Principal - VHBA (VIDA)
Managing Contractor - Built
Architect - Lyons
The Main Works - Package 3 scope to be delivered as part of this Project and includes the remaining works necessary to achieve the Project objectives and scope.
The following Early Works are subject to the final design solution adopted:
- Demolition of Gretta Volum Centre
- Site clearance, In ground services diversions and installations
- Footings and basement
- Ground floor slab
The Early Works are recognised as being a complex part of the Project dealing with a number of service diversions and other Site preparations to facilitate the Main Works. The exact scope of these works is still being determined and the State is looking to the Managing Contractor to assist in determination of the scope that would improve the overall Program.
The Main Works will see the construction of approximately 26,000m2 over several levels with links to existing buildings at the various levels. In addition, there will be approximately 3,000m2 of refurbishment works to existing buildings across the Site.
The new works and refurbished areas will provide expanded hospital departments and modern facilities to support the Health Provider to continue serving the Geelong and G21 region of Victoria with contemporary models of care well into the future. With new models of care and new design guidelines, the redevelopment will be flexible and able to respond to increasing demand expected over the coming years.
Any interested suppliers are required to register interest via the ICN Gateway.
There are two EOI periods for the Project split as follows:
EOI 1 - Pre-Tender Market Testing for Cost Plan Verification
As part of the cost plan validation exercise, trade input is required to verify items including rates, measures, scope inclusions and exclusion provided by the QS.
EOI 1 is scheduled to close around 31 May 2024.
EOI 2 - Tender
Once the cost plan is validated, EOI 2 will be opened. Procurement is due to commence towards the end of 2024, by which time there will be information available on the ICN Gateway on the tender process.
Pre-qualification documentation required for interested suppliers is under review but evaluation shall include assessment against:
- Financial capability
- Insurances held by suppliers
- Experience and capacity
- Experience and capacity of key personnel
- Industrial relations
- Current workload and total capacity
- Proven program performance
- Safety and quality systems
- Built's prior experience with supplier
The project is due for completion in September 2028.
HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)
ICN GATEWAY COMPANY REGISTRATION
VIC Australia
Bed Pan Washer
Carpentry
-demolition of Swanston Centre courtyard
- construction of new ambulance route and pedestrian pathways and ramps
-covered walkways
-retaining walls to new ambulance route including make good after demolition where required
Request for demolition assistance
Drug Safes
Electrical infrastructure upgrades, power distribution, communications network, lighting, exit and emergency lighting, security and access control
Epoxy
Examination and Procedure Lights
External works
Final Clean
Wet fire protection including hydrants, hose reels, sprinklers and fire tanks. Dry fire protection including fire curtains, baffles, smoke detection, occupant warning systems.
Floor Finishes / Vinyl
Basement wall retention system consisting of concrete soldier piles, shotcrete walls and capping beams. Concrete bored piers, pile caps and raft footings
Handrails and Balustrades
Stormwater/rainwater services, sanitary/waste plumbing, hot and cold water services, plumbing fixtures and fittings. Specialty medical use water services.
Infant / Neonate Equipment
Internal Glazing
Joinery
Lockers
Mechanical services for heating, cooling, ventilation and building management, Medical/lab gases, pneumatic tube systems.
Medical Fridges and Freezers
Medical Pendants and Theatre Lights
Non-medical appliances
Patient Lifters
Patient Monitoring System
Pharmacy / Lab Chemical Cabinets
Probe Storage and Disinfection Units
Site clearance, bulk excavation for basements and disposal of spoil from site
Scaffold
Signage
requests for temporary engineering work
Tiling and Stone
Walls and Ceilings
Waste Chute
Waterproofing