PSD Energy

Northern Battery Project

Overview

PROJECT OWNER AND CONTRACTOR

The Northern Battery is being developed by AMPYR in partnership with Green Gold Energy (GGE) to provide South Australia with energy reliability and security through energy storage. PSD Energy has been engaged as the Balance of Plant (BOP) / EPC contractor. PSD Energy is an Adelaide-headquartered electrical engineering, design and construction company established in 2005 and is a Quanta Services company. PSD Energy delivers solar farms, battery energy storage systems (BESS), substations and transmission works across Australia.

PROJECT OVERVIEW

The Northern Battery will comprise modular batteries and inverters installed in rows, with a nameplate capacity of 270 MW and a total storage capacity of 1,145 MWh at the point of connection. The project includes battery containers and associated inverter / medium voltage skids supplied by the battery manufacturer, installed on concrete foundations, together with 33 kV collection cabling, earthing and lightning protection, site roads and drainage, stormwater and fire water retention, fire services, security fencing, CCTV and access control, lighting, and permanent operations buildings including staff amenities and storage.

A new substation will be developed adjacent to the battery area and connected to ElectraNet's Davenport substation via a new underground transmission line. The substation and transmission line are being constructed by a separate contractor and are not part of the work packages listed on this portal.

LOCATION

The site is on part of the former Northern Power Station site at Port Paterson, approximately 6 km south of the Port Augusta town centre in regional South Australia. Construction vehicle access is via the Augusta Highway and Northern Power Station Road. The battery area is approximately 7.7 ha. The site is a low-lying coastal location with hot, dry summers, and suppliers should allow for regional logistics and the site's environmental conditions.

PROJECT TIMEFRAMES (INDICATIVE)

  • Site mobilisation and establishment: January 2027
  • Site set-up and bulk earthworks: January to May 2027
  • Civil works and foundations: May to October 2027
  • Cabling and electrical works: June to December 2027
  • Battery and inverter deliveries: From March 2027, with installation from July to November 2027
  • Testing and commissioning: August 2027 to mid-2028, with operation expected around mid-2028

Standard site hours are Monday to Saturday, 7:00 am to 7:00 pm. PSD Energy's on-site workforce is expected to peak at around 50 people in mid to late 2027.

All dates are indicative and depend on the final construction program.

WORK PACKAGES

Work packages are listed on this portal in groups aligned to the construction program:

  • Site establishment and support services: Needed from mobilisation, including security, temporary facilities, temporary power, waste, water and septic services, fuel, traffic management, accommodation, surveying, testing, environmental services, consumables, precast footings, electrical bulk materials and crane hire.
  • Civil, materials and plant packages: For 2027, including concrete and reinforcement, quarry products, drainage and fire water pond works, precast products, plant hire, labour hire, steel fabrication, MV and DC cable supply, fencing and security systems, and fire services.
  • Finishing packages: Including supply and erection of the O&M shed, site lighting and small power supply, and revegetation and landscaping.

PSD Energy will self-perform a number of scopes, including cable installation, HV jointing and testing, earth grid testing, fibre optic installation, the O&M crib and office building, piling and workforce transport.

Further packages may be added, and listed packages may be split, combined, varied or withdrawn as the design and program develop. Partial scope registrations are welcomed from lower-tier suppliers where indicated.

PROCUREMENT PROCESS

1 - Suppliers register an Expression of Interest (EOI) through ICN Gateway against each relevant work package and answer the package questions.

2 - PSD Energy reviews EOIs for capability, capacity, relevant experience, WHS, quality and environmental performance, insurances and licensing, and local and First Nations participation.

3 - Shortlisted suppliers are invited to submit a quotation or tender against a Scope of Works and PSD Energy's subcontract or purchase order terms.

4 - Quotations and tenders are evaluated on value for money, which includes price, safety, capability, program, quality and local content.

5 - Successful suppliers are engaged under PSD Energy's subcontract or purchase order terms, which include relevant flow-down obligations from the head contract. No work is to start until a subcontract or purchase order has been executed.

Registering an EOI does not guarantee an invitation to quote or the award of any work. PSD Energy will not reimburse any costs incurred in responding to an EOI or request for quotation.

REQUIREMENTS FOR SUPPLIERS AND SUBCONTRACTORS

Depending on the package, suppliers and subcontractors will be required to demonstrate the following:

  • Work health and safety: A WHS management system appropriate to the scope, Safe Work Method Statements for high-risk construction work, compliance with the Work Health and Safety Act 2012 (SA) and Regulations, and participation in PSD Energy's site inductions and safety systems as Principal Contractor.
  • Insurances: Public and products liability (typically not less than $20 million), workers compensation (ReturnToWorkSA or equivalent), motor vehicle and plant insurance, and professional indemnity where design or advice is provided.
  • Licences and accreditations: Relevant to the scope, for example SA electrical contractor licences, security licences, EPA licences for waste transport, NATA accreditation for testing services, HV jointing competencies, and DIT-recognised traffic management accreditations.
  • Quality: Inspection and test plans and records consistent with ISO 9001 principles, and materials supplied with compliance certificates to the relevant Australian Standards.
  • Environment: Compliance with the project Construction Environmental Management Plan and EPA licence conditions, including dust, noise, erosion and sediment control and waste management.
  • Workplace relations: Workers employed and paid in accordance with the applicable modern award or registered enterprise agreement and the Fair Work Act 2009 (Cth), with superannuation and portable long service leave obligations met. Labour hire may only be supplied by providers licensed under the Labour Hire Licensing Act 2017 (SA). Subcontractors and suppliers remain responsible for employing, directing and paying their own workers.
  • Ethical sourcing: Commitment to identifying and addressing modern slavery risks consistent with the Modern Slavery Act 2018 (Cth), and adherence to PSD Energy's supplier code of conduct.

LOCAL AND FIRST NATIONS PARTICIPATION

PSD Energy is committed to maximising opportunities for local people and businesses on the Northern Battery. Where suppliers are available and competitive, PSD Energy will:

  • Consider local workforce and supplier capacity when selecting subcontractors and suppliers.
  • Invite First Nations-owned businesses to quote, and encourage subcontractors to do the same.
  • Use local apprentices and trainees where the scope allows.
  • Use local suppliers and accommodation providers.

Roles are advertised locally, including through the Spencer Gulf Jobs and Skills Hub and TAFE SA.

INDIVIDUALS SEEKING EMPLOYMENT

This portal is for businesses. Individuals seeking employment should email nbessenquiries@psdenergy.com with their name, contact details, trade or skills, and any licences or tickets held. All roles are filled through PSD Energy's standard recruitment processes.

NEXT STEPS

Following the close of each work package listing, PSD Energy will review registrations and contact shortlisted businesses with request for quotation or tender documents. Questions about this portal can be directed to ICN SA. General project information is available at www.northernbattery.com.au.

All information on this page, including scope, quantities and dates, is indicative only. It may change as the design and construction program develop and does not form part of any contract.

Northern Battery Project

PSD Energy

location_on

SA Australia


Project Primary Contact
person_outline
Rodrigo Rech dos Santos
badge
Supply Chain Consultant
phone
+61 04 3568 9768
mail Send Email

SITE ESTABLISHMENT & SUPPORT SERVICES

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Licensed construction-phase security for the Northern Battery site, Port Paterson. Base service is one static guard on site nightly 7:00 pm to 6:00 am, with 24-hour cover on Sundays, public holidays and shutdowns; mobile patrols, alarm response and after-hours access control as required. Forecast service period from site mobilisation (currently scheduled January 2027) to approx. October 2028, priced on a schedule of rates. Includes option for remote-monitored CCTV / solar surveillance towers. Security licences under the Security and Investigation Industry Act 1995 (SA) required. Scope of Works PSD2424-SOW-SEC-001 will be issued to shortlisted respondents. (Register ref 03.010).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Accredited underground service locating (BYDA follow-up, EMI/GPR) and non-destructive vacuum excavation to pothole and confirm existing services prior to each excavation package (trenching, foundations, fencing). First works January-February 2027, then call-off through 2027. (Register ref 01.010).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Supply, delivery, installation, servicing and removal of temporary construction facilities for approx. 20 months from January 2027: site office complex (approx. 12 m x 9 m with boardroom and kitchen), client and equipment-supplier portable offices, crib/lunch rooms, ablution blocks, first aid room, drying/change room and shelters, 20 ft containers and container dome shelters, bunded dangerous goods store, temporary compound fencing, rumble grid / wheel-wash bay, water tanks, furniture and appliances. Facilities sized for a peak workforce of approx. 50 PSD Energy personnel plus subcontractors. (Register refs 02.003-02.013, 02.015, 02.017, 02.019, 03.005).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Hire, delivery, fuelling/servicing and removal of temporary power for the construction compound and work fronts: main site generator (hybrid/solar-battery options welcomed), construction switchboards, distribution boards and leads compliant with AS/NZS 3012, lighting towers and small generators. Period approx. January 2027 until permanent supply is available. Electrical work by licensed electrical contractors only. (Register refs 03.002, 03.003, 04.009).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Licensed waste collection, transport and recycling for the construction phase: segregated bins (general, steel, timber, cardboard, plastics, copper/aluminium cable offcuts), removal of battery and equipment packaging and dunnage during BESS installation (approx. Mar-Dec 2027), and final site clean-up. EPA (SA) licensing for waste transport and disposal required; waste tracking and recycling reporting to support the project Construction Environmental Management Plan. (Register refs 02.021, 02.022, 30.004).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Licensed waste collection, transport and recycling for the construction phase: segregated bins (general, steel, timber, cardboard, plastics, copper/aluminium cable offcuts), removal of battery and equipment packaging and dunnage during BESS installation (approx. Mar-Dec 2027), and final site clean-up. EPA (SA) licensing for waste transport and disposal required; waste tracking and recycling reporting to support the project Construction Environmental Management Plan. (Register refs 02.021, 02.022, 30.004).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Supply of bulk diesel to site for construction plant and generators, including provision of a self-bunded fuel tank (bunded to EPA requirements), scheduled deliveries, fuel management/reporting, and initial fill of the permanent diesel generator at handover. Period January 2027 to project completion. (Register refs 03.012, 19.004).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Traffic management for the Augusta Highway / Northern Power Station Road access, including traffic guidance schemes, traffic controllers, and escort/control for oversize deliveries (BESS containers, inverter skids, transformers and buildings), predominantly March-August 2027 with ad hoc requirements through to 2028. Work to Department for Infrastructure and Transport (DIT) requirements by accredited personnel. (Register ref 03.024).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Accommodation and associated meal/catering services for non-local construction personnel in Port Augusta and surrounds from January 2027 to mid-2028, peaking mid to late 2027; room numbers will be confirmed as the program and workforce plan develop. Motels, serviced apartments, cabins and caravan parks invited, as are catering providers for site crib or meal packages. (Register ref 32.006).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Registered/licensed surveying services: establishment of survey control (MGA2020 Zone 53), construction set-out for foundations, trenches, cable routes, drainage and buildings, pre-construction erosion/scour survey, progress quantity surveys, and as-constructed survey and drawings. January 2027 to early 2028. (Register refs 05.003, 06.001, 06.003).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

NATA-accredited testing services from January 2027: earthworks and pavement compaction testing, imported fill / road base / bedding sand and thermal backfill conformance testing, soil thermal resistivity testing along cable routes, and concrete testing (slump, cylinders 7/28 day). Field technicians available at short notice in the Port Augusta region preferred. (Register refs 06.005, 06.007, 06.008, 06.009).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Environmental services supporting the CEMP and EPA licence conditions: dust monitoring equipment and reporting, NATA laboratory stormwater / water-quality sampling and analysis, construction noise monitoring (if triggered), fauna spotter/catcher during clearing, weed control along disturbed areas and stockpiles, and environmental consultant / licensed disposal support for any unexpected finds (e.g. contaminated material). March 2027 to project completion. (Register refs 05.004, 05.006, 05.007, 05.009, 05.010, 05.012).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Supply of PPE and site consumables (gloves, glasses, hi-vis, sunscreen, drinking water/ice, first aid replenishment), spill kits, barricading, cones and bollards, star pickets and bunting, flammable liquids cabinets, fire extinguishers and eyewash, ladders and access equipment, hand and power tools, and temporary and project information signage. Local suppliers able to deliver to site or offer account/collection in Port Augusta are encouraged. January 2027 to 2028. (Register refs 02.014, 02.016, 02.023, 02.024, 03.013, 03.015, 03.018, 03.022, 05.011, 26.003).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Manufacture, supply and delivery of precast concrete footings/plinths for the battery containers (Sungrow PowerTitan 2.0) and associated inverter / medium voltage skids (SC6900UD-MV) and control cabinets, to the IFC design and AS 3600. Order targeted January 2027, manufacture Jan-Apr 2027, staged delivery to site from approx. April 2027. Quantities (several hundred units) and design are indicative and subject to IFC drawings. (Schedule items PRO1350/PRO1360; register refs 11.008-11.010).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Supply of electrical bulk materials: HD UV-stable PVC conduit and fittings, cable cover slabs/strips and marker tape, bare copper earth conductor, earth rods, exothermic weld consumables and earth bars, insulated earth cable, LV power and multicore control cable, comms/instrumentation cable, cable ladder/tray and supports, glands, lugs and fixings. Main orders December 2026-January 2027 with staged delivery from April 2027. Products to comply with the relevant AS/NZS standards with test certificates. (Register refs 10.005-10.007, 12.002-12.005, 20.001-20.007, 21.004).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Wet hire of mobile cranes for placement of the battery containers and associated inverter skids onto foundations (crane size to the lift study, indicatively 200 t class plus support cranes), together with Franna / 25-60 t mobile cranes for general lifting, certified riggers/dogmen and lifting gear (spreader beams, slings, shackles). BESS deliveries are scheduled approx. March-August 2027 with general lifting through to early 2028. (Register refs 04.011, 04.012, 04.013).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Registered Training Organisation services for mandatory high-risk work licences, tickets and verification of competency (e.g. EWP, telehandler, working at heights, confined space, LVR/CPR, first aid), delivered in Port Augusta or the Spencer Gulf region where possible, from January 2027. (Register ref 01.016)

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Supply and erection of a permanent O&M shed with work slab and full-length awning, to the IFC design, NCC and AS/NZS 1170 wind loading for the site (coastal, Port Augusta region), including shop drawings, engineering certification, roller and personnel doors, and coordination with PSD Energy for building services. Concrete slab supply and construction may be included or provided by PSD Energy; this will be confirmed at RFQ. Approx. October 2027-January 2028. Building certification documentation required. Regional shed manufacturers and erectors are encouraged to register. (Register ref 22.006).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

CIVIL, MATERIALS & PLANT PACKAGES

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Fabrication and hot-dip galvanising (AS/NZS 4680) of miscellaneous steelwork: cable bridges and supports, platforms, stairs and handrails, bollards and equipment supports, to IFC drawings. Approx. June-October 2027. Regional fabricators encouraged. (Register ref 11.017).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Supply and installation of permanent perimeter security fencing (AS 1725, 2.1 m chain-link with barbed wire), vehicle and pedestrian gates including motorised gate, fence earthing, access control (Gallagher preferred by the Principal), CCTV (perimeter, gate LPR, building cameras, poles and NVR), intruder alarms, master-keyed locking and security network hardware. Supply orders from early 2027; installation approx. October 2027-January 2028. (Register refs 12.007, 24.001-24.007).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Supply agreement for ready-mix concrete (N32/N40 and other classes per IFC design) from a Port Augusta / regional batching plant, concrete pump hire, cut-and-bent reinforcement and bar chairs, formwork hire/purchase, cast-in items (hold-down bolts, templates) and concrete consumables (curing compound, grout, waterstops). Peak demand approx. May-October 2027. (Register refs 11.001-11.006)

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Supply and delivery of quarry materials to specification: 20 mm washed aggregate / yardstone for BESS area surface topping, road base and geofabric for crane pads and turning areas, clean bedding sand and thermally stable backfill for cable trenches, select fill, and car park road base. Deliveries approx. March 2027 to January 2028. Material test certificates (NATA) required. (Register refs 02.002, 07.013, 07.017, 10.003, 10.004, 22.005).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Civil construction of stormwater and drainage works: detention / sediment basin (excavation, batters, spillway and outlet), swales, V-drains and catch drains with rock armour / erosion matting, road crossing culverts and headwalls, stormwater pits and pipework, and an HDPE-lined fire water retention pond with an isolatable outlet, safety fencing and signage; plus perimeter fire break / asset protection zone works. Approx. May-September 2027. Specialist HDPE liner installers are invited to register for partial scope. Design is being finalised. (Register refs 08.002-08.008, 23.008).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Supply of precast and pipe products: self-draining precast cable, comms and earthing pits and lids, stormwater pits and grates, RCP / box culverts and precast headwalls, PVC/RCP stormwater pipe. Deliveries approx. May-July 2027. Products to AS/NZS 4058 / AS 3996 and IFC design as applicable. (Register refs 08.004, 08.005, 10.010).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Hire of construction plant and equipment to supplement PSD Energys own fleet, approx. April 2027 to mid-2028: water cart, grader (periodic wet hire for internal road maintenance), elevated work platforms (scissor and boom lifts), trench shoring boxes, cable pulling equipment (winches, drum trailers, rollers), gas detectors / confined space kits, light vehicles and other plant as required. Plant to be maintained, registered and supplied with current service records and pre-start documentation. (Register refs 03.023, 04.001, 04.006, 04.010, 04.014, 07.015, 10.002).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Supply of labour hire personnel (e.g. civil labourers, plant operators, concreters, formworkers, steel fixers, trade assistants, electricians) and local recruitment / employment services to support local and First Nations participation, approx. May 2027 to 2028. Providers must hold a current licence under the Labour Hire Licensing Act 2017 (SA) and employ, direct and pay their workers in accordance with the applicable modern award or registered enterprise agreement. Engagement is subject to PSD Energys standard procurement and resourcing processes. (Register ref 32.007).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Supply of 33 kV XLPE single-core cable, 33 kV terminations and joint kits, trefoil cleats, link boxes and bonding leads, and DC power cable (ESC to inverter skid) with bi-metallic/tinned lugs, to the IFC cable schedules and AS/NZS 1429.1 / AS/NZS 5000 series. Long-lead items: orders targeted early 2027 for delivery to site from mid-2027. Type test reports and factory test certificates required. (Register refs 14.001, 14.002, 15.001-15.005, 15.008).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Supply, installation and commissioning of site fire services: fire water tanks (AS 2304), fire pump set, hydrant ring main and hydrants, hose reels, portable extinguishers and signage, and site Fire Indicator Panel (AS 4428) integrating the BESS fire systems; commissioning with SA Country Fire Service (CFS). Approx. 2027 with commissioning early 2028. Scope and design basis are being finalised and may change. (Register refs 23.001-23.007, 27.006).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

FINISHING PACKAGES

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Supply of hinged/lowerable light poles and footings, downcast LED floodlights with minimal light spill, lighting controls, outdoor IP-rated GPOs and enclosures, and an EV charger, approx. October-December 2027. (Register refs 19.005, 19.006, 25.002-25.004).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Topsoil respread, hydroseeding / hydromulch, mulching and landscape screen planting in accordance with the approved landscaping plan and development approval, including establishment maintenance to achieve stabilisation. Approx. October 2027 to mid-2028. Local nurseries and First Nations land management businesses are encouraged to register. (Register ref 30.003).

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

GENERAL EXPRESSIONS OF INTEREST

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Register your interest in supplying goods and services to the Northern Battery Project at Port Paterson, near Port Augusta. PSD Energy is the EPC contractor for project owner AMPYR. Specific work packages are listed separately on this project page. Please register against any that match your capability. Use this general expression of interest if your capability doesnt fit a listed package, or if youd like to be considered for other opportunities as the project progresses. If you responded to the earlier general expression of interest, please complete this one as well. PSD Energy is now the EPC contractor and uses a different questionnaire.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

This expression of interest is closed. PSD Energy is now the EPC contractor for the Northern Battery Project and is collecting supplier registrations through a new General Expression of Interest on this project page. Please register there, and against any listed work packages that match your capability.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
Loading...