formation, supplier performance management, expediting, logistics coordination, quality surveillance, contract administration, and close-out.

Worley, acting as BHP's EPCM contractor and authorised representative for procurement execution, will manage the end-to-end procurement process on behalf of the project. This includes development of sourcing strategies, preparation and issue of enquiries, commercial evaluation of bids, management of supplier negotiations, administration of awarded contracts and purchase orders, coordination of supplier quality surveillance activities, logistics management, and support of supplier commissioning and close-out activities.

A strong emphasis will be placed on procurement planning, early supplier engagement, management of long-lead equipment packages, supplier performance monitoring, risk management, and integration with project engineering and construction teams to ensure procurement deliverables directly support successful project execution outcomes. The procurement approach will also support local content objectives, Indigenous participation opportunities, and compliance with BHP governance, safety, sustainability, and contractor management requirements throughout the project lifecycle.

Carrapateena Expansion Stage 2 Project (CXPS2)

OZ Minerals Carrapateena Pty Ltd

location_on

SA Australia


Project Primary Contact
person_outline
Alex Vojdani
badge
Supply Chain Manager
phone
+61 04 4727 7175
mail Send Email
Project Secondary Contacts
person_outline
Eddie Ivar
badge
ICN South Australia
mail Send Email

Process, Electrical & Mechanical Equipment Supply Packages

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Design and supply of: -9 x 11 kV 5-Way Ring Main Units (to be installed in underground mine cuddies). Works include design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery and acceptance testing.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Supply, Design, select, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, commissioning assistance, and acceptance testing for the complete Cranes and Winches package including all ancillary items consisting of the following: - 9 off Cranes (1x double girder top running bridge crane 60 tonnes WLL, 3x double girder top running electric overhead bridge crane 40 tonnes WLL, 2x double girder top running electric overhead crane 30 tonnes WLL, 1x double girder top running bridge gantry crane 10 tonnes WLL, 1 x single girder top running electric overhead crane 20 tonnes WLL, 1x single girder top running electric overhead crane 5 tonnes WLL) - 2 off take up Winches (2x 110kN tension, VVVF drive 0.35m/s rope speed within the tesnsion range of 50-105kN) - 6 off Sheaves (Two (2) Single Sheaves (per conveyor - four {4} in total and One (1) Double Sheave (per conveyor - two {2} in total)

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Design and supply of power transformers: -11kV/415V 1500kVA KNAN Underground Transformer and NER (1 off). -11kV/415V 1000kVA KNAN Underground Transformers and NERs (5 off). -11kV/415V 1000kVA KNAN Surface Transformer (1 off). -11kV/415V 1500kVA KNAN Surface Transformer (1 off). Works include design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery to site, commissioning assistance, and acceptance testing inclusive of all ancillary items for the complete transformer package with Neutral Earthing Resistors (NER).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Selection, design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, and delivery for: -three (3) off high lift Positive Displacement Piston Diaphragm Dewatering Pumps, (3 phase, 3.3kV motor with VSD and 30 Ltr/s capacity, 1130 mtrs total head) -two (2) fully integrated skid mounted Rotary screw compressor/Instrument air package units including compressor, dryer and receiver installed, -and one (1) Centrifugal Vertical Dam Agitation Slurry Pump complete with all equipment, auxiliary and ancillary items.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Design (shop detailing), supply, fabrication, manufacture, quality assurance, quality control, inspection, testing (where required), packaging, preservation, insurances, statutory compliance, certification, transportation and delivery associated with the supply of structural and mechanical steel, platework and ancillary items for the complete steelwork fabrication package. Please download the Scope Document for additional details to include within Scope definition.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Design and supply of: -Prefabricated electrical switchroom buildings that can be transported underground, including 7 x high voltage switchrooms and 6 x low voltage switchrooms. -Low voltage motor control centres. -Electrical and instrumentation field equipment including local control stations, remote input/ouput panels and communication cabinets. Works include design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery and acceptance testing.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Design and supply of: -6 x high voltage variable speed drives for 11 kV / 3.3 kV 1250 kW conveyor motors. -3 x high voltage variable speed drives for 11 kV / 3.3 kV 400 kW duty pump motors. -1 x high voltage variable speed drive for 11 kV / 3.3 kV 650 kW crusher motor. -2 x high voltage variable speed drives for 11 kV booster fan motors. Works include design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery and acceptance testing.