Beach Energy is a key supplier to Australia's East Coast domestic gas market producing domestic gas through existing infrastructure in the Otway Basin, offshore Victoria, providing critical energy resources for Australia.
Within the Otway Basin, Beach extracts natural gas and hydrocarbon liquids from the Thylacine field via the Thylacine A offshore platform, transporting it to shore to the Otway Gas Plant (OGP) near Port Campbell in Victoria. The Thylacine Platform is connected to the OGP via the Otway Gas Production Pipeline (OGPP) which comprises a 70km offshore and a 11km onshore section.
In close proximity to the current producing assets, there are a number of smaller discovered gas fields. The Otway Offshore Phase 6 Project initiates a strategy to develop the currently stranded gas reserves through utilisation of the existing offshore infrastructure.
The Project includes the facilities installation activities to tie-back the successful Equinox Drilling Campaign wells, including Artisan and La Bella, to the existing OGPP. The Project includes: detailed design and engineering; installation and connection to the existing infrastructure; and brownfields activities, to facilitate production through the OGP.
ABOUT BEACH ENERGY
Beach Energy is an ASX listed, oil and gas exploration and production company headquartered in Adelaide, South Australia.
Beach's purpose to 'sustainably deliver energy for communities' means we operate while maintaining the highest health, safety and environmental standards.
Founded in 1961, Beach today has oil and gas production in five basins across Australia and New Zealand.
Beach Energy is a key supplier to Australia's East Coast gas market, suppling approximately 12% of the gas on the East Coast of Australia, and is aiming to grow this further.
All of the gas Beach produces on the East Coast of Australia is sold to retailers within Australia.
PROJECT TIMEFRAMES
The Project is subject to approval by Beach's Board and associated Joint Venture Partners. The main offshore execution campaign is scheduled to commence 2H CY2028 with first gas expected by mid CY2029. There is the possibility of an earlier Saturation Diving Campaign scheduled to commence in 2H CY2027.
PROJECT EXPRESSIONS OF INTEREST
The project will be calling for expressions of interest from AS/NZS ISO 9001 certified (or equivalent) Australian suppliers and service providers through the ICN Gateway.
HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)
ICN GATEWAY COMPANY REGISTRATION