PCL CONSTRUCTION PTY LTD
BULLI CREEK SOLAR PROJECT
location_onQLD Australia
Overview

The Bulli Creek Solar Project is stage one of the Bulli Creek Energy Park with a total capacity of 960 MWDC. The project incorporates over 1.5 million bifacial solar modules distributed across more than 14,000 independent rows. The infrastructure includes over 51,000 meters of internal roads and more than 204,000 steel foundation piles. The project features 232 units of 4.2 MVA, integrated skids with inverters, MV transformers, and MV switchgear. The substation includes four 250 MVA main power transformers, with energy being transmitted via a 3.5 km, 330kV dual circuit overhead line from the substation to the Powerlink switchyard.

Final Pricing / Negotiations will occur in parallel to design development and will form the basis of contract between PCL and selected project partners.


EXPRESSIONS OF INTEREST

The Bulli Creek Solar project will deliver diverse and complex engineering and construction work packages. PCL construction encourages all suppliers interested in supplying the project to register an expression of interest (EOI) through this ICN Gateway page.

Information on supply opportunities will be posted on this page as it becomes available, with suppliers able to register their interest against them.

Please ensure that:

  • Your company profile on the ICN Gateway is complete, up-to-date, and accurate including electing to be notified via e-mail of supply opportunities
  • You register your interest as a full or partial scope supplier (where applicable), and
  • You respond to all project and work package-specific questions.


It's important for businesses to note that submitting EOIs do not guarantee they will progress further in the procurement process. Only companies that can demonstrate capability and capacity in accordance with PCL Construction standards will be invited to pre-qualify for opportunities.


FURTHER ASSISTANCE

PCL Construction strongly encourages suppliers to contact ICN Queensland in the first instance to improve their understanding of the EOI process.



31
Total Work Packages
31
Open Work Packages

PCL CONSTRUCTION PTY LTD

location_on

QLD Australia

Project Primary Contact
person_outline
Nimmi Pushparajan
phone
+61 7 3364 0670
31
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
01 Dec 2025

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
23 Feb 2026

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Apr 2026

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Apr 2026

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Apr 2026

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Apr 2026

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Apr 2026

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Apr 2026

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Apr 2026

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Apr 2026

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Apr 2026

ICN hereby invites Expressions of Interest (EOI) from respective trade contractors and suppliers for the Bulli Creek Solar project. All EOI submissions should be made through the Gateway by ICN.

PCL Constructors Pacific Rim Pty Ltd's objective is to contract as many tenders locally as possible.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.