Rex Minerals SA, is undertaking the development of the Hillside Project, located within the District Council of Yorke Peninsula (DCYP) local government area. The Hillside Project site is approximately 150 km by road from Adelaide, 12 km south of the town of Ardrossan (10 km south of the Port of Ardrossan) and 3 km north of Pine Point, South Australia.

The Feasibility Study focuses on a 6 Mt/a start-up copper-gold recovery plant process plant with concentrate being shipped from Adelaide.

You are invited to register an expression of interest if you have the relevant capability and capacity and experience relevant to the scope of work. Suppliers and contractors will only be considered for prequalification and tender lists if suitably qualified.

Key components of the proposed Hillside Copper Mine include:

  • Open pit
  • Mineral processing plant and supporting mining infrastructure
  • Mine waste rock and tailings storage facility
  • Highway diversions and road upgrades
  • Electricity supply sourced via a new power line from Ardrossan substation to the mine site

Hillside has the potential to provide significant economic benefit to SA and have a direct positive impact on the economy of the Yorke Peninsula, alongside the existing important industries of agriculture and tourism. This is through upgraded power and port facilities, access to fresh water and the creation of local jobs.

To view recent Hillside Project news items, please visit rexminerals.com.au

37
Total Work Packages
37
Open Work Packages

Rex Minerals (SA) Pty Ltd

location_on

SA Australia

Project Primary Contact
person_outline
Alex Vojdani
badge
Consultant
phone
+61 447 277 175
Project Secondary Contact
person_outline
Eddie Ivar
badge
ICN Consultant, SA
37
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Stay Updated
Status
Open
Full scope EOI closes on
19 Dec 2025

Express interest for future opportunities that may arise for this project.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Work Packages
Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include: Aerial powerline design and construction.

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

High Voltage cable supply suitable for mining applications

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

Low Voltage cable supply suitable for mining applications

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:
CCTV camera equipment suitable for mining applications.
Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:
6x Air compressors (flowrate ranging from 12.7Nm3/h to 1000Nm3/h) , 7x Control Panels, 11x Air Dryer and Filters, 11x Air receivers (size ranging from 1m3 to 40m3)

Compressors require air intake filters and inlet control valves, electric drives and guards, air/ water and oil/water separators, acoustic and electrical enclosure, control panels.

Dryers require skid mounting, tank pre and post filters, drain valves, pressure indicators, interconnecting pipework within skid, control panel (LCP).

Receivers require tank and support legs/ base frame, pressure relief valve, pressure gauge, drain valves, nozzles.

Lifting lugs/ guarding required, as well as suitability for hypersaline process and washdown equipment.
Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:
Stockpile feed conveyor (1,400mm width, 238kW), SAG mill feed conveyor (1,400mm width, 119kW), pebble transfer (750mm), pebble crusher feed (750mm width) and pebble crusher discharge (750mm) belts/ splice kits/ spare belt allowance. Need bend/ take-up/ rive pulleys, scrapers, vee ploughs, idlers (vee, flat, training, vee training, retractable, impact, transition, carry).

Drives (motor, high speed coupling, gearbox, low speed rigid coupling) required for conveyors, suitability for hypersaline process and washdown water, safety guards, lifting lugs.
Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

1x 3.2t Overhead Crane (single-girder) and drive assemblies, 1x 9m 1.5t Jib Crane (fixed pillar with jib arm - 2 speed drives/hoist), 5x electric hoists ranging from 0.5t to 2t (some fixed pendant, some roving pendant). 12x manual hoists ranging from 0.5t o 6t.

Include supply of service platforms required for operation and maintenance; control panels; safety and control devices including overload protection, motor thermal protection, and limit switches, siren and flashing beacon, drive assemblies, trolley assemblies where specified.

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

Vertically integrated construction capability Civil, Structural Mechanical, Piping, Electrical and Instrumentation construction of complex multidiscipline process plants.

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

Demountable style switchroom buildings including supply and installation of motor control centres (MCC's).

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:
Filter Press used in concentrate dewatering circuit. Horizontal pressure filter, 156m2. 8,000h/y operating time, feed capacity (nominal) 22.6 t/h.

Require hydraulic unit, air water separator, air muffler, control panel, air release tank stack.

Manual and actuator valves, cake wash system, pressure valves/ transmitters, cloth wash system, safety guards/ doors etc, safety switches.
Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may change:
Flocculant feed system, storage bin with heater/ outlet isolation gate/ support steelwork, storage bin vibrator/ actuator, dust collection unit and fan, powder metering system and transfer pipe to mixing tank, mixing tank complete with piping and nozzles, head frame for mixing tank, access platforms, local control panels, 1x positive- displacement transfer pump, dosing pump skids and piping (2x tailings thickener PD pump, 2x concentrate thickener, piping ad discharge manifold). Shall be suitable for hypersaline process ash water, guarding, lifting lugs and surface protection required.
Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirement may include:
Forced air tank cells/ blowers used in flotation circuit: 7x 200m3 cells for rougher flotation, 5x 70m3 cells for Stage 1 cleaner scavenger flotation. Inlet feed boxes for each bank of cells, including lids, vents, nozzles.

Flotation cell tanks, including walls, tank floor, all internal launders, submerged reagents addition points and associated piping, earthing lugs and any required baffles, weir, splitter plates and froth crowders. Rougher flotation cells (FC-001 and FC-002) to include internal double concentrate launder arrangements to provide a larger froth surface area and lip length.

Drive components, access platforms, maintenance access (manholes), abrasion resistant liners required.
Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:
International freight forwarder and logistics management.
Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

Process and control instrumentation suitable for mining applications.

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:
SAG Mill liner handler assembly (safe workload capacity 4t), 2x winches, 2x hammer power packs, 2x monorails, 2x bolt hammers.

Requires rubber tyre mounted self-propelled base unit, operator consoles, hydraulics, locating and clamping mechanisms, lifting lugs, motors and drives, control panel, guarding, platform and stairs on the machine.
Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:
2x Primary cyclone feed pump, 4x tailings pumps, 1x rougher tailings pump. Pump characteristics shall exhibit decreasing head with increasing flow, with a maximum head at shut off. Pumps shall be sized to maximise flow condition, and selected to minimise impeller wear. Horizontal arrangement and centrifugal type, complete with drivers on common base frames.

Pumps require wet end pump assembly (including liners ad gland seal arrangement, bearing assembly, drive assembly, cooling system for drives, automatic lubrication system, electric motors, base-frames).
Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

Assorted sized manual process valves

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

Design and construction of heavy vehicle workshops, diesel storage and pumping, tyre change facilities, washdown areas, etc.

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:
Design and construction of demountable buildings for mining applications.

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

Oil filled electrical power transformers

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:
Fabricated pipe spools, rubber lined, HDPE, Steel.
Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:
Fabricated and lined chutes, hoppers, feed boxes
Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

Design and construction of steel fabricated buildings for mining applications.

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:
Gyratory crusher used as the first stage of crushing minerals. Includes primary crusher, liners, lubrication unit, cooling unit, heaters, pumps, hydraulic units, drives.

Crushing circuit will operate at 8 Mt/y initially, then ramp up to 10 Mt/y. 24h operation, need to consider site conditions and requirements (coastal salt water for wash downs, dust suppression in area). Maximum ROM ore lump size will be 1,000mm, feed size distribution
Note specifics are subject to change:

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

Bulk earthworks, drainage and road works.

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:
Regrind circuit, part of flotation circuit Isa Mill 10000 and 3000 series regrind mills, lubrication units, hydraulic power pack, media feeder, media hopper, transport water hopper, feed pump, trash screen, flushing pumps.

Drives components, water tanks, valves, all safety guards, lifting lugs, piping. Equipment needs to be suitable for sea water process and wash down water.
Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

Containerised Reverse Osmosis Plant (1,800m3 daily minimum permeate production) to treat sea and mine water.

Including RO Feed Tank with auxiliary equipment, pre-treatment systems (self-cleaning filter, ultrafiltration, and cartridge filters), reverse osmosis vessels to produce fresh water, RO feed pumps, RO pumps and reagent pumps within battery limits of RO plant, pH correction system with acid dosing, break tank, RO Effluent tank, LSI (Langelier Saturation Index) adjustment system, service connections (water, air, power, control), detailed list of chemicals for first fill and 12 months of operation.

Must be suitable for hypersaline process wash water.

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

16,000 kW dual pinion SAG mill used in the grinding plant, 1000-1250 t/h new feed.

Will include SAG Mill, lubrication and grease spray system (with pumps), low- and high-pressure lube oil pumps for bearings, pinions, gearboxes, motors, feed chute transporter/ hydraulic system, inching drive.

Also requires VSD, VSD transformer, control panel, feed chute transporter panel, temporary mobile lube system panel.

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:
12 Static samplers (10x pressure pipe samplers, 2x launder box cutter samplers), 4x metallurgical samplers (multi-stage). All samplers produce between 6 and 10m3/h and end to analyser. 3x analysers (On-stream analyser, coarse particle and fine particle analyser).

Analysers to provide measurements for: Cu (0.05 to 50% grade), Fe (0.5 to 50% grade), density. Need instrumentation, lifting lugs/ transportation cradles, pulse processing units and cooling hardware for prove set.
Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

24/7 site security patrols
ad hoc security services

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

Fabricated structural steel including bolted and welded fabricated items. Modular, prefitted gantries and stick steel

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

Supply of construction temporary facilities including demountable buildings, crib sheds and toilets.

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:
18m diameter concentrate thickener (including flocculant static mixer, de-aeration tank, hydraulic power pack), 40m diameter tailings thickener (including flocculant static mixer, hydraulic power pack, hoist).

Thickener tank requires support steelwork/ nozzles, all pipe work is required, thickener rake mechanisms, reversible rake drive, rake lifting mechanism. Thickener bridge and walkways on thickener/ tailings thickener, fed well, pipe rack, all instrumentation, local control panel, froth control system.
Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:

Supply and install underground conduit and piping trenching and installation work.

Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
06 Aug 2025

The indicative package requirements may include:
Supply and construction of warehouse sheds, including offices, racks, doors, hardstands, etc.
Note that specifics are subject to change.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Other products and services
Status
Open
Full scope EOI closes on
06 Aug 2025

If your organisation has not found its capabilities within the other work packages, due to the uniqueness of your proposal, or you have a product/service relevant to this project, you are encouraged to express interest against this work package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.