Arrow Energy operates four gas fields in Queensland's Surat basin.

Surat Basin

Arrow Energy has operated in the Surat Basin for more than 15 years. It is now the site of the new Surat Gas Project (SGP).

The SGP is underpinned by a December 2017 deal with the Shell QGC-operated joint venture. This deal has allowed Arrow to take advantage of existing QGC-operated infrastructure to reduce our impacts on landholders and communities.

Following our Shareholders' investment announcement, Arrow sanctioned the first phase of the SGP in April 2020.

Phase one includes more than 600 wells to be drilled from 2020, focusing on an expansion between Arrow's current operational areas at Daandine and Tipton.

This initial phase included construction of Inlet Processing Facilities (IPFs) at Shell-QGC operated David and Harry Field Compression Stations.

IPFs enable Arrow to supply gas from its operational fields under the gas sales agreement.

Arrow will continue to use its existing gas compression facilities at Daandine and Tipton, with upgrades to the Tipton Central Gas Processing Facility.

Phase one also include upgrades and connection to water treatment facilities.

In addition to using Arrow's existing water treatment facilities which will be improved through upgrades to Arrow's Tipton and Daandine Water Treatment Plants, Arrow will send water to the Shell-QGC operated Kenya Water Treatment facility.

Two new brine storage ponds were constructed at the facility to support water treatment for beneficial use.

Phase one is now in the final stages of completion with Phase two scheduled to begin in 2024 pending final shareholder investment decision.

Phase two development will expand into new gas fields in the northern section of Arrow's tenure north-east of Miles.


Construction is scheduled to commence from late 2024, and will bring an additional 130TJ/day of gas to market over 27 years, and will include but is not limited to:

  • Approximately 250 new gas wells around the Miles region including gathering network.
  • Construction of a new Field Compression Station (FCS) and a Steel Export Pipeline.
  • Construction of a Metering & Flare Package at the existing Shell-QGC operated McNulty FCS.
  • Construction of a new Hybrid Power Station under an Independent Power Producer Agreement.


Subsequent phases

Arrow's future plans include:

  • Additional wells and associated gathering to expand across Arrow's Surat tenure areas
  • construction of another new Field Compression Station at Lynwood, south of Arrow's Tipton development
  • construction of another Inlet Processing Facility (IPFs) at the Shell-QGC operated Jammat FCS.

More information is available from www.arrowenergy.com.au

Arrow Energy

ARROW ENERGY Pty Ltd

location_on

QLD Australia


Project Primary Contact
person_outline
Deepak Urmode
phone
+61 07 3364 0670
mail Send Email

Work-Packages

Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login

Arrow Energy is seeking expressions of interest from suitably qualified and experienced service providers for provision of CWI Rigs for well activities in the Surat Basin.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Arrow Energy (the Company) is expanding its existing gas production operations in the Surat Basin. Gas produced from the Coal Seam Gas (CSG) fields is routed to the Jammat IPF through Low-Pressure Header (LPH) before being exported to the existing Jammat Field Compression Station (FCS). The works will be Greenfield works on Company property. This Scope of Work (SOW) is under development for the Jammat IPF. The information below generally describes the Scope for the purposes of the EOI. It covers the activities of procurement, fabrication, transport, construction, pre-commissioning and commissioning support. Contractors are encouraged to submit an EOI for either civil only, construction only or all portions of work; both civil and construction. The works are inclusive of the following work areas: . Civil, earthworks, piling, fencing/gates . Underground Services that include installation of large diameter HDPE slugcatcher and large bore piping, electrical conduits, etc. . Gas System covering a vertical flare, plant inlet scrubber, large bore steel piping, etc. . Utility Systems covering Instrument and Utility Air system, Water Transfer Skid, Electrical Equipment Room & Plant Automation System, small Power Generation (Diesel & Gas), Fire & Gas Detection, Lighting and CCTV. Engineering Design will be delivered by third party. Bulk material procurement shall be done by the Contractor whilst Arrow shall free issue select Long Lead Items (Equipment).

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Arrow is seeking expressions of interest for the provision of Bog Mat Handling and Management Services under a Master Services Agreement. The Bog Mat Handling and Management Scope of Work under the Master Services Agreement includes, but is not limited to, the below: . Handling, transportation, placing, cleaning and the general management of Arrow Energys owned Bog Mats for projects within the Surat Region (Dura-Base Heavy Duty Composite Mats: Weight 454kgs; dimensions- 4270mm x 2440mm x 105mm) . Operate and maintain Arrows owned Bogmat washing machine. . Ensure all Works are performed strictly in accordance with site environmental policies and relevant legalisation, and requirements stipulated in all Access and Approvals Packages.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Arrow is seeking expressions of interest for the design and supply of Girrahween Inlet Filters, including provision of Start-up Support Services. The Scope of Work (Scope) is under development and this document generally describes the interim Scope for the purposes of this request. The Scope may be refined prior to or after release of the RFP documentation. The Scope of Works includes the design and supply of two (2) steel Inlet Filters (pressure vessels) for the Field Compression Station (FCS) of 116MMSCFD capacity. In addition to the above, the selected Vendor/Contractor may be required to provide On Site Start-up Support Services to Arrow Energy.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Arrow is seeking expressions of interest for the design and supply of Girrahween Manual Valves, including provision of Start-up Support Services. The Scope of Work (Scope) is under development and this document generally describes the interim Scope for the purposes of this request. The Scope may be refined prior to or after release of the RFP documentation. The Scope of Works includes supply of Manual Valves package comprising of sizes DN80 and above manual valves. Refer to the attached Manual Valve MTO issued with this EOI document (ref. SCAN01-ARW-MEC-MTO-00001).

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Arrow is seeking expressions of interest for the design and supply of Girrahween Balance of Plant Instrumentation, including provision of Start-up Support Services. The Scope of Work (Scope) is under development and this document generally describes the interim Scope for the purposes of this request. The Scope may be refined prior to or after release of the RFP documentation. The Scope of Works includes design and supply of Balance of Plant Instrumentation package including the following: . Level instruments . Flow instruments . Pressure instruments . Temperature instruments . Fire / Gas detection instruments . Mechanical analog instruments . Estimated 250 devices. In addition to the above, the selected Vendor/Contractor may be required to provide On Site Start-up Support Services to Arrow Energy.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Arrow is seeking expressions of interest for the design and supply of Girrahween Lube Oil Coalescer, including provision of Start-up Support Services. The Scope of Work (Scope) is under development and this document generally describes the interim Scope for the purposes of this request. The Scope may be refined prior to or after release of the RFP documentation. The Scope of Works includes the design and supply of one (1) Lube Oil Coalescer package (Skid) (designed to Not Normally Manned concept) for the Field Compression Station (FCS) of 116MMSCFD capacity. In addition to the above, the selected Vendor/Contractor may be required to provide On Site Start-up Support Services to Arrow Energy.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Arrow is seeking expressions of interest for the Supply of Lubricants and Coolants under a Goods and Services agreement model.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Arrow is seeking expressions of interest for the Asset Management Support Services under a Professional Service Agreement.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Arrow is seeking expressions of interest for the Project Controls and Services scope under a Professional Services Agreement (PSA). Arrow Energy seeks qualified vendors to provide a functioning Project Controls System (Rules, Tools & People) required for delivery of the Surat Gas Project (SGP). This project requires the supplier to have an existing Project Controls system and capacity that can be integrated into the Arrow Project Management System.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Arrow Energy is seeking expressions of interest for the Operate and Maintain Field Telecoms Network under an MSA.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Arrow is seeking expressions of interest for the Commissioning Resource Service under a Model Contract Template (MC-06, Maintenance Agreement). The scope of work consists of the contractor providing technical resources and services to support execution of commissioning and start-up activities on the company's suite of wellfield development and facility projects including; a) Perform technical testing of gas and produced water pipelines, including valves, water offtakes, Future Service Connections (FSC), High Point Vents (HPVs), and Low Point Drains (LPDs); b) Pre-commissioning and commissioning of LPDs; c) Assist with purging of gathering systems with hydrocarbons; d) Pre-commissioning wellsites; e) Commissioning of wellsites; f) Pre-commissioning and commissioning of ground monitoring bores g) Pre-commissioning and commissioning of gathering metering skids; h) Commissioning of water pumping stations and storage tanks/dams; i) Commissioning of Telecommunications towers and equipment rooms j) Pre-commissioning and commissioning gathering field flare systems; k) Commissioning of High Voltage (HV) reticulation systems; l) Support of resourcing for Brownfield Operations tasks (i.e. Operating well modifications, trials/data acquisition, modifications of Operational facility asset scopes, etc). Required resourcing will be multiple Mechanical, Electrical and Instrumentation technician roles on a continuous roster of 15 on / 13 off and a single Technical Clerk role, site based (Dalby) on a 5 and 2 roster Required support equipment / plant will be technician tooling to complete commissioning services, light vehicles to Safer Together standards for technicians, 5 Tonne telehandler and 3 Tonne Light Rigid Truck and other subsequent short-term engagement of required equipment (Franna crane, flat bed heavy rigid trucks, air / nitrogen compressor and generation packages, etc) All pre-commissioning and commissioning support will be completed utilising company's Permit to Work systems