SPINIFEX OFFSHORE WIND FARM PTY LTD
SPINIFEX OFFSHORE WIND FARM
location_onVIC Australia
Overview

Overview
Alinta Energy and Parkwind are proposing to develop an initial 1GW+ fixed-foundation offshore wind farm in the Southern Ocean Region offshore wind zone. It could supply approximately 10% of Victoria's current electricity needs. The project is proposed to connect to the grid via the existing substation at Portland. The currently envisaged design which is subject to change includes:

* Offshore Wind Turbine Generators (WTGs) nominally between 15-18MW megawatts capacity
* Offshore array cables and export cables
* Offshore substation platforms
* Onshore transmission cables
* Switchyard works

The project is being developed by leading energy investor, operator, retailer and developer Alinta Energy, and offshore wind energy company JERA-Parkwind.

Timing
The Spinifex project was announced in December 2021. It is currently in the feasibility and investigation phase of the project.

The development of an offshore wind farm, including feasibility, planning and approvals and construction generally takes around 6 - 10 years.

We hope to obtain the necessary legislative and regulatory approvals and make a financial investment decision by 2029.

The project would be operational for around 35 years.

HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)

  • To submit an EOI, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
  • This is an initial, generic EOI submission only. All companies who submit an EOI will be included in information presented to companies who are short listed to bid for this Project.
  • The services, programmes and initiatives provided by ICN Victoria are aimed at complementing a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.

ICN GATEWAY COMPANY REGISTRATION

  • Click hereto register your company profile on ICN Gateway.
  • Support and assistance are available through the web links listed below.
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • Companies should ensure that the email notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to Information & Updates, Major Projects and Regional Opportunities.


1) Gateway by ICN Setup Wizard

2) Gateway by ICN User Guide

3) Gateway by ICN EOI User Guide



21
Total Work Packages
21
Open Work Packages

SPINIFEX OFFSHORE WIND FARM PTY LTD

location_on

VIC Australia

Project Primary Contact
person_outline
Peter McCracken
badge
Regional Manager Barwon Region
phone
+61 407 505 477
21
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Status
Open
Full scope EOI closes on
30 Jun 2025

- High voltage scheduled and unscheduled maintenance.
- Spare parts.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Engineering consultants (offshore and onshore)
- Drafting (offshore and onshore)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Health and Safety
- Heritage studies
- Marine studies
- Environment and cultural heritage studies
- Photography and film
- Stakeholder and community engagement
- Training providers and facilities
- Accommodation and housing
- Hospitality and catering
- Merchandise supply
- Printing

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Geophysical surveys
- Geotechnical surveys
- Onshore laboratory testing
- Ground hazard assessments
- Ground model development
- Geotechnical foundation design

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- R2 Model Validation
- GPS Compliance monitoring.
- Power quality assessment system event analysis.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Engineering consulting and design.
- Power system modelling services.
- Hold Point Testing and reporting.
- TNSP interface management.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Design and engineering.
- Cable manufacture and supply
- Cable trenching
- Cable protection
- Cable installation.
- Cable jointing and termination.
- Horizontal directional drilling.
- Testing and commissioning.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Metocean site measurements
- Metocean modelling

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- O&M port infrastructure
- Port services

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Crew transfer vessels or helicopters

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Design and engineering
- Topsides, jacket and pile fabrication and installation
- Grouting services
- Seabed preparation
- Noise mitigation.
- Steel supply.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Engineering consulting and design
- Batch plants
- Bulk material disposal
- Bulk material supply
- Civil and electrical engineering works
- Foundation construction
- Piling services
- Prefabricated concrete products
- Transmission lines
- Landscaping
- Cable installation
- Directional drilling
- Site surveys
- Site clearing
- Fencing, security.
- Engineering consulting and design.
- Conductor, OPGW, insulators manufacturing, supply and installation.
- Footings and earthing

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Construction Port infrastructure
- Port services

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Directional drilling
- Site geotechnical surveys

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Structural inspections
- Offshore cleaning
- Service and inspection of davit cranes.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Cable inspections
- Fault finding
- Repair services.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Construction support vessels
- Onshore cranes
- Transfer vessels
- Helicopters
- Transport vehicles
- Over dimensional road transport
- Road escort
- Public road upgrades.
- Airline operators

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Inspections
- Refurbishments
Maintenance

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Lidars
- Floating Lidars
- Site conditions assessment
- Wind Resource Assessment.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Turbine manufacture
- Nacelle
- Rotors
- Towers
- Blades
- Other secondary components
- Heavy vessels
- Commissioning and Grid Testing.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
30 Jun 2025

- Engineering consulting and design
- Jacket and pile fabrication
- Jacket and pile installation
- Monopile fabrication
- Monopile installation
- Grouting services
- Seabed preparation
- Noise mitigation
- Steel supply

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.