John Holland Pty Ltd
PARRAMATTA LIGHT RAIL - STAGE 2 ENABLING WORKS
location_onNSW Australia
Overview

Transport for NSW awarded the $322 million contract for the delivery of the Parramatta Light Rail - Stage Two Enabling Works package to John Holland.

These works include delivery of a 320-metre bridge over the Parramatta River between Wentworth Point and Melrose Park and bridge approaches on either side, totalling 1.3 kilometres. Parramatta Light Rail Stage 2 will connect Stage 1 and the Parramatta CBD to Sydney Olympic Park via Camellia, Rydalmere, Ermington, Melrose Park and Wentworth Point.

The new bridge will connect communities on the north and south of the river, and will feature an innovative, long-span cast in situ balanced cantilever design. The design means the bridge will only have two piers in the river, minimising disruption to boats and other waterway users and protecting the sensitive marine environment.

It marks the first major bridge crossing the Parramatta River since the Ryde Bridge was completed nearly 40 years ago. This work will also see upgrades to surrounding public spaces including Archer Park.

Bridge construction will commence towards the end of 2025 with a completion date of early 2028.

ICN GATEWAY COMPANY REGISTRATION

Your ICN Gateway company profile and any registrations of interest you submit are used to assess your organisation's ability to complete projects.

Click here to create a new company profile or to login to your existing company profile.

Please ensure your business invests the time and energy required to represent itself in the most effective manner possible when completing and/or updating your company profile.

John Holland strongly encourages suppliers to contact ICN in the first instance to gain an understanding of the EOI process and work packages, such as their ICN Gateway Profile Improvement Workshops. Additional ICN resources can be found at:

  1. Gateway by ICN User Guide
  2. Gateway by ICN EOI User Guide

ADDITIONAL INFORMATION TO CONSIDER:

  • Incomplete registrations may not be considered.
  • Information on how to create a company profile and/or submit a registration of interest on Gateway by ICN is provided below (refer to User Guides available in the 'Key Documents' section)
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • It is important that businesses registering their interest are aware that their registration does not guarantee that they will progress further in any procurement.
  • Please organise a Business Visit with Raquel Bloom Regional Manager - Greater Western Sydney M: +61 (0) 400 264 678 E: rbloom@icnnsw.org.au if you would like to discuss your Gateway profile upon registering your (EOI) submission.


36
Total Work Packages
36
Open Work Packages

John Holland Pty Ltd

location_on

NSW Australia

Project Primary Contact
person_outline
Raquel Bloom
badge
Regional Manager - Western Sydney
phone
+61 400 264 678
36
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Status
Open
Full scope EOI closes on
06 Dec 2025

General Scaffold Supply and Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
18 Dec 2025

Fencing and Gates - Permanent

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

CSR Pit Supply

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
09 Jan 2026

Bearing and expansion joint Supply

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
10 Jan 2026

Stormwater drainage installation

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Mar 2026

CSR Conduit Supply

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
04 Apr 2026

ATL stairs - Supply precast treads, riser and landings

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
13 Apr 2026

Asphalt Supply and Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
18 Apr 2026

Supply and Install Amenities building

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 May 2026

Rail sand blasting for priming

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
14 May 2026

Supply and Install Pavers to Car Park

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
15 May 2026

Supply 225mm pipe for Land Bridge Drainage.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
20 May 2026

Retaining wall Construction - Installation

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
24 May 2026

Kerb and Gutter

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 May 2026

Precast Barrier Supply

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 May 2026

Road pavements

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 May 2026

Supply SS Pipe Hangers for Land Bridge Drainage CSR

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
02 Jun 2026

Bridge metalwork ATL stairs
Balustrade and Handrail, barrier railings

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
12 Jun 2026

Landscaping

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Jul 2026

ITS Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
12 Jul 2026

Aluminothermic Welding of Rail Install Only

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
12 Jul 2026

Ultrasonic Testing of Aluminothermic Welding

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
12 Jul 2026

Rail to Earth Testing Subcontractor

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
20 Aug 2026

FRP structures - footpaths, lighting pile cap, L wall

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Aug 2026

Scupper Supply

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Sep 2026

Waterproofing Supply and Install (Deck)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
03 Sep 2026

Streetlighting

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
22 Sep 2026

Permanent Barriers, Railings and Handrails Supply

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Feb 2027

Road signage

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
02 Mar 2027

Stormwater Pipe Supply and Fittings Deck drainage

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
20 Mar 2027

Bridge Name Plate Supply

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
27 Mar 2027

Supply Cover Plates to Bridges and Barriers

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Mar 2027

Gabian Mattress Supply

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
22 Apr 2027

Supply and Install - Anti Graffiti Paint

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Jul 2027

Rail grinding

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
20 Sep 2027

Temporary Handrail Supply Bridge Decks

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.