OX2 HOLDINGS AUSTRALIA PTY LTD

HORSHAM SOLAR FARM

location_onVIC Australia
location_on

VIC Australia

business

OX2 HOLDINGS AUSTRALIA PTY LTD

Project Primary Contact
person_outline
Lisa Maro
Renewable Energy Industry Adviser
phone_enabled
+61 3 9864 6720
Overview

About OX2

Leading Swedish renewable developer OX2 has acquired ESCO Pacific. OX2 sees great potential in the Australian market for renewables and sees opportunities to expand the operations of ESCO Pacific. OX2 also plans to scale up operations through acquisitions in solar and energy storage and has the ambition to expand operations to onshore wind while exploring offshore wind and hydrogen. The ESCO Pacific name and logo will now be replaced with OX2. To view the relevant media release, please visit: https://www.ox2.com/australia/news


About the Project

OX2's Horsham Solar Farm is situated on 196 hectares of grazing and cropping lands, approximately 5 km east of Horsham in Victoria. The project will export a maximum of 118.8MWac power to the grid and comprise approximately 230,000 solar photovoltaic (PV) modules, installed on ground-mounted single axis horizontal tracking structures. Direct Current (DC) electricity generated by various groups of PV modules is combined and fed into solar inverters which invert DC electricity into Alternating Current (AC) electricity. This electricity will then fed into a 33kV reticulation system before being centrally dispatched to the electricity network via a newly built transformer substation connecting solar farm directly to the 220kV bus at existing Horsham Terminal Substation owned by the Ausnet.


The solar farm consists of the following major equipment:

  • 220/33kV Main Transformer Substation
  • 220kV underground cable between Solar Farm and Horsham Terminal Station
  • Collection Station consisting of 33kV switchgear, Protection, metering, control and communication equipment
  • AC and DC auxiliary power supply system, all mounted inside a prefabricated building
  • PV modules
  • Trackers
  • Piles
  • Combiner Boxes
  • Power Conversion Units (PCUs) consisting of inverters, transformers and Ring Main Units, all mounted on a metal skid
  • SCADA system
  • Security System
  • Meteorological Stations
  • Operation & Maintenance buildings
  • Perimeter fencing with CCTV cameras


All of the above equipment are connected together by AC, DC, Fibre Optic and other communication cables. These equipment and cables are installed by appropriately qualified civil, mechanical and electrical contractors.


Generally, OX2 will engage an experienced EPC contractor who will design and construct the entire solar farm on turnkey basis. While selection process for such an EPC contractor has already started, OX2 is working closely with ICN to identify local suppliers and contractors who are capable of supplying product and services to the main EPC contractor as a subcontractor during the engineering, procurement, construction, operation and maintenance phases of the Horsham Solar Farm.


Project Timing

The project is expected to go into construction during the second quarter of 2024.


HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)

  • To submit an EOI, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
  • This is an initial, generic EOI submission only. All companies who submit an EOI will be included in information presented to companies who are short listed to bid for this Project.
  • The services, programmes and initiatives provided by ICN Victoria are aimed at complementing a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.

ICN GATEWAY COMPANY REGISTRATION

  • Click here to register your company profile on ICN Gateway.
  • Support and assistance are available through the web links listed below.
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • Companies should ensure that the email notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to Information & Updates, Major Projects and Regional Opportunities.

(1) ICN Gateway Setup Wizard
(2) ICN Gateway User Guide



11
Total work packages
11
Open work packages
11
Total work packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
General
Status
Open
Full scope EOI closes on
31 May 2024

Express interest for any opportunities that may arise for this project.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 May 2024
Partial scope EOI closes on
31 May 2024

Clearing and grubbing, Bulk earth works, Excavation, hardstand, internal and external access roads.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 May 2024
Partial scope EOI closes on
31 May 2024

Installation of DC, MV and FO cables including trenching, backfilling, and compaction.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 May 2024
Partial scope EOI closes on
31 May 2024

Civil, electrical and mechanical services

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 May 2024
Partial scope EOI closes on
31 May 2024

Design & supply

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 May 2024
Partial scope EOI closes on
31 May 2024

Haulage and delivery

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 May 2024
Partial scope EOI closes on
31 May 2024

Installation of piles, trackers, and PV modules.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 May 2024
Partial scope EOI closes on
31 May 2024

PV module cleaning and vegetation management

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 May 2024
Partial scope EOI closes on
31 May 2024

Various plant and machinery required for civil, mechanical and electrical works

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 May 2024
Partial scope EOI closes on
31 May 2024

Operations & Maintenance Building, Storage Building, Collection Station

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
31 May 2024
Partial scope EOI closes on
31 May 2024

Geotechnical, Surveying, traffic management, security

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.