M1 Pacific Motorway extension to Raymond Terrace - Southern contract


Project at a glance


NSW Australia
Construction Phase
John Holland Gamuda Joint Venture
1B

Contact Details


Dusko Bajic
Industry Manager

The Project

This project, built for Transport for NSW (Transport) is a 10-kilometre section that extends from Black Hill to Tomago and includes the construction of a new four lane divided road between the M1 Motorway near John Renshaw Drive intersection at Black Hill and a point north of Old Punt Road east of the existing Pacific Highway at Tomago.


The main features of the project include:
- a 10-kilometre section of dual carriageway, with two lanes in each direction
- four lane divided road (two lanes in each direction) with a median
- new interchanges at Black Hill with connections to and from the intersection at the M1 Pacific Motorway, John Renshaw Drive and Weakleys Drive.


This interchange will also provide a connection to and from Lenaghans Drive Tarro with new connections to and from the New England Highway including an upgrade of the New England Highway to six lanes between John Renshaw Drive and the existing Tarro interchange.


Substantial construction will begin around September 2023 with the project expected to be open to the public by 2028.


Organisations who express interest in the project will be contacted by the John Holland Gamuda Joint Venture if their services could be used and invited to participate in the tender process.

You can find out more about the project here.


Industry Briefing

ICN NSW, Transport and the John Holland Gamuda JV are inviting local suppliers to attend an Industry Briefing session to listen about available opportunities and the procurement process.

Date: Wednesday 2 August 2023

Time: 3.30 PM - 5.30 PM

Venue: Hexham Bowling Club (290 Old Maitland Road, Hexham)

Registration: https://www.trybooking.com/CITBT


How to register an Expression of Interest (EOI)

- Work packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to the 'EOI User Guide' below for instructions and assistance to submit an EOI.

- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.


ICN Gateway Company Registration

- Click here to register your company profile on ICN Gateway.

- Support and assistance are available through the document 'Creating an ICN Gateway Company Profile' below.

- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
Accordian collapse

01 Structures

Full Scope EOI

Closed: 
28 Sep 2023 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus FRP Bridges

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Minor Piling Works

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Noisewalls

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Reinforcement Supply

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
Accordian collapse

02 Material/Plant Supply

AccordianPlus Concrete Pump Hire

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Concrete Supply

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus General Plant Hire

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Pumps Hire

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
Accordian collapse

03 Earthworks and Drainage

AccordianPlus Asphalt

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Asphalt - Early works

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Clear and Grub

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Drainage Pipe Supply

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Fuel Supply

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Kerb and Gutter

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Landscaping

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Quarry Materials

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Reinforced Walls

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Shoring

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Spoil Disposal

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Spray Seal

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Stormwater Drainage

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Water Treatment

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
Accordian collapse

04 Miscellaneous

AccordianPlus Cleaning services

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Demolition Works

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Fencing permanent

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Fencing temporary

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Labour Hire

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus PPE Supply

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Road Linemarking

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Signposting

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Surveying

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Temporary lighting

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Temporary Works Design

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Traffic Signals

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Waste Servcies

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
Accordian collapse

05 Utilities

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus ITS Civil Works

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus ITS Electrical

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
Accordian collapse

06 Environmental

AccordianPlus Enviro Lab Services

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Environmental Testing

Full Scope EOI

Closed: 
31 Aug 2023 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Dec 2023 (AEST)

Partial Scope EOI

  Closed
Note: The closing date/s for expressions of interest are subject to change.