NSW Australia
EnergyCo NSW
Hunter Transmission Project - local supplier expressions of interest
The Hunter Transmission Project (HTP) is critical State significant infrastructure project.
EnergyCo is seeking expressions of interest from local Hunter region suppliers to be part of the Hunter Transmission Project (HTP), supporting the State's clean energy transition.
The HTP involves building a new overhead 500 kilovolt transmission line spanning around 100 kilometres between Bayswater in the Upper Hunter and Olney in the Lower Hunter.
The HTP will also include building 2 new switching stations in Bayswater and Olney and works at the existing Bayswater and Eraring substations.
EnergyCo will appoint two main contractors to manage the design and construction of the HTP - one for the transmission line and one for the substations/switching stations.
The project is currently in the planning phase and construction is anticipated to start from 2026.
A local supplier database will be included in the procurement package when EnergyCo appoints the design and construct contractors and network operator.
Industry Briefings
Industry briefings will be held:
- 26 August, 3pm-4.30pm at Singleton Library, 8-10 Queen Street Singleton
- 27 August, 11am-12.30pm at Cessnock Leagues Club, Knipe West room, 1 Darwin Street Cessnock
- 28 August, 5.30pm-7pm at Toronto Diggers, 41 The Boulevarde Toronto
- 29 August, 5pm-6.30pm at NEX, King Street room, 309 King Street Newcastle
- 30 August, 12pm-1.30pm online via Microsoft Teams
To register to attend an industry briefing or learn more about supplier opportunities for the HTP, please visit Hunter Transmission Project
How to register an Expression of Interest (EOI) for this database
- Work packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to the 'EOI User Guide' below for instructions and assistance to submit an EOI.
- Please note "Full Scope" registration is suitable for organisations capable to take a role as Head Contractor. "Partial Scope" registration is suitable for all local SMEs interested to participate in this project.
- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
ICN Gateway Company Registration
- Click here to register your company profile on ICN Gateway.
- Support and assistance are available through the document 'Creating an ICN Gateway Company Profile' below.
- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
Taking part in construction of approximately 100 km 500 kilovolt transmission line.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Express interest for any opportunities that may arise for this workpackage
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.