John Holland Pty Ltd

BELMONT DESALINATION PROJECT

Overview

Hunter Water Corporation (Hunter Water) has entered into a contract with John Holland to design and construct a 30 ML/d seawater reverse osmosis desalination plant. The plant will include an ocean intake structure, intake pipeline, onshore pumping station, pre-treatment and post-treatment processes, residuals handling, discharge pipework and connections to the existing potable water distribution network. The overall project also includes electrical works, controls and instrumentation, civil works, structural works and associated infrastructure such as tanks and chemical systems.
The project is located in Belmont, NSW, approximately 30 minutes south of Newcastle. The desalination plant will be constructed on land already owned by Hunter Water, which is the site of an existing Waste Water Treatment Works (WWTW).
The project scope consists of the following general elements:

  • Design of the desalination plant and associated works (HV and network modifications)
  • Site mobilisation/establishment
  • Civil works to bring the site to the design level
  • Construction of inground services
  • Construction of intake pipeline, including the offshore seawater intake and onshore seawater pump station
  • Building and structural works
  • Mechanical and electrical installation
  • Commissioning of all systems
  • Ausgrid HV lead in works
  • Modifications to the Hunter Water network at the Belmont and Cardiff reservoirs
  • Completion of the Process Guarantee Period, a two year operational period.

Procurement packages will be released to the market over the next 2 year period.

Construction is planned in five phases: Site Establishment, Earthworks, Marine & Tunnelling, Main
Plant Construction, and Commissioning and Process Proving.
The focus of the early works and earthworks phases are to enable access to the critical path works
at the intake shaft which allow the tunnelling to commence.

Works Phasing

Design
Design of the desalination plant
Site establishment
Site access and delineation to Belmont WWTW site
Site office compound establishment
Earthworks
Clearing and grubbing including cultural/archaeological clearance
Bulk earthworks including cut to fill then import of fill
Stormwater pipe network installation
Onshore intake structure
Piling and shaft excavation
Permanent base slab
Post tunnel FRP structural works and mechanical installation
Tunnelling (Pipejack TBM)
Temporary TBM launch slab and jacking frame
Ancillary plant and equipment establishment
Tunnel excavation to caisson breakthrough
Tunnel service demobilisation
Marine Works
Offsite casting yard establishment
Jack Up Barge (JUB) establishment
Marine caisson sinking and TBM breakthrough
Retrieve MTBM via JUB, install dome and finishing works

How to register an Expression of Interest (EOI) for this project

Work packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to the 'EOI User Guide' below for instructions and assistance to submit an EOI.

- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.

ICN Gateway Company Registration

- Click here to register your company profile on ICN Gateway.

- Support and assistance are available through the document 'Creating an ICN Gateway Company Profile' below.

- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

82
Total Work Packages
82
Other Work Packages

John Holland Pty Ltd

location_on

NSW Australia

Project Primary Contact
person_outline
Dusko Bajic
badge
Industry Manager
phone
+61 417 323 636

Work Packages

82
Total Work Packages
Filter
expand_more

Work Package
Full Scope EOI
Partial Scope EOI
Status
Status
Closed
Full scope EOI closes on
14 Feb 2025

Construction Survey Services

Status
Closed
Full scope EOI closes on
14 Feb 2025

Downstream Commercial Management Services

Status
Closed
Full scope EOI closes on
14 Feb 2025

Office Cleaning

Status
Closed
Full scope EOI closes on
30 Jun 2025

Offshore Survey Works

Status
Closed
Full scope EOI closes on
14 Feb 2025

Site establishment plumbing

Status
Closed
Full scope EOI closes on
14 Feb 2025

Cleaning Services

Status
Closed
Full scope EOI closes on
14 Feb 2025

Waste Disposal - Spoil/Contaminated Waste

Status
Closed
Full scope EOI closes on
31 Mar 2025

Time Lapse Photography

Status
Closed
Full scope EOI closes on
31 Mar 2025

Earthworks Plant Hire (Wet)

Status
Closed
Full scope EOI closes on
31 Mar 2025

Crane Hire

Status
Closed
Full scope EOI closes on
31 Mar 2025

General Plant & Equipment hire

Status
Closed
Full scope EOI closes on
31 Mar 2025

Concrete Pump Hire

Status
Closed
Full scope EOI closes on
31 Mar 2025

Non Destructive digging

Status
Closed
Full scope EOI closes on
31 Mar 2025

Cost planning consultant

Status
Closed
Full scope EOI closes on
31 Mar 2025

NDD/Potholing for Reservoir Investigations

Status
Closed
Full scope EOI closes on
31 Mar 2025

Site Offices/Amenities - Supply & Install

Status
Closed
Full scope EOI closes on
31 Mar 2025

Road Geotechnical Dilapidation Survey

Status
Closed
Full scope EOI closes on
31 Mar 2025

Electrical Enabling Works

Status
Closed
Full scope EOI closes on
31 Mar 2025

Temporary Fencing (ATF)

Status
Closed
Full scope EOI closes on
31 Mar 2025

Permanent Fencing (Temp)

Status
Closed
Full scope EOI closes on
31 Mar 2025

Site Security

Status
Closed
Full scope EOI closes on
31 Mar 2025

Site Access Control System

Status
Closed
Full scope EOI closes on
31 Mar 2025

Testing Services (soil & concrete)

Status
Closed
Full scope EOI closes on
30 Jun 2025

Pile Trimming

Status
Closed
Full scope EOI closes on
30 Jun 2025

Construction Dewatering

Status
Closed
Full scope EOI closes on
31 Mar 2025

Traffic Control Signals

Status
Closed
Full scope EOI closes on
30 Aug 2025

Linemarking

Status
Closed
Full scope EOI closes on
30 Aug 2025

Labour Hire

Status
Closed
Full scope EOI closes on
30 Aug 2025

Permanent Fencing and Gates

Status
Closed
Full scope EOI closes on
31 Mar 2025

Traffic Control

Status
Closed
Full scope EOI closes on
31 Mar 2025

Bulk Earthworks & Pavements

Status
Closed
Full scope EOI closes on
31 Mar 2025

Site Waste Management - Office Waste

Status
Closed
Full scope EOI closes on
31 Mar 2025

Site Waste Management - Construction Waste

Status
Closed
Full scope EOI closes on
31 Mar 2025

Formwork Reo, Pour concrete Packages

Status
Closed
Full scope EOI closes on
30 Aug 2025

Waterproofing (Inground Structures)

Status
Closed
Full scope EOI closes on
30 Jun 2025

Major electrical Works

Status
Closed
Full scope EOI closes on
30 Jun 2025

Building Plumbing (Inside the building)

Status
Closed
Full scope EOI closes on
30 Jun 2025

Steel Recycling

Status
Closed
Full scope EOI closes on
30 Jun 2025

LV & HV Pits and Conduits Installation

Status
Closed
Full scope EOI closes on
30 Jun 2025

Private OH Installation Package

Status
Closed
Full scope EOI closes on
30 Jun 2025

Yard Pipework Installation (Large & Small, Fire)

Status
Closed
Full scope EOI closes on
30 Aug 2025

Waterproof Membranes and Epoxy Coating

Status
Closed
Full scope EOI closes on
31 Mar 2025

Supply & Install Structural Steel

Status
Closed
Full scope EOI closes on
30 Jun 2025

S&I Single & Double Hinged Doors

Status
Closed
Full scope EOI closes on
31 Mar 2025

Supply & Install Precast Panel Masonry

Status
Closed
Full scope EOI closes on
31 Mar 2025

PCC Floor Slabs

Status
Closed
Full scope EOI closes on
31 Mar 2025

Water Treatment

Status
Closed
Full scope EOI closes on
30 Jun 2025

Supply & Install Roofing & Cladding

Status
Closed
Full scope EOI closes on
30 Aug 2025

Stormwater Drainage Install

Status
Closed
Full scope EOI closes on
30 Jun 2025

Supply & Install Louvres

Status
Closed
Full scope EOI closes on
30 Jun 2025

Supply & Install Roller Shutters

Status
Closed
Full scope EOI closes on
31 Mar 2025

Masonry & Blockwork

Status
Closed
Full scope EOI closes on
30 Jun 2025

Supply and Install Roof Ventilation Systems

Status
Closed
Full scope EOI closes on
30 Jul 2025

Supply & Install Switchroom Suspended Floors

Status
Closed
Full scope EOI closes on
31 Mar 2025

Utility Locating and Potholing - replaced

Status
Closed
Full scope EOI closes on
30 Jun 2025

Water Retaining Structures (Tanks & Pits)

Status
Closed
Full scope EOI closes on
30 Aug 2025

Metalworks Package - Structural Steel & Walkways

Status
Closed
Full scope EOI closes on
30 Aug 2025

Automation work Including Hardware Supply

Status
Closed
Full scope EOI closes on
30 Aug 2025

Landscaping

Status
Closed
Full scope EOI closes on
30 Aug 2025

Signage and Wayfinding

Status
Closed
Full scope EOI closes on
30 Aug 2025

S&I Steel Bollards

Status
Closed
Full scope EOI closes on
30 Aug 2025

Kerb & Gutters

Status
Closed
Full scope EOI closes on
31 Mar 2025

Gantry & Monorail Hoists (MFRO, TWPS & Chlorine)

Status
Closed
Full scope EOI closes on
30 Jun 2025

Polymer Storage & Dosing System

Status
Closed
Full scope EOI closes on
30 Jun 2025

Lime Sludge Dewatering

Status
Closed
Full scope EOI closes on
30 Jun 2025

Quarry Materials Supply

Status
Closed
Full scope EOI closes on
31 Mar 2025

Fuel Supply

Status
Closed
Full scope EOI closes on
30 Jun 2025

Heavy haulage

Status
Closed
Full scope EOI closes on
31 Mar 2025

Geotextile Supply

Status
Closed
Full scope EOI closes on
31 Mar 2025

Reinforcement Supply

Status
Closed
Full scope EOI closes on
30 Aug 2025

Civil Stormwater Pipe Supply

Status
Closed
Full scope EOI closes on
31 Mar 2025

Concrete Supply & Testing

Status
Closed
Full scope EOI closes on
30 Jun 2025

Valves

Status
Closed
Full scope EOI closes on
31 Mar 2025

Diving Service

Status
Closed
Full scope EOI closes on
31 Mar 2025

Supply & Deliver Precast Hollow Core Wall Panels

Status
Closed
Full scope EOI closes on
31 Mar 2025

Generators

Status
Closed
Full scope EOI closes on
30 Aug 2025

Structural Steel Fabrication packages

Status
Closed
Full scope EOI closes on
30 Jun 2025

Chemical Storage & Dosing Systems

Status
Closed
Full scope EOI closes on
30 Jun 2025

Pumps

Status
Closed
Full scope EOI closes on
30 Jun 2025

Fire & Potable Water Tanks

Status
Closed
Full scope EOI closes on
30 Aug 2025

Road Furniture and Signage

Status
Closed
Full scope EOI closes on
30 Aug 2025

Stormwater Pipe Supply