M1 Pacific Motorway extension to Raymond Terrace - Heatherbrae Bypass


Project at a glance


NSW Australia
Under Construction
SEYMOUR WHYTE CONSTRUCTIONS PTY LTD
$240m

Contact Details


Dusko Bajic
Industry Manager

The Australian and NSW governments are funding the 15-kilometre M1 Pacific Motorway extension to Raymond Terrace. The extension will boost the regional economy and improve connectivity, road transport efficiency and safety for local and interstate motorists.

The M1 extention project will connect the existing M1 Pacific Motorway at Black Hill and the A1 Pacific Highway at Raymond Terrace. The project is located within the city of Newcastle and Port Stephens Concil local government areas and located in the Federal electorate of Paterson.

Once complete, the extension will remove up to 25,000 vehicles a day from key congestion and merge points along this corridor and will help keep freight, commuters and tourists moving.

The project includes 15-kilometres of dual carriageway and provides motorists access from the existing road network from four new interchanges at Black Hill, Tomago and Raymond Terrace. The project is being delivered as two separate packages of work - Northern Package (Heatherbrae Bypass) and Southern Package (between Black Hill and Tomago).

Seymour Whyte has been awarded the five-kilometre northern Heatherbrae Bypass section. The main construction of the Heatherbrae Bypass section is planned to start in October 2023 with the project expected to be open to the public 2028.

The work will be located near the Pacific Highway corridor from Tomago to Raymond Terrace and will include:
- site compound establishment including access roads
- property adjustments / public utility adjustments
- earthworks, drainage and pavement construction
- bridge works
- completion works including safety barriers, signposting, street lighting and landscaping.

Key features of the Heatherbrae Bypass section include:
- five-kilometres of dual-carriageway, with two lanes in each direction connecting the A1 Pacific Highway at Raymond Terrace to the extended M1 Pacific Motorway at Tomago
- a new interchange at Raymond Terrace with northbound on-ramps and southbound off-ramps to and from the Pacific Highway
- realignment of Masonite Road to provide a grade separated overpass
- a main carriageway bridge over Windeyers creek (approximately 170-metres long)
- two bridges over the main carriageway at Masonite Road and the Raymond Terrace interchange.

Organisations who express interest in the project will be contacted by Seymour Whyte if their services could be used and invited to participate in the tender process.

How to register an Expression of Interest (EOI)

- Work packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to the 'EOI User Guide' below for instructions and assistance to submit an EOI.

- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.


ICN Gateway Company Registration

- Click here to register your company profile on ICN Gateway.

- Support and assistance are available through the document 'Creating an ICN Gateway Company Profile' below.

- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
Accordian collapse

01. Civil Work

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Haulage

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus ITS - Civil Works

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Line marking

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Plant Hire - Dry

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Plant Hire - Wet

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
Accordian collapse

02. Structures Work

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Metal Fabrication

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Piling - Bridge

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Steelfixing

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
Accordian collapse

03. Pavement Work

AccordianPlus Asphalt - Spray Seal

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
Accordian collapse

04. Finishing Work

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Fauna Crossing

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Landscaping

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Signage and Guideposts

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Street Lighting

Full Scope EOI

Closed: 
24 Nov 2023 (AEST)

Partial Scope EOI

  Closed
Note: The closing date/s for expressions of interest are subject to change.