NEOEN AUSTRALIA PTY. LTD.
GOYDER BATTERY PROJECT (GBESS)
Construction timeframes will be confirmed once contracting arrangements, grid-connection programs and final investment decision processes are completed. Subject to these milestones, overall construction is expected to span approximately 18-24 months, including mobilisation, civil works, electrical installation, commissioning and grid-compliance testing.
Supplier requirements may include compliance with Australian Standards applicable to high-voltage electrical infrastructure, battery system installation, fire and emergency management systems and hazardous material handling. Contractors may require suppliers to hold appropriate licences, registrations and insurances, including high-risk work licences, electrical worker registration, ISO-aligned quality, environmental and safety management systems (e.g., ISO 9001, 14001, 45001), and conformance with all site-specific induction and training requirements. Transport of oversized or heavy equipment may also require approvals and conditions issued by the Department for Infrastructure and Transport and relevant local councils.
Next steps for suppliers include registering an Expression of Interest via the ICN Gateway and ensuring capability statements, contact details and certifications are current. As procurement progresses, shortlisted contractors will use ICN Gateway to identify capable local suppliers for tendering opportunities. Further project updates and contracting packages will be released as development, investment and grid-connection activities advance.
Goyder Battery Stage 1 represents a major clean-energy infrastructure investment in South Australia and reinforces Neoen's commitment to long-term, sustainable renewable energy development. The project provides substantial opportunities for regional participation and aims to deliver enduring economic, environmental and community benefits for the Mid-North region.
About the project:
The Project has since been refined, and the focus is on progressing as follows:
The first standalone big battery is called Goyder Battery Stage 1 with a minimum capacity of 200 MW / 800 MWh. This is located adjacent to ElectraNet's Bundey Substation and is expected to commence construction in mid-2026.
NEOEN AUSTRALIA PTY. LTD.
SA Australia
Project Primary Contact
Work Packages
Support Services
Provision of ongoing maintenance services for temporary worker accommodation facilities.
Full Scope
Local accommodation and housing providers
Full Scope
Provision of catering services for construction workforce and site offices.
Full Scope
Bulk diesel supply for construction vehicles, generators, and machinery.
Full Scope
Inland Transportation and Traffic Management
Full Scope
Light Vehicle Hire
Full Scope
Laboratory and onsite testing of soils, concrete, aggregates, and construction materials.
Full Scope
PPE/Safety Equipment
Full Scope
Supply of security guards and security systems
Full Scope
Collection and disposal of wet and dry waste from site
Full Scope
Water supply and transport services for construction and workforce needs.
Full Scope
Civil Works
Civil works including roads, hardstands, drainage, foundations and associated site infrastructure.
Full Scope
Manufacture and supply of precast concrete culverts for drainage and watercourse crossings.
Full Scope
Supply of reinforcing steel products for concrete foundations and civil structures.
Full Scope
Supply, batching, and delivery of concrete for foundations and civil works.
Full Scope
Drilling and blasting services for excavation of rock
Full Scope
Provision of water carts and equipment for onsite dust control during civil works.
Full Scope
Hire and operation of heavy equipment for civil and electrical works.
Full Scope
Supply and installation of livestock fencing, or equivalent.
Full Scope
Labour and materials for formwork erection and steel fixing in foundation works.
Full Scope
Geotechnical drilling, soil testing, and surveying services to support design and construction.
Full Scope
Operations and Maintenance Facility Supply and Construction
Full Scope
Construction of permanent site entry roads, gates, signage, and O&M buildings.
Full Scope
Piling
Full Scope
Supply and installation of security fencing for compounds, substations, and site areas.
Full Scope
Civil construction of substation foundations, footings, drains, and associated works.
Full Scope
Supply and delivery of aggregates, gravels, ballast, and other construction materials.
Full Scope
Trenching for install of MV reticulation
Full Scope
Electrical Works
Specialist high-voltage cable jointing services for underground reticulation.
Full Scope
Supply of electrical cables suitable for HV, MV, and LV battery networks.
Full Scope
Wholesale supply of electrical components, cabling, fittings, and consumables.
Full Scope
Electrical works including cabling, switchgear, substations, and grid connection assets.
Full Scope
Skilled electrical/Technical labour
Full Scope
Supply and installation of fibre optic equipment
Full Scope
Overhead Powerline Construction
Full Scope
Electrical installation works for substations, including switchgear and wiring.
Full Scope
Mechanical Works
Provision of cranes and lifting equipment for heavy component handling.
Full Scope
Qualified crane operators to support lifting and installation activities.
Full Scope
Operators for excavators, graders, loaders, and other construction equipment.
Full Scope
Hire of general construction plant and machinery for civil and electrical works.
Full Scope
Other
This work package is for suppliers who may not fit into an existing category but can still provide valuable products or services for this project.