Moorabool Battery will be located outside Geelong, directly adjacent to the Victorian Big Battery and Moorabool Terminal Station. The project will involve the delivery of a 300 MW / 1200 MWh battery. The battery is ideally located to unlock additional renewable energy hosting capacity in the Victorian power system.
The construction of the Battery will include the following:
HMC Capital's Energy Transition Platform, brings the experience, skills, and technical depth required to develop, own, and operate large-scale clean-energy assets across the National Electricity Market. The business has built a high-performing management team drawn from the renewable, grid, and investment sectors, combining proven delivery experience with the agility to execute complex, first-of-kind projects.
To learn more about the Moorabool Battery project, please visit https://mooraboolbattery.com.au/
HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)
ICN GATEWAY COMPANY REGISTRATION
VIC Australia
Construction schedule
Construction is anticipated to take 24 months and to commence late 2026.
Over that time, the main construction activities will include:
- Transport of construction personnel, associated heavy and light vehicles, and materials to and from the Subject Site on a day-to-day basis, dependent on construction schedule.
- Site establishment works including bulk earthworks and temporary construction compound.
- Road works to formalise internal site access road to accommodate heavy vehicles.
- Construction of Operations & Maintenance building, and delivery and installation of control room and switch rooms.
- Construction of project substations including installation of earthing grid, benching works, transformer bunding, installation of 33kV/220kV main transformers outdoor switchgear, HV busbar and support structure, overhead gantry structures, auxiliary transformer, harmonic filters, and reactive plant.
- Installation of underground 220kV transmission line to facilitate connection to the existing Moorabool substation to the east.
- Construction of hardstand, gravel all weather access road and sealed BESS internal roads and curbing.
- Installation of underground 33kV reticulation cabling, auxiliary transformers, battery enclosures, and inverter & transformer stations.
- Construction of ancillary works including parking areas, water tank, storage structures, stormwater management infrastructure, water containment infrastructure, and security lighting and fencing.
- Cold and hot commissioning of BESS and substation equipment.
- Removal of temporary construction facilities, and rehabilitation of disturbed areas following completion of construction of the Project.