HAMR ENERGY PTY LTD

Project Shearwater making SAF (Sustainable Aviation Fuel) in Adelaide

Overview

HAMR Energy is an Australian developer of projects that produce low carbon liquid fuels. Started in 2021 HAMR Energy has a mission to make low carbon liquid fuels to decarbonise transportation in Australia.

Project Shearwater is a large-scale development that utilises residual biomass from forestry plantations in Green Triangle forestry region of Victoria and South Australia and creates sustainable aviation fuel (SAF). This fuel is a vital step in the decarbonisation of air travel, and Project Shearwater is intended to produce over 140,000 million litres per year of SAF.

The project will include core elements of processing equipment:

- Pre-treatment and feedstock preparation facilities
- Gasifier
- Gas cleaning
- Hydrogen electrolysis
- Methanol catalysis
- SAF production
- On site utilities
- Logistics facilities for transportation of feedstocks and products

In addition, the Project Shearwater site development will include civil engineering and drainage works, and a dedicated high voltage electrical connection to the South Australian power network.

For further details please visit www.hamrenergy.com

Project Shearwater making SAF (Sustainable Aviation Fuel) in Adelaide

HAMR ENERGY PTY LTD

location_on

SA Australia


Project Primary Contact
person_outline
Alex Vojdani
badge
Supply Chain Manager
phone
+61 04 4727 7175
mail Send Email

Registration of Interest (ROI)

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login

Requirements for Participation in Registration of Interest (RoI): The EoI request will include the following mandatory criteria that applicants will be required to satisfy. Registration of interest is requested from participants who will be able to demonstrate compliance with these mandatory criteria. 1- Hold, or able to hold, a South Australia Building Work Contractors Licence 2- Management systems that ensure compliance with the Commonwealth Fair Work Act and Industrial Relations legislation 3- Able to demonstrate compliance with the National Construction Code 4- Applicant includes an entity that has delivered a petro-chemical or comparable facility with a contract value of at least $1bn in the last 10 years 5- Applicant includes an entity that can demonstrate it has successfully contributed to a FEED study for a project with a capital cost of at least $1bn in the last 10 years 6- Applicant includes an entity that can demonstrate it has successfully delivered a petro-chemical or comparable facility in Australia in the last 10 years including demonstration of experience of project delivery in the context of Australian regulatory, planning and industrial relations environment. HAMR Energy will require that a party invited to participate in the EoI phase execute a Confidentiality Agreement prior to receiving the EoI documents. For further details please download and read the Related Documents under this work package.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Loading...