SANTOS LTD

Moomba Central Optimisation Project

Overview


The Moomba Central Optimisation (MCO) Project is a major infrastructure development located in the Cooper Basin, South Australia. The project is being delivered by Santos Ltd to modernise and optimise upstream gas operations through consolidation of compression infrastructure and electrification of key facilities.

The project involves the rationalisation of existing compression across multiple satellite facilities into a new Central Fields Satellite (CFS), supported by the installation of new electric motor-driven compression at the Moomba Gas Plant (Moomba Plant Inlet Compression, MPIC). To supply the increased electrical demand associated with electrified compression, the project includes construction of a new gas-fired power generation facility (Moomba Power Station) with a nominal capacity of approximately 45-50 MW.

The Moomba Power Station will operate as an islanded, behind-the-meter facility supplying electricity via a high-voltage distribution network, including overhead transmission lines and associated electrical infrastructure, to both the CFS and MPIC facilities. The design includes provision for future expansion and integration of renewable energy sources.

In addition to the core facilities, the project scope includes:


  • Installation of high-voltage electrical infrastructure, including switchrooms, transformers, and overhead lines

  • Construction of pipelines and associated tie-ins to integrate existing field infrastructure

  • Brownfield modifications to existing satellite facilities to enable decommissioning or bypass of legacy compression systems

  • Supporting infrastructure including utilities, control systems, and site development works

The project is located within an existing hydrocarbon production area and will leverage established infrastructure, access corridors, and operational facilities. Execution will involve a combination of greenfield construction and brownfield integration works.

The MCO Project is intended to deliver improved operational reliability, reduced operating and sustaining capital costs, and enable future development of gas resources within the Cooper Basin. It also supports emissions reduction objectives through improved energy efficiency and provision for future renewable integration.


Moomba Central Optimisation Project

SANTOS LTD

location_on

SA Australia


Project Primary Contact
person_outline
Rodrigo Rech dos Santos
badge
Supply Chain Consultant
phone
+61 04 3568 9768
mail Send Email

General / Other

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Express your interest in any current or future opportunities that may arise in connection with this project.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Construction

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Provision of civil works, including: o Sealed road construction o Bulk earthworks o Piling construction

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Provision of facility construction services, including: o Structural Mechanical Piping Electrical and Instrumentation

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Provision of pipeline construction services.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Provision of temporary camp accommodation.

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Materials

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Provision of fabrication services, including: o Pipe Rack Modules o Pipe spools o Structural steel for power station engine hall o Pipe and fittings o Pressure vessels (Quick Opening Enclosures) o Packaged process skids (GPRS Skid)

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Provision of valve supply, including: o Shutdown valves o Pressure safety valves o Manual valves o Actuated valves

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login
If you do not have a business profile, you can
create one to get started

Provision of Electrical and Instrumentation equipment, including: o Controls Systems (PLC configuration and SCADA equipment) o Balance of plant Instrumentation o Switch rooms o Electrical bulks o Overhead powerline equipment o Pipeline pig signalers o Pipeline Monolithic Isolating Joints