BLUE MACKEREL NORTH PTY LTD

Blue Mackerel Offshore Wind Project

Overview

Blue Mackerel is a proposed offshore wind project that could deliver up to 1GW of renewable energy, powering up to 750,000 Victorian homes per year.

Backed by two of the world's leading energy companies, Blue Mackerel is strongly positioned to be one of Australia's first offshore wind operators.

By delivering large-scale renewable energy, Blue Mackerel could generate significant supply chain and employment opportunities. Blue Mackerel is committed to creating opportunities for Gippsland-based, Victorian and Australian businesses across various stages of our project.

Blue Mackerel was awarded Major Project Status by the Federal Government in December 2025, recognising the project's scale and economic significance to Australia.

About us

Blue Mackerel is being developed by JERA Nex bp, a 50:50 joint venture between JERA Co and bp. With more than 15 years' global experience in offshore wind, JERA Nex bp is one of the world's largest offshore wind companies and an end-to-end developer, owner and operator.

Locations and activities

Offshore licence area

Blue Mackerel's 163km2 licence area is located in the Gippsland, Victoria declared offshore wind area, and is 10km off the coast of Brataualung and Tatungalung Country between Seaspray and Woodside Beach.

Early stage marine geophysical and geotechnical surveys and studies have been carried out to enable preliminary site layout and foundation design.

A two-year metocean study commenced in March 2025 with equipment temporarily moored within our licence area to understand wind, wave and current conditions.

Environment studies are underway to baseline the presence of marine flora and fauna to enable impact assessments as are cultural heritage assessments.

Commercial fishery and other marine user engagement and impact assessments are also underway. Construction equipment and materials will be shipped to the licence area for foundation installation, wind turbine assembly, connection of inter-array cables from turbines to two offshore substations.

Onshore transmission and substation

Onshore investigations for the transmission corridor location will include assessments of cultural heritage and values, environmental studies, and geotechnical and engineering studies. Landholders and the Gunaikurnai Land and Waters Aboriginal Corporation (GLaWAC) will be consulted on these activities.

Two electricity export cables from the offshore substation will cross the shoreline in the declared Renewable Energy Zone, using horizontal directional drilling. Cables will be trenched and buried across private land, through to the onshore substation at Giffard, which will connect to the grid.

Onshore Operations and Maintenance Base (O&M)

An O&M hub will be established at Corner Inlet, South Gippsland, to support all monitoring and maintenance activities throughout the life of the project.

Offshore crews will work in shifts from a Service Operation Vessel (that includes accommodation quarters) and/or Crew Transfer Vessels to conduct all inspection and maintenance activities.

The project will also have a Melbourne office for various technical supporting roles.

Construction Port

The Victorian Government has commenced funding for development of the Port of Hastings as a suitable deep-water port to service the construction needs of the offshore wind industry.

Primary heavy infrastructure and secondary materials will be shipped and trucked to and from the Port of Hastings (and potentially other Australian deep-water ports if required).

Purpose built construction vessels will transport the equipment and materials to the licence area, install then return to the construction port for reloading and crew changes.

Contracting approach

Principal contracts

A well-established international supply chain of advanced manufacturers will supply and install core wind farm infrastructure.

The scale of the infrastructure and harsh operating environments will require heavy offshore construction vessels with highly specialized operational capabilities.

To meet these requirements, the offshore wind industry typically engages several principal contractors for its key work packages, and Blue Mackerel will also take this approach.

Secondary contracts

The principal contractors will award many different secondary contracts for equipment, materials, logistics and services.
Secondary contractor opportunities are displayed in the table below to help local businesses understand where and when the goods and services will be required.

Many of the work packages that will be available to secondary contractors will be required by more than one primary contractor.

Aboriginal-owned businesses

There will be opportunities for Aboriginal majority owned businesses to supply goods and services to Blue Mackerel and its contractors. If you are registered or certified with Kinaway or Supply Nation, please get in touch. We are building a list of Aboriginal majority-owned suppliers and connecting businesses to support strong local outcomes.

Ensuring a fair go

Blue Mackerel will assess how the Principal Contractors plan to maximise use of local suppliers as well as their actions in realising opportunities for First Nations businesses. Our principal contractors must also report to us on how they (and their secondary contractors) will create local jobs and build skills, provide opportunities for apprentices, women and First Nations workers.

Blue Mackerel - Local Content Declaration

Blue Mackerel's supplier engagement will meet the Victorian Government's Local Jobs First and Social Procurement Frameworks. This means we're embedding social, economic and environmental value into our procurement decisions.

More information:

Visit Blue Mackerel website

See our supplier information sheet under the "Key Documents" heading below.

HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)

  • To submit an EOI, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
  • The services, programmes and initiatives provided by ICN Victoria are aimed at complementing a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.

ICN GATEWAY COMPANY REGISTRATION

  • Click here to register your company profile on ICN Gateway.
  • Support and assistance are available through the web links listed below.
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • Companies should ensure that the email notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to Information & Updates, Major Projects and Regional Opportunities.

1) Gateway by ICN Setup Wizard

2) Gateway by ICN User Guide

3) Gateway by ICN EOI User Guide

Blue Mackerel Offshore Wind Project

BLUE MACKEREL NORTH PTY LTD

location_on

VIC Australia


Project Primary Contact
person_outline
ICN Victoria Gateway Support
phone
+61 03 9864 6700
mail Send Email
Work Package
EOI Open Date
EOI Close Date
Status
lock
Login to View Details
Login

Site catering, cleaning, grounds maintenance and waste management services. This will include all the typical facility management services required for an onshore substation (Giffard) and a warehouse/office at the O&M Base in Corner Inlet. The O&M Base will also handle all waste returned from offshore (Vessels/platforms/turbines) including waste lubricants/oils, filters, batteries, coolants and packaging. Principal contractors: WTG F OLC OS O&M Location focus: Construction Port Corner Inlet Giffard Project phase: Construction O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Development and delivery of technical, compliance, safety, environment protection and other learning packages. Operations-phase demand is recurring rather than one-off: offshore safety and survival, working at height and rescue, first aid, confined space, high voltage authorisation, rope access, and vessel and marine competencies, with periodic refresher cycles for a resident Gippsland workforce. Local training delivery capability in Gippsland is of particular interest. Principal contractors: WTG OLC OS O&M Location focus: Australia wide Project phase: Early development Construction O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Logistics and general freight services for all goods from Port of Hastings to Giffard and Corner Inlet to Giffard. In the operations phase the scope changes to recurring supply chain logistics supporting the O&M base: inbound freight and customs clearance of spares and consumables, supply and maintenance of lifting and mechanical handling equipment (forklifts etc), and periodic movement of large components. Volumes are lower than construction but continuous over the operating life. Principal contractors: OS OC O&M Location focus: Construction Port Corner Inlet Giffard Project phase: Construction O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Construction of onshore substation building Principal contractors: OS Location focus: Giffard Project Phase: Construction Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply of substation HV, LV, fiber optics, conductors, cables, terminations, controls and accessories. Principal contractors: OC OS Location focus: Giffard Project Phase: Construction Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Topographical surveys, LiDAR surveys, thermal and earth resistivity testing, geotechnical investigations, geophysical surveys. Principal contractors: OC OS Location focus: Giffard Project Phase: Construction Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Range of support vessels for: accommodation, transfer of crews and equipment, inspection services, guard vessels, etc. Operations requires long-duration marine services over the operating life: a service operation vessel with walk-to-work access working extended rotations, crew transfer vessels, and periodic survey, ROV, guard, dive and cable support craft. Registrations are welcomed from Australian vessel owners and operators - including operators of existing fishing and workboat tonnage suited to guard, survey and support tasks - and from crewing, marine management and vessel maintenance providers. Principal contractors: WTG F OLC OTI OSS IAC EXC O&M Location focus: Construction Port Offshore licence area Corner Inlet Project phase: Construction O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Offshore use, IP66 rating, SWL 1 - 2 tons, 690v, 30-year lifetime with maintenance. Principal contractors: WTG F OLC Location focus: Construction Port Project phase: Construction Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Detailed engineering design including loads, energy losses, dynamic loading, equipment selection, functional specifications, ratings and protections. Principal contractors: F OC OS OSS O&M Location focus: Australia wide Project phase: Early development Construction O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Site establishment, tree protection and trimming, facilities, utilities, earth works, drainage, sewerage, road upgrades, foundations, trenches and fencing. Principal contractors: OS OC Location focus: Giffard Project phase: Construction Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Hydraulic SPMT trailers, heavy duty forklifts, cherry pickers 20-30m, crawler cranes 350t - 2500t, primarily port focused. Principal contractors: WTG F OLC Location focus: Construction Port Project phase: Construction Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply of offshore marking and lighting for aviation, navigation and visibility metering. For operations this covers ongoing supply, replacement and periodic testing of aviation and navigation lighting, marking, AIS and racon equipment across turbines, substation and monitoring assets, together with the spares holding required to meet navigational and aviation obligations Principal contractors: WTG F OSS Location focus: Construction Port Corner Inlet Giffard Project Phase: Construction O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Site security including safeguarding of materials and equipment. During operations this covers the O&M base and onshore substation on a permanent basis - manned and electronic security, access control, CCTV and monitoring, perimeter and marine-side security of the berth and laydown areas, and secure handling of spares and high value equipment. Principal contractors: WTG F OS OC O&M Location focus: Corner Inlet Giffard Project Phase: Construction O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Civil works, installation and reinstatement for: horizontal directional drilling, HV, fiber optic, joint bays, thermal backfill, cable protection, controls, earthing. Principal contractors: OC OS Location focus: Giffard Project Phase: Construction Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply and installation of STATCOM, transformers, switchboards, connection to the grid, and all protection, security and control systems. Design, testing and Supply, delivery and commissioning of two 120-150MVAr STATCOM. Installation by Others. The operations scope is planned and corrective maintenance of the installed plant, onshore and offshore: HV switchgear and transformer servicing, oil and gas analysis, protection and control system testing, reactive plant servicing, secondary systems, earthing and lightning protection testing, condition monitoring, and supply of strategic spares. It also covers ongoing support of control and monitoring systems across both onshore and offshore assets - SCADA, operational technology networks, telemetry and communications, metering, and associated cyber security services. Suppliers with HV testing, commissioning, asset maintenance and industrial control system capability are of interest. Principal contractors: OS O&M Location focus: Giffard Project Phase: Construction O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Includes pre-commissioning, energization, certification and handover documentation. Principal contractors: OS OC WTG OSS Location focus: Giffard Offshore licence area Project Phase: Construction Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply of approved protection materials to stabilize marine cables and/or where cables cannot be buried. Principal contractors: OLC IAC EXC Location focus: Construction Port Project Phase: Construction Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Ongoing monitoring in accordance with management plans (ecology, biosecurity), and auditing Principal contractors: OS OC OLC O&M Location focus: Giffard Offshore licence area Project Phase: Construction O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply of all compliant and branded PPE: safety boots; hard hats; gloves; goggles; and clothing. Also includes marine and heights safety equipment and their inspection such as lifejackets, immersion suits, fall arrest harness, lanyards and rescue equipment. Principal contractors: WTG F OLC OC OS OTI O&M Location focus: Construction Port Giffard Corner Inlet Project Phase: Early development Construction O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

QA/QC services for goods received at port and site, inspection and maintenance surveys for offshore site. In operations this becomes recurring integrity and condition work: structural, coating and corrosion condition survey of towers, foundations, boat landings, secondary steelwork and the offshore substation; non-destructive testing; coating inspection and coating repair; cathodic protection survey; statutory inspection and certification of lifting equipment and lifting appliances; bolt and torque verification; and supporting documentation and reporting. Rope access and marine-access inspection, corrosion protection and coating repair capability is of particular interest Principal contractors: WTG F OLC OS OC OTI OSS IAC EXC O&M Location focus: Corner Inlet Offshore licence area Project Phase: Construction O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply and installation of fire detection systems, alarms, safety signage, firefighting equipment, etc. During construction phase Supply and installation of fire detection systems, alarms, safety signage, firefighting equipment, etc for the ONS In operations this becomes an ongoing servicing and certification requirement across the offshore substation, turbines, vessels and the onshore base - fire detection and suppression, gas detection, emergency lighting, alarms and public address, escape and rescue equipment, safety signage, and portable firefighting equipment. Principal contractors: OS OSS WTG O&M Location focus: Corner Inlet Giffard Offshore licence area Project Phase: O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply of marine scour protection materials for turbine foundations. Principal contractors: F OLC Location focus: Construction Port Project Phase: Construction Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply of sea fastening equipment, skid, grillage, and other temporary equipment used during construction and O&M. Operations-phase demand is campaign-based rather than continuous: design, fabrication, supply, certification and refurbishment of sea fastening, grillages, cradles, skid frames and transport and lifting frames used for major component exchange and other heavy offshore maintenance campaigns. Structural steel fabricators with marine certification experience are of interest. Principal contractors: WTG F OLC Location focus: Construction Port Corner Inlet Project Phase: Construction O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Supply of steel, and manufacturing of secondary and tertiary components including ladders, platforms, safety barriers etc. In operations this is renewal, repair and fabric maintenance rather than original supply: fabrication and replacement of secondary and tertiary steelwork including ladders, platforms, handrails, boat landings, davit and hoist supports and cable hang-offs, together with surface preparation, protective coating application and coating repair, and general fabric maintenance of offshore and onshore structures. Fabricators, coating applicators and corrosion protection specialists - including those working by rope access or from marine access - are of interest. Principal contractors: F O&M Location focus: Construction Port Corner Inlet Giffard Project Phase: Construction O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Regional traffic management for materials delivery and temporary road restrictions. Principal contractors: OS OC O&M Location focus: Construction Port Corner Inlet Giffard Project Phase: Construction O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Blade inspection and repairs (drones and rope access) and support services to turbine supplier maintenance activities. This is ongoing over the operating life and extends to internal blade inspection, borescope and drivetrain inspection, bolt torque and tensioning campaigns, lightning protection testing, coating and corrosion repair, cleaning, and general technician and labour support to scheduled and unscheduled turbine maintenance. Principal contractors: O&M Location focus: Offshore licence area Corner Inlet Project Phase: O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Pallet racking and storage solutions, forklifts, general facility management services including cleaning etc. Port services such as stevedoring and mooring line operations. This supports the O&M base over the life of the asset and covers warehouse fit-out and racking, inventory and stores management, forklift and materials handling supply and maintenance, and marine-side port services including berth services, stevedoring, mooring and line handling and bunkering support. Principal contractors: O&M Location focus: Corner Inlet Project Phase: O&M Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Agronomist services, restoration and rehabilitation of disturbed areas, site cleanup and revegetation. Principal contractors: OS OC Location focus: Giffard Project Phase: Construction Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Specialist technicians and workforce management of all pre-assembly, inter-connection and pre-commissioning works for multiple tower sections to 140m heights and up to 450t. Principal contractors: WTG F OLC Location focus: Construction Port Project Phase: Construction Key: WTG - Wind turbine generator supply F - Foundation supply OLC - Offshore logistics and construction support (secondary vessels) OC - Horizontal directional drilling and onshore transmission cables OS - Onshore substation O&M - Operations and Maintenance OTI - Offshore transportation and installation of WTG, foundations, offshore substation, inter-array cables and export cables OSS - Offshore substation supply IAC - Offshore inter-array cables supply EXC - Offshore to onshore export cables supply

Status
Open
EOI Open Date
••••••••
EOI Close Date
••••••••
brightness_1 Full Scope
brightness_2 Partial Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
lock
Login to View Details
Login

Includes: - Cable Route survey - Site preparation and access road improvements (if required) o Conduits supply and delivery. o Warning tapes supply and delivery. o Access roads from public access road to cable corridor. o Temporary access road construction. o Trenching, shoring, ducting, or HDD works. o Construction of joint bays, link boxes, and manholes. o Thermal backfill material supply and delivery, placement and compaction. o Cable protection systems (warning tapes, etc.). o Removal of temporary access road. o Restoration of land post-installation. o Cable drum laydown areas, bonding pits, and pulling winch setups sited within pre agreed temporary work zones. o Temporary works plan including access, compaction, and removal on completion.

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

- Site preparation - Bulk earth work and benching - Gates, fencing, and access roads - Drainage, sewage, potable water systems - Foundations for transformers, switchgear, and control buildings - Cable trenches - Earthing grid - Cranage for off-loading and installation of all equipment at site

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Installation of protection and control systems, including: - Interfaces between the Onshore Substation, HV cables, and VicGrid substation - Site security and cybersecurity measures - Duplicated protection relays - SCADA integration - Control panels and RTU installation - Interfacing with any existing systems (if applicable)

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
lock
Login to View Details
Login

Includes: - Conduits laying. Pulling of HV cables, DTS, and fiber cables (supplied by Employer) into installed - Cables and terminations, earth conductor connection and jointing Route marking and GPS logging - Connection to substation sealing ends and fibre and DTS box

Status
Closed
EOI Open Date
••••••••
EOI Close Date
••••••••
event_busy Application now closed for EOI
Loading...