Moorabool Battery will be located outside Geelong, directly adjacent to the Victorian Big Battery and Moorabool Terminal Station. The project will involve the delivery of a 300 MW / 1200 MWh battery. The battery is ideally located to unlock additional renewable energy hosting capacity in the Victorian power system.
The construction of the Battery will include the following:
- Installation of 300 MW of batteries stored in fully enclosed battery storage cabinets which are themselves housed within shipping or modular containers
- Installation of medium voltage (MV) switchrooms and a small operations and maintenance facility within the project area
- Onsite 220/33 kilovolt (kV) substation
- Installation of ancillary equipment including electrical inverters, transformers, benching, earthing, and cabling within the project area
- Installation of an underground transmission 220kV cable, traversing the electricity easement approximately 530 m to the Geelong-Ballan Road reserve. The cable will then run beneath Geelong-Ballan Road, connecting the Battery to the existing 220kV switchyard at the Moorabool Terminal Station (MTS).
- Installation of security fencing and lighting
- Creation of 8-meter-wide access (for construction and operation) adjacent to the existing access road, to the project area from Atkinsons Road in the north and internal access roads to the facility
- Earthworks and drainage, including a retention pond; and
- Temporary construction laydown area.
HMC Capital's Energy Transition Platform, brings the experience, skills, and technical depth required to develop, own, and operate large-scale clean-energy assets across the National Electricity Market. The business has built a high-performing management team drawn from the renewable, grid, and investment sectors, combining proven delivery experience with the agility to execute complex, first-of-kind projects.
To learn more about the Moorabool Battery project, please visit https://mooraboolbattery.com.au/
HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)
- To submit an EOI, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
- This is an initial, generic EOI submission only. All companies who submit an EOI will be included in information presented to companies who are short listed to bid for this Project.
- The services, programmes and initiatives provided by ICN Victoria are aimed at complementing a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.
ICN GATEWAY COMPANY REGISTRATION
- Click here to register your company profile on ICN Gateway.
- Support and assistance are available through the web links listed below.
- An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
- Companies should ensure that the email notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to Information & Updates, Major Projects and Regional Opportunities.
(1) ICN Gateway Setup Wizard
(2) ICN Gateway User Guide