GRANSOLAR CONSTRUCTION AUSTRALIA PTY LTD

WELLINGTON NORTH SOLAR FARM STAGE 2

location_onNSW Australia
location_on

NSW Australia

business

GRANSOLAR CONSTRUCTION AUSTRALIA PTY LTD

Project Primary Contact
person_outline
David Norris
Regional Manager - Central West NSW
phone_enabled
+61 447 800 239
Overview

Wellington North Solar Farm is located approximately 5km North of Wellington in NSW. The project is intended to consist of over 750,000 PV panels, 104 medium voltage power conversion stations and associated balance of plant, and will have a DC nameplate capacity of 425MWp.


Wellington Solar Farm will connect into the national electricity grid via an overhead line into the TransGrid's 330KV Wellington substation.


The project consists of a 425MWdc solar farm approximately 7km north-east of Wellington off the Goolma Rd and 50km south east of Dubbo in the Orana Region of NSW. The project has been approved by the NSW Department of Planning Industry and Environment with construction, which will create around 400 jobs is due to begin soon.


The solar farm is adjacent to our 200MWdc Wellington solar farm which is currently in construction. Once operational, both sites will create a solar hub with a combined installed capacity of 625MWdc.


  • 425Mdc Installed Capacity.
  • 925,000 MWh renewable electricity generated per year.
  • 152,500 homes powered (equivalent).
  • 244,000 cars off the road.
  • 400 construction jobs created.


Read the press release to find out more about our Wellington solar hub.

3
Total work packages
3
Other work packages
3
Total work packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Status
Closed
Full scope EOI closes on
10 Nov 2023

Buildings Design, Assemble and Installation

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
10 Nov 2023

Design and Supply CCTV System

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2024

Cold and Hot Commissioning Works

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.