Wandoan Solar Project Trust

WANDOAN SOUTH SOLAR 2

Overview

The Wandoan South Solar 2 Project located 21 km southwest of Wandoan will be developed adjacent to Gadsbys Road, with access from the southwest junction of Jackson Wandoan Road and Gadsbys Road. The project will connect to Powerlink's Wandoan South Substation, situated immediately south of the site.


With a total installed capacity of 320.05 MWdc, the project will comprise approximately 442,800 solar panels along with 74 transformers, each rated at 4.2 MVA, strategically distributed across the northern and eastern areas of the site.



Below are the project specifications:


  • Project location: 191 Bakers Road WOLEEBEE 4426
  • System type & configuration: Single Axis Tracker Solar Photovoltaic (PV)
  • Solar PV capacity: 320.05 MWdc (240 MWac Point of Connection)
  • PV Modules: 720 Wp ,725 Wp (~ 442,800 in total)
  • Inverter: 4200kVA ,70 units
  • Point of Connection: 275 kV bus of Wandoan South substation



The Wandoan South Solar 2 Project with a total installed capacity of 320.05 MWdc, is proposed to be developed on 440 ha of land including:


* Access road, Internal roads

* Drainage

* Structure

* Photovoltaic (PV) panels

* Electrical cabling

* Inverter stations

* Facility substation

* Laydown areas

* O&M and warehouse building* Offices



The GPS coordinates of the project are as below:

  • Latitude - 26 degrees 15' 55'' S
  • Longitude - 149 degrees 48' 05'' E
  • Elevation -280-330 m AHD

EXPRESSION OF INTEREST (EOI)


GRS Australia encourages local industry interested in supplying to the project to provide a Expression of interest (EOI) through the ICN Gateway.


Information on specific supply opportunities will be communicated on the Gateway by ICN project page as it becomes available, with local industry able to register its interest against them.


Please ensure that:

  • Your company profile on the Gateway by ICN platform is fully updated, accurate, and you have opted to receive email notifications about upcoming supply opportunities
  • You express your interest as either a full or partial scope supplier (where applicable), and
  • You provide answers to all questions specific to the work packages related to the project.


It is important that businesses submitting an EOI are aware that their submission does not guarantee that they will progress further in the procurement process. Only companies that can demonstrate capability and capacity in accordance with GRS Australia Pty Ltd standards will be invited to pre-qualify for specific opportunities.


FURTHER ASSISTANCE


GRS Australia highly recommends that local businesses reach out to contact the ICN Queensland in the first instance to better understand the Expression of Interest (EOI) process.

21
Total Work Packages
1
Open Work Package
20
Other Work Packages

Wandoan Solar Project Trust

location_on

QLD Australia

Project Primary Contact
person_outline
Nimmi Pushparajan
phone
+61 7 3364 0670

Work Packages

21
Total Work Packages
Filter
expand_more

Work Package
Full Scope EOI
Partial Scope EOI
Status
Status
Open
Full scope EOI closes on
30 May 2026

Express interest for any opportunities that may arise for this project.

brightness_1 Full Scope
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Status
Closed
Full scope EOI closes on
20 Jun 2025

Short and long stay accommodation

Status
Closed
Full scope EOI closes on
30 Jun 2025

Catering /Food truck services during business hours

Status
Closed
Full scope EOI closes on
30 Aug 2025

Installation of CCTV

Status
Closed
Full scope EOI closes on
30 Jun 2025

Clearing and grubbing, Bulk earth works, Foundations, Excavation, hardstand, internal and external access roads.

Status
Closed
Full scope EOI closes on
30 Jun 2025

Installation of AC/DC and earthing system cables including trenching, backfilling, and compaction.

Status
Closed
Full scope EOI closes on
30 Jun 2025

Installation of communication and meteorology stations

Status
Closed
Full scope EOI closes on
30 Jun 2025

Installation of MV and FO cables including trenching, backfilling, and compaction.

Status
Closed
Full scope EOI closes on
20 Jul 2025

RPEV consultant for electrical design

Status
Closed
Full scope EOI closes on
30 Aug 2025

Design, Supply & Installation

Status
Closed
Full scope EOI closes on
20 Jun 2025

Haulage & delivery

Status
Closed
Full scope EOI closes on
20 Jun 2025

Installation of trackers, and PV modules.

Status
Closed
Full scope EOI closes on
15 Jun 2025

Perimeter fencing procurement and installation

Status
Closed
Full scope EOI closes on
20 Jun 2025

Installation of steel piles driven to the ground for the foundation of trackers

Status
Closed
Full scope EOI closes on
30 Jul 2025

Operations & Maintenance Building, Storage Building

Status
Closed
Full scope EOI closes on
30 Jul 2025

Grass slashing

Status
Closed
Full scope EOI closes on
30 Jun 2025

Geotechnical, Topographical Surveying

Status
Closed
Full scope EOI closes on
20 Jun 2025

Traffic management, Cleaning

Status
Closed
Full scope EOI closes on
20 Jun 2025

Deliver the service of waste disposal during the construction of the solar field, including opportunities for recycling.

Status
Closed
Full scope EOI closes on
30 Jun 2025

Site security

Status
Closed
Full scope EOI closes on
30 Aug 2025

Testing, Cold and Hot commissioning