SEYMOUR WHYTE CONSTRUCTIONS PTY LTD

M5 Westbound Traffic Upgrade

Overview

M5 Westbound Upgrade

The M5 Westbound Traffic Upgrade (between Moorebank Avenue and the Hume Highway) is a $380 million project jointly funded by the NSW and Federal governments. Seymour Whyte was awarded the design and construct contract for this 1.3 km upgrade, which includes a new three-lane bridge over the Georges River, with construction beginning in early 2026 and completion expected by late 2028.

The M5 Westbound Traffic Upgrade is a significant infrastructure project aimed at improving traffic flow and connectivity in the region.

This project involves the construction of key components designed to enhance the efficiency and safety of the M5 Motorway and its surrounding areas. By addressing critical bottlenecks and upgrading essential infrastructure, the project will provide a smoother and more reliable travel experience for commuters and freight transport.

Project Key Components

New Bridge Construction: A new three lane bridge over the Georges River and the Southern Sydney Freight Line, T2 and T5 railway lines, improving the connections between the M5 Motorway, Moorebank Avenue and the Hume Highway.

Entry Ramp Improvements: Addition of a new entry ramp to the Hume Highway and Modification of Existing M5 Entry and Exit Ramps.

Intersection Upgrade: Enhancement of the signalised intersection at Moorebank Avenue.

Shared User Path Upgrade: Improvement of the shared user path between Moorebank Avenue and the Hume Highway.

ICN Gateway Company Registration

Your ICN Gateway company profile and any registrations of interest you submit are used to assess your organisation's ability to complete projects.

Click here to create a new company profile or to login to your existing company profile. Please ensure your business invests the time and energy required to represent itself in the most effective manner possible when completing and/or updating your company profile.

Seymour Whyte strongly encourages suppliers to contact ICN in the first instance to gain an understanding of the EOI process and work packages, such as their ICN Gateway Profile Improvement Workshops.

Important Considerations

Incomplete registrations may not be considered.

Information on how to create a company profile and/or submit a registration of interest on Gateway by ICN is provided below refer to User Guides available in the 'Key Documents' section;

Gateway by ICN User Guide

Gateway by ICN EOI User Guide

Please review and complete the questionnaire from within the appropriate work package/s to be considered.

An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group, please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

It is important that businesses registering their interest are aware that their registration does not guarantee that they will progress further in any procurement.

Please organise a Business Visit with Raquel Bloom, Regional Manager - Greater Western Sydney M:+61 (0) 400 264 678 E: rbloom@icnnsw.org.au if you would like to discuss your Gateway profile upon registering your (EOI) submission.




M5 Westbound Traffic Upgrade

SEYMOUR WHYTE CONSTRUCTIONS PTY LTD

location_on

NSW Australia


Project Primary Contact
person_outline
Raquel Bloom
badge
Regional Manager - Western Sydney
phone
+61 04 0026 4678
mail Send Email
Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login

Supply and placement of Asphalt for permanent works

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply & installation of ITS pits, conduits and construct ITS footings

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Removal of existing and Construction and Testing of New Noise Walls

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply, delivery and commissioning of Traffic Signal Equipment

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply and delivery of electrical and comms pits

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply of luminaires and light fixtures for street lighting poles

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply and delivery of electrical and comms conduits

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Pile trimming works for piles ranging from 600dia through to 1200dia.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply and delivery of Bridge Bearings

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply and placement of reinforced concrete formwork

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

FRP works associated with the M5 Exit Bridge superstructure.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Installation of Kerb and Channel inc.supply of F-Type Crash Barriers

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply and delivery of Bridge Bearings

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Landscaping, hydroseeding, planting and vegetation

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply and Installation of Signage and Guide Posts

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Fabrication, supply and delivery of Signage structures

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Fabrication, supply and delivery of acoustic panels

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply, installation and termination of ITS cabling for CCTV Surveilance cameras and other devices

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply and delivery of Bridge Expansion Joints

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply and delivery of Precast Concrete Parapets

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply and delivery of Precast Concrete Fascia panels

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Fabrication, supply, delivery and installation of guard rails

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Supply and installation of Piling for Signage Structures

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Removal and reinstatement of existing plain concrete pavement slabs on M5 ramp including concrete testing

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
Loading...