Overview

Beach Energy is a key supplier to Australia's East Coast domestic gas market. In Victoria, Beach produces gas through infrastructure located in the Bass Basin and the Otway Basin, both located offshore Victoria providing critical energy resources for Australia.


In the Bass Basin, Beach Energy currently produces natural gas and hydrocarbon liquids from the offshore Yolla field via the Yolla-A production platform for transport via a subsea pipeline to the Lang Lang Gas Plant located onshore near Lang Lang, Victoria.


Beach Energy also produces natural gas and hydrocarbon liquids from the offshore Thylacine and Geographe fields, located in the Otway Basin via the Thylacine A production platform. Gas from these fields is transported from the Thylacine production platform to the Otway Gas Plant located onshore near Port Campbell, Victoria.


Within close proximity to the current producing assets in both Bass Basin and Otway Basin, there are a number of smaller gas reserves which have proven difficult to develop as bespoke projects. Subject to internal and external approvals, OGV initiates a strategy to develop the additional gas reserves through utilisation of existing offshore infrastructure and creating further efficiencies through consolidated drilling and installation campaigns.


The offshore drilling campaign plans to engage a semi-submersible drill rig to perform drilling activities at various locations which would include well completions and subsea Christmas trees.


The facilities installation campaign would connect flowlines from the subsea Christmas trees back into the existing production flowlines or platforms, as well as brownfields modifications at the production platforms, and commissioning activities.


ABOUT BEACH ENERGY


Beach Energy is an ASX listed, oil and gas exploration and production company headquartered in Adelaide, South Australia.


Beach's purpose to 'sustainably deliver energy for communities' means we operate while maintaining the highest health, safety and environmental standards.


Founded in 1961, Beach today has oil and gas production in five basins across Australia and New Zealand.


Beach Energy is a key supplier to Australia's East Coast gas market, suppling approximately 12% of the gas on the East Coast of Australia, and is aiming to grow this further.


All of the gas Beach produces on the East Coast of Australia is sold to retailers within Australia.


PROJECT TIMEFRAMES


Subject to internal approvals, project design and engineering works commenced early in 2023 with offshore drilling activities planned to commence in late 2024 and carry through into 2025 with subsea and offshore installation activities looking to commence in 2025.


PROJECT EXPRESSIONS OF INTEREST


The project will be calling for expressions of interest from capable Australian suppliers and service providers through the ICN Gateway.


HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)

  • To submit an EOI, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
  • This is an initial, generic EOI submission only. All companies who submit an EOI will be included in information presented to companies who are short listed to bid for this Project.
  • The services, programmes and initiatives provided by ICN Victoria are aimed at complementing a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.

ICN GATEWAY COMPANY REGISTRATION

  • Click here to register your company profile on ICN Gateway.
  • Support and assistance are available through the web links listed below.
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • Companies should ensure that the email notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to Information & Updates, Major Projects and Regional Opportunities.


(1) ICN Gateway Setup Wizard
(2) ICN Gateway User Guide

32
Total work packages
32
Other work packages
32
Total work packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Status
Closed
Full scope EOI closes on
02 Jun 2023
Partial scope EOI closes on
02 Jun 2023

Beach is seeking Expressions of Interest for supplier opportunities on the OGV Project, and is seeking to identify potential bidders to provide the following as a packaged system:
. Subsea Christmas trees (XT);
. Subsea connection system; and
. Subsea Production Control System

The scope of work would include:
. Project management;
. Design and engineering;
. Equipment testing and design validation;
. Equipment Supply; and
. Installation and ongoing aftermarket support

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Aug 2023
Partial scope EOI closes on
18 Aug 2023

Provision of up to three (3) AHTS vessels with appropriately qualified Australian crew and support services for the safe, efficient, and effective pre-lay mooring, positioning and towing services of a Semi-Sub Mobile offshore drilling units (MODU) rig (Transocean Equinox) along with transportation of freight/materials/bulk liquids & fuel supporting Charterers drilling campaign. All vessel operators performing marine service operations on behalf of Charterer must comply with all applicable Class, international, local, port and flag state laws, rules and regulations including environmental compliance requirement.
Logistics base for the operation will be in Geelong, Victora.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS)
Start of drilling operations to be no earlier than October 2024

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS)
Start of drilling operations to be no earlier than October 2024

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS)
Start of drilling operations to be no earlier than October 2024

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS)
Start of drilling operations to be no earlier than October 2024

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, and personnel to support the above package, including:
. Other downhole bottomhole assembly components (including crossovers, stabilisers, non-magnetic drill collars, jars, accelerators); and,
. Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS)
Start of drilling operations to be no earlier than October 2024

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS)
Start of drilling operations to be no earlier than October 2024

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, and personnel to support the above package, including:
-Other downhole bottomhole assembly components (including crossovers, stabilisers, non-magnetic drill collars, jars, accelerators); and,
-Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Incl. Perforate, Wash, Cement; section milling and swarf handling)
Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support above the package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Slickline and braided line c/w reels, unit, pressure control equipment, downhole tooling, miscellaneous and associated tooling.
Personnel to prepare, operate and maintain supplied equipment and services including third party supplied equipment.
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS)
Start of drilling operations to be no earlier than October 2024

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package.
This includes:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS)
Start of drilling operations to be no earlier than October 2024

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS)
Start of drilling operations to be no earlier than October 2024

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS)
Start of drilling operations to be no earlier than October 2024

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, materials, consumables and personnel to support the above package, including:
Oil and gas well wellbore clean up services, primarily aimed at providing a clean wellbore prior to undertaking completion operations, including displacing wellbore from drilling to completion fluid.
Tooling to suit BOP, riser, casing and liner applications.
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS)
Start of drilling operations to be no earlier than October 2024

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, and personnel to support the above package, including:
-Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Nov 2023
Partial scope EOI closes on
06 Nov 2023

Provision of tools, equipment, and personnel to support the above package, including:
Onshore support, engineering, reporting, contract management; supervisory services for the above package including monitoring, advising and reporting as required.
Specific scope requirements will be communicated to suitable contractors through an invitation to tender.
Compliance with rig class, national, international and industry standards, Australian regulatory requirements. Compliance with Beach Well Engineering and Construction Management System (WECS) and Beach Operational Excellence Management Systems (OEMS).
Start of drilling operations to be no earlier than October 2024.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.