BIELBY HOLDINGS PTY. LTD.

New England Highway - Muswellbrook Bypass Project - Tender - Bielby/Ferrovial JV

Overview

Ferrovial Construction & Bielby Holdings are partnering for the upcoming New England Highway - Muswellbrook Bypass Project in regional New South Wales which is funded by the Federal Government and State Government (TfNSW). Ferrovial Construction and Bielby Holdings are well established civil infrastructure contractors with over 40+ years of experience in both regional and metropolitan areas. They adopt collaborative work approaches with project participants to achieve exceptional project outcomes for clients and the wider community.

The Project

The Muswellbrook Bypass Project includes the investigation, design, construction, testing and commissioning of a 9.3km new dual lane carriageway (one lane each direction) bypassing Muswellbrook through the East from Milpera Dr South to Koolbury Flats in the North. The goals of the Muswellbrook Bypass Project are to improve road safety by separating heavy vehicles from local traffic, reduce congestion within Muswellbrook, and enhance freight efficiency along a critical regional corridor. The project also aims to improve travel time reliability, support future traffic growth, boost regional economic activity, and enhance community amenity by reducing noise, pollution, and traffic impacts in the town centre.

Key Scope of the project include the construction of:
- New full depth flexible pavement along new carriageway
- Several bridge structures over live road and rail corridors
- Single major earth cut and mass haul to fill locations along the alignment.
- North, south and central interchanges
- Drainage pipe and culvert installation
- Contamination treatment and management
- Utility service relocation and installation


The project is currently in the procurement/bid stage with contract award expected late Q4 2026. Procurement will be undertaken progressively through a series of work packages. Opportunities are expected to include site compound establishment, earthworks, ground stabilisations, landscaping, plant and equipment hire, quarry supply, steel reinforcements, fencing, stormwater installation, labour hire, FRP, environmental services, utility installations. All suppliers must meet relevant safety, environmental and quality requirements, along with any applicable government and project-specific standards.
Interested suppliers and contractors are strongly encouraged to register expressions of interest via the ICN Gateway. Following registration, short-listed companies may be contacted directly by the project team as procurement progresses. Further work package details will be released in stages.

More information you may find here

How to register an Expression of Interest (EOI) for this project

Work packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to the 'EOI User Guide' below for instructions and assistance to submit an EOI.

- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.

ICN Gateway Company Registration

- Click here to register your company profile on ICN Gateway.

- Support and assistance are available through the document 'Creating an ICN Gateway Company Profile' below.

- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

New England Highway - Muswellbrook Bypass Project - Tender - Bielby/Ferrovial JV

BIELBY HOLDINGS PTY. LTD.

location_on

NSW Australia


Project Primary Contact
person_outline
Dusko Bajic
badge
Industry Manager
phone
+61 4 1732 3636
mail Send Email
Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login

Baseline and construction noise and vibration monitoring, compliance assessment and reporting.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply and installation of temporary and permanent pavement markings and raised pavement markers

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Independent proof engineering, technical review and certification of nominated permanent works designs.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Design, documentation and certification of temporary works required to support construction activities.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Independent checking and verification of nominated permanent and temporary works designs.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply, erection, inspection, modification and dismantling of compliant access scaffolding.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply and hire of proprietary shoring, formwork, falsework, propping and temporary support systems.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Planning and implementation of temporary traffic management, including traffic control devices and personnel.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Heritage and archaeological inspections, monitoring and reporting during works in identified sensitive areas.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Pre-clearance surveys, fauna handling and relocation, and ecological monitoring during construction.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply and delivery of lime, cement and other stabilising binders for earthworks and pavement construction.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

CCTV inspection, condition assessment and structural lining or rehabilitation of existing drainage pipes and culverts.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Small Crane hire for everyday site use.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply, erection, inspection, modification and dismantling of compliant access and working-platform scaffolding.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Design, manufacture, supply and installation of bridge bearings and expansion joint systems, including associated components and technical documentation.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply and delivery of bulk diesel and other required fuels, including storage, dispensing, usage monitoring and reporting.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Manufacture, supply and delivery of precast concrete fascia panels and parapet units, including associated fixings and quality documentation.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply, establishment and operation of pugmill plant, including the supply, storage and controlled dosing of stabilising binders.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Manufacture, supply and delivery of precast or prestressed concrete bridge girders, including transport, handling requirements and quality documentation.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Surface preparation and application of protective paint systems and anti-graffiti coatings to nominated structures and assets.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Horizontal directional drilling underbores for the installation of utility conduits and pipelines.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Telstra-accredited civil works, including excavation, conduit installation, pit construction, service adjustments and reinstatement.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Identification, removal, transport and lawful disposal of asbestos-containing materials by appropriately licensed contractors.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Design, supply, installation, inspection and removal of temporary falsework systems supporting permanent structures during construction.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Design, manufacture, supply and delivery of reinforced soil wall components, including facing panels, soil reinforcement and connections.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Installation of reinforced soil wall systems, including facing units, reinforcement placement, jointing and coordination with backfilling works.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Transport and delivery of precast concrete bridge girders, including route planning, permits, escorts and specialised lifting or transport equipment.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply, transport and delivery of potable water for construction activities, site facilities and workforce consumption.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Design, supply and hire of shoring, propping and temporary support systems required for excavations and structural works.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Detail design, fabrication, supply and installation of minor structural steelwork, including handrails, barriers and anti-throw screens.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Construction of concrete road pavements and roundabouts, including formwork, reinforcement, concrete placement, finishing, joints and curing.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Telstra-accredited civil works, including excavation, conduit installation, pit construction, service adjustments and reinstatement.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Bulk earth moving and placing. Compaction. Screening.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Non-Destructive digging - Wet hire

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Concrete pump wet hire

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

General labour hire

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Fabrication and Installation of Steel Twin Rail & Safety screen

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply of Comms and Electrical conduits, stormwater pipes

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply of specification compliant select fill and aggregates

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply, install and maintenance of landscaping as per project specifications and drawings

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply of steel reinforcements for Bridges and other structures

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Placement of silt fencing, fabrics,

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Placement of concrete kerbs & gutters, and slipform barriers

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply and install of security and designed fencing

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply and install of Safety barrier systems

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply and installation of permanent signs.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Movment and placement of bulk earth materials for embankments, pavement layers, structure backfill.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Clearing of trees, shrubs. Topsoil screening & mulching

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Major Cut in rock requiring crushing and screening to be used as select fill in across the length of the project

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Pre-construction and post construction assessments of surrounding land

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Construction Survey

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Excavation and installation of RCP and box culverts. Excavation and placement of subsoil and interface drainage

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Elecrical work for long term construction accomodation substation. Work packages for LV and HV installations

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Daily Cleaning of site accomodation buildings & Supply of office compound consumables - cleaners will need to be background checked.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Site Compound security alarm system - Back to base monitoring - alarm response patrol officer

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply and install of Traffic Signals, ITS and street lighting

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Demolition of existing buildings and infrastructure. Disposal of demoltion waste

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply and delivery of potable water, Disposal of wastewater sewage

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Loading...