BAYWA R.E. AUSTRALIA PTY LTD

BULLAWAH WIND FARM

location_onNSW Australia
location_on

NSW Australia

business

BAYWA R.E. AUSTRALIA PTY LTD

Project Primary Contact
person_outline
Geoff Reardon
Regional Manager - Murray/Riverina NSW
phone_enabled
+61 402 632 027
Overview

Based in 34 countries, with revenues of almost E5.8 billion, BayWa r.e. is a leading global renewable energy developer, service provider, distributor and energy solutions provider, and is actively shaping the future of energy. Using innovation, creativity and expertise, BayWa r.e have successfully brought over 6 GW of renewable energy online, while managing over 10.5 GW of assets.

BayWa r.e. are proposing to develop Bullawah Wind Farm, located 36km south east of the township of Hay, in the Riverina Region located within the Hay Shire, Murrumbidgee and Edward River Local Government Areas (LGAs) and in the South West Renewable energy Zone (REZ)

The key components of the Project include:

- Up to 143 Wind turbine generators
- Battery energy storage facility
- Permanent ancillary infrastructure including internal roads, hardstands, main and collector substations,
switchyards, operations and maintenance facilities, underground and overhead electricity transmission
lines and poles, telecommunications facilities and utility services, permanent meteorological masts and
water storage tanks
- Temporary facilities including the temporary workforce accommodation (TWA) camp, site offices,
amenities, construction compounds and laydown areas, on-site borrow pits, rock crushing facilities,
concrete or asphalt batching plants, minor work front' construction access roads, environmental
management and monitoring and signage
- Off-site road works, involving upgrades to the proposed local transport route and establishment of site
access points to facilitate delivery of wind turbine components to the Project Area as required.


Construction commencement is scheduled for 2026 with an expected workforce of up to 350 people during construction.

Expression of Interest :

BayWa r.e. encourages local industry interested in supplying to the project to provide a Expression of interest (EOI) through the ICN Gateway.

Information on specific supply opportunities will be communicated on the ICN Gateway project page as it becomes available, with local industry able to register its interest against them.

Please ensure that:

Your company profile on the ICN Gateway is complete, up-to-date and accurate including electing to be notified via e-mail of supply opportunities and to register your expression of interest where appropriate

43
Total Work Packages
43
Open Work Packages
43
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Status
Open
Full scope EOI closes on
20 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
24 Dec 2025

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"Fencing contractor for permanent and temporary fencing, cattle grid installation, permanent signages (supply and install)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

Formwork "ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

Onsite Concrete Batching Plant

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

Operations and Maintenance Facility Design and Construction

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

Overhead Powerline Construction

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

Reinforcement Supply and Delivery

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

Substation Civil Construction

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

"ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Bullawah Wind Farm project.
All EOI submissions should be made through the ICN Gateway."

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.