Overview

Introduction

Valmec Kent Joint Venture (VKJV) have been engaged formally by Origin Energy Future Fuels (Origin) to execute a Front End Engineering and Design (FEED) for the initial phase of the Project.

Following delivery of FEED, the strategy is for VKJV to take the Project through full EPC execution, subject to appropriate approvals being achieved.

As part of the early FEED phase, VKJV is looking to get some high-level budget pricing on key selected packages to understand the Order of Magnitude cost. A formal inqury for these packages will be followed in due course once the engineering is progressed to sufficient detail.

Project Background

The Project objective is to develop an integrated group of production and distribution assets required to establish a hydrogen hub. Hydrogen will be produced from recycled water and renewable electricity using a grid-connected 60MW (nominal) electrolyser.

Hydrogen gas will then be directed to multiple end uses, including:

Local Industry manufacturing Hydrogen will be supplied via pipeline to Orica's Kooragang Island ammonia manufacturing facility.

Heavy vehicles and public transport Hydrogen will be compressed and distributed by road to public and transport industry refueling depots for use in trucking and passenger bus operations in the Hunter, Central Coast, and Greater Sydney regions. The project will include two satellite hydrogen refueling stations supplied with hydrogen by tube trailers filled at the production facility. A hydrogen refueling station will also be included at the production facility.

More information about this project you may find here.


How to register an Expression of Interest (EOI)

- Work packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to the 'EOI User Guide' below for instructions and assistance to submit an EOI.

- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.

- Please dowload "EOI Capabilities & Experience Questionnaire" from Project Documents section below, and provide all answers. When you will register your EOI, the system will prompt you to upload your completed document. Providing all answers is mandatory and decision on further steps will be based on information you provided in your Gateway profile and the answers in this questionnaire.


ICN Gateway Company Registration

- Click here to register your company profile on ICN Gateway.

- Support and assistance are available through the document 'Creating an ICN Gateway Company Profile' below.

- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

75
Total Work Packages
75
Other Work Packages
75
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
01 Subcontracts
Status
Closed
Full scope EOI closes on
23 Sep 2023

H2 Pipeline to Orica Design & Instal ( include CP)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Water Supply Pipeline

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Waste Water Pipeline

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Sewage connection

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Installation of H2 Refueller Stations

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Pipe Spool Fabrication

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

02 Engineering, & Material Supply
Status
Closed
Full scope EOI closes on
23 Sep 2023

Demineraliser (RO) Unit Packages

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Deoxygeniser Packages

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Dryer / Chiller Packages

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Cooling tower

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Mobility Equipment Package( including High Pressure H2 Storage vessels and Tube and trailers)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Harmonics Filters

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

MV Switchgear (3.3kV MCC)
MCCs
UPS
Battery Charger

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Transformers Power

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Statcom

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Fiscal Metering to Orcia

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

ICSS

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Orica Custody Transfer Skid

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

H2 Pigging Station ( Launcher and Receiver )

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

03 Material Supply
Status
Closed
Full scope EOI closes on
23 Sep 2023

Bolts & Nuts, Gaskets

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Diesel Gen-set

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Cooling water pumps

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

H2 Compressors

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Buffer H2 Storage vessels

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Nitrogen Storage Package

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Analysers

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Cooling Tower Chemicals

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Fire Fighting equipment

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Instrument Air Compressor Package

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Cables (incl FOC) and HV Terminations

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Electrical Bulks Packages (incl. the below)
Glands
Grounding System
Lighting System
Cable Trays
Junction Boxes

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Control Valves

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Safety Valves

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Instrument Package (incl. the below)
Flow Nozzles
Flow Meters (LLI)
On-Off Valves (LLI)
Pressure & Temperature Gauges
Tube & Fittings, Pre-insulated Tubes
Flex Thermocouples

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Motor Operated Valves (LLI)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Security Systems (ACS)
Permanent PAGA and CCTV System
Poles for PAGA and CCTV
Comms Equip

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Condition Monitoring

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

F&G Detector

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Field Erected Tanks ( D& C package)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Fire Water Pumps

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Manual Valves

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

H2 Isolation Valve

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Other Pumps

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Pipe Supports

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Plate Material

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

SS Pipe and Fittings CS Seam & SMLS Pipe

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Waste Water Isolation Valve

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

04 Facilities
Status
Closed
Full scope EOI closes on
23 Sep 2023

Permanent building

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

05 Services & Miscellaneous
Status
Closed
Full scope EOI closes on
23 Sep 2023

Construction Communication Systems

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Sep 2023

Customs Brokerage

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Heavy Lift and Rigging

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Sep 2023

Heavy Transportation (SPMT)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Insulation

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Sep 2023

International Freight

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

NDT & PWHT

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Occupational Hygiene Monitoring Services

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Offsite Warehousing and Transport

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Overland Transport & Logistics

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Plant & Equipment Monitoring & Maintenance

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Plant & Equipment (P&E) - Direct

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Plant & Equipment (P&E) - Indirect

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Sandblasting and painting

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Scaffolding

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Site Security

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Supply & Delivery of Construction Water

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Supply & Delivery of Fuel

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Survey Services

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Telecom Service Provider

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Temporary Facilities

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Temporary Facilities Service and Maintenance

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Temporary power connection

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Third Party Inspection

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Traffic Management

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Vacuum and Water Tanker services

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
23 Sep 2023

Waste Management

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.