Project at a glance


NSW Australia (Onshore)
Procurement Phase
CPB CONTRACTORS PTY LIMITED & UGL ENGINEERING PTY LIMITED
$1.5 Billion

Contact Details


Geoff Reardon
Regional Manager - Murray/Riverina NSW
+61 402 632 027

Transgrid has contracted the HumeLink West JV (UGL Engineering and CPB Contractors) to deliver a fully completed turnkey solution for the HumeLink West portion of HumeLink upon the anticipated granting of construction approval.


Initial activities include site investigations and engineering design to be followed by enabling civil works primarily for temporary roads and facilities. Project construction will include the delivery of two new substations and upgrade of a third, the erection and stringing of approximately 360 transmission line towers across 130kms of alignment between Wagga Wagga, the lower Snowy Mountains (at Maragle) and an interface point with HumeLink East, near Gundagai.


HumeLink West JV (HLJV) is now establishing procurement and resourcing relationships with local and regional suppliers to support a wide range of activities including:


- Geotech, survey and engineering design related works
- Civil works and traffic management to construct or upgrade about 300 kms of access tracks
- Works to site two temporary 500 worker accommodation villages and other facilities
- Establishment of 6 equipment laydown areas along the alignment
- Transport services for the delivery of steel, concrete and equipment
- Preparation of new substation sites at Gugaa and Maragle
- Construction of new substations at Gugaa and Maragle
- Upgrade of the existing Wagga Wagga Substation
- Erection and stringing of approximately 360 transmission towers
- Rerouting of approximately 2 kms of existing transmission line to Wagga Wagga Substation.


The HumeLink JV is committed to working with Transgrid to maximise the social and economic benefits of HumeLink West to local and regional communities and is establishing a range of initiatives that will drive local business, employment and trainee participation throughout project delivery. Interested parties are encouraged to be in contact via email hlwprocurement@hljv.com.au

Additional information about the project is available by clinking on the link https://www.transgrid.com.au/projects-innovation/humelink


How to Register an Expression of Interest for Listed Packages

Work Packages currently available to submit an EOI for are listed on the 'Work Packages' tab above

To submit an initial EOI for the Work Scopes, companies must have an ICN Gateway capability profile.

Information on how to create your capability profile on ICN Gateway is detailed below.


ICN Gateway Capability Profile Creation

Click on "Join Now", at the top of this screen, to complete your capability profile on ICN Gateway.

Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible. Click below to download the guide to setting up your Gateway profile


Project Documents
ICN Gateway Guide

Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
Accordian collapse

General Requirements

Full Scope EOI

Create EOI
Closes: 
01 Mar 2024 (AEDT)

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
08 Mar 2024 (AEDT)

Partial Scope EOI

  Open
AccordianPlus Indigenous Artist

Full Scope EOI

Create EOI
Closes: 
08 Mar 2024 (AEDT)

Partial Scope EOI

  Open
AccordianPlus Minor Civil Works

Full Scope EOI

Create EOI
Closes: 
08 Mar 2024 (AEDT)

Partial Scope EOI

  Open
AccordianPlus PPE Supply

Full Scope EOI

Create EOI
Closes: 
08 Mar 2024 (AEDT)

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
08 Mar 2024 (AEDT)

Partial Scope EOI

  Open
AccordianPlus Survey Requirements

Full Scope EOI

Create EOI
Closes: 
08 Mar 2024 (AEDT)

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
14 Mar 2024 (AEDT)

Partial Scope EOI

  Open
AccordianPlus Major Concrete Supply

Full Scope EOI

Create EOI
Closes: 
14 Mar 2024 (AEDT)

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
14 Mar 2024 (AEDT)

Partial Scope EOI

  Open
AccordianPlus Reinforcing Bar

Full Scope EOI

Create EOI
Closes: 
14 Mar 2024 (AEDT)

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
14 Mar 2024 (AEDT)

Partial Scope EOI

  Open
AccordianPlus Concrete Pumping

Full Scope EOI

Create EOI
Closes: 
20 Mar 2024 (AEDT)

Partial Scope EOI

  Open
AccordianPlus Quarry Supplies

Full Scope EOI

Create EOI
Closes: 
20 Mar 2024 (AEDT)

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
20 Mar 2024 (AEDT)

Partial Scope EOI

  Open
AccordianPlus Ecologist

Full Scope EOI

Opens: 
29 Feb 2024 (AEDT)

Partial Scope EOI

  Pending
Note: The closing date/s for expressions of interest are subject to change.
PROJECT
NSW AUSTRALIA

Acciona Genus Joint Venture have been awarded the HumeLink East Portion of the Project spanning from Bannaby to Wondalga which will reinforce Transgrid's transmission network in southern NSW to improve the flow of electricity from new generation sources in southern and western NSW to major demand centres in the State, and to customers across the NEM.

Acciona Genus Joint Venture have been tasked to complete Humelink East, which includes all works and activities associated with:
1. Augmenting the existing Bannaby 500kV Substation;
2. Delivering a new 500kV double circuit transmission line connecting the augmented Bannaby 500kV substation to the interface point with HumeLink West;
3. Delivering all infrastructure required for the 500kV double circuit transmission Line; and
4. Delivering the infrastructure required at the Interface Point to enable connection between HumeLink West and HumeLink East Transmission Line works.

View Project