Overview

Singleton Bypass - New England Highway

The Australian Government has invested $560 million and the NSW Government has invested $140 million to build the Singleton Bypass. The bypass will improve travel times, freight efficiency and safety for local and interstate motorists.

The eight-kilometre project will bypass five sets of traffic lights in the CBD and is the largest road infrastructure investment in Singleton's history.

In November 2023, Acciona Construction Australia Pty Ltd (ACCIONA) was awarded a design and construct contract to deliver the Singleton Bypass.

The Singleton Bypass is located to the west of Singleton with connections to the New England Highway to the north and south of Singleton.

ACCIONA will progress site investigations and finalise the detailed design in preparation for the start of major work in third quarter of 2024. The project is expected to open to traffic in late 2026, weather permitting.

The works are located within the Singleton Council LGA which includes the township of Singleton and surrounding suburbs of Gowrie, Singleton Heights, Glenridding, Whittingham and Darlington.

The main features of the project include:

  • About eight kilometres of new highway (the bypass) with a single lane in each direction
  • Connection with the New England Highway at the southern end of the bypass, including a southbound entry ramp and northbound exit ramp
  • A bridge at the southern connection that carries traffic over the northbound exit ramp
  • A long bridge over the Main North railway line, the Doughboy Hollow and Hunter River floodplain, Army Camp Road and Putty Road (bridge over the floodplain)
  • Connection to Putty Road including northbound and southbound entry and exit ramps and a roundabout at Putty road
  • A bridge over the Rose Point floodway and Putty Road connection
  • A bridge over the Hunter River
  • A bridge over the New England Highway west of the existing Main North railway line overbridge at Gowrie
  • Connection with the New England Highway at Gowrie consisting of a southbound entry ramp and northbound exit ramp. The northbound exit ramp would connect to the New England Highway via a new roundabout intersection at Maison Dieu Road
  • A northbound climbing lane between Gowrie and the northern connection
  • Connection at Magpie Street including providing access to the nearby industrial area, consisting of a southbound entry ramp, southbound exit ramp and northbound entry ramp
  • A bridge over the bypass at the northern connection.

Further information about the project is available HERE

Organisations who express interest in the project will be contacted by ACCIONA if their services could be used and will be invited to participate in the tender process.

How to register an Expression of Interest (EOI)

- Work packages currently available to submit an EOI for are listed in the 'Work Packages' below. Refer to the 'EOI User Guide' below for instructions and assistance to submit an EOI.

- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.

- Registrants of EOIs will need to provide:

  1. Updated ICN Gateway Profile (selection will be based on information provided in your profile)
  2. Past experience on TfNSW projects (please list them in the Gateway profile section "Completed Projects")
  3. Willing to complete the SBP Tender Questionnaire attached under "Project Documents" tab.
  4. To be eligible for Tendering, Shortlisted Subcontractors and Suppliers will be required to adhere to the following mandatory Project requirements :
    1. Signed and unamended Confidentiality Deed
    2. Willing to register or be registered on Procure (Acciona Procurement Portal) and follow all submission requirements requested through Procure.

ICN Gateway Company Registration

- Click HEREto register your company profile on ICN Gateway.

- Support and assistance are available through the document 'Creating an ICN Gateway Company Profile' below.

25
Total Work Packages
18
Open Work Packages
7
Other Work Packages
25
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
01. Civil Work
Status
Open
Full scope EOI closes on
31 Dec 2024

Installation of hand pour and slipform Kerb and Gutter works

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2024

Supply and Install of permanent line marking inclusive of longlines, chevrons and colour (waterborne and thermoplastic)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2024

Supply and Install of permanent handrails for drainage culverts and retaining walls

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2024

Supply and operation of earthworks and compaction plant (wet hire)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2024

Permanent shotcrete & rockbolts application (install only)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2024

In-situ lime subgrade stabilization via. mechanical means

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2024

Supply and operation of surface miner for rock excavation

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
19 Jul 2024

General cleaning of site offices and facilities

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Aug 2024

Crushing and screening of Site Won material (upper zone formation, select material zone, general fill)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
19 Jul 2024

Supply and delivery of associated permanent/temporary geotextile products

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Jul 2024

Supply of HDPE pipes for drainage works

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
11 Oct 2024

EOI should include the following;
. Proposed menu and pricing to be uploaded with the EOI registration
. Proposed hours of operation
. Proposed setup of onsite canteen
. Copies of insurance certificates of currency e.g. public liability and workers compensation to be presented before commercial negotiation.
Acciona will provide the following:
. An area 8m long available for a canteen setup
. Water and electricity
Service Provider to obtain:
. All required permits for operation such as Singleton Council approvals
. Service Provider to cover all other associated costs
. Service Provider and their suppliers to comply with all ACCIONA safety requirements
. ACCIONA Christmas shutdown is COB Friday, 20 December 2024, and re-open on Monday, 6 January 2025
. ACCIONA are targeting completion June 2026 however this date is subject to weather etc and may require options for extension of the canteen operation
. Finally, subject to agreement of the above ACCIONA would propose to enter into a contract to document the conditions and requirements of both parties

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

02. Structures
Status
Open
Full scope EOI closes on
31 Dec 2024

Galvanized and Stainless-Steel metalwork (traffic rails, cover plate, monowills, scuppers, box drains)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2024

Supply and Install Waterproofing Membrane - Bridges

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

Supply & Install Anti-Graffiti coating - Bridges

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2025

Supply & Install Noise Walls - including Acrylic panels

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Oct 2024

Supply & Install - Barrier Railing and Throw Screens

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

03. Pavement Works
Status
Open
Full scope EOI closes on
31 Dec 2024

Supply & Install asphalt for mainline pavement

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2024

Supply & Install spray sealing for mainline pavement

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2024

Establishment and operation of on-site pug mill for heavily bound base (HBB).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

04. Finishing Works
Status
Open
Full scope EOI closes on
31 Dec 2024

Supply and install of fauna crossing and associated furniture

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2024

Supply and installation of guard rails, end terminals, steel wire rope

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2024

Supply and installation of permanent signage, gantries, and guideposts

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 Dec 2024

Supply and install of permanent streetlights, conduits, cables and associated infrastructure.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
30 Oct 2024

Supply and installation of permanent landscape treatments and associated planting

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.