Royal Prince Alfred Hospital (RPAH) Stage 1 Redevelopment Project - CPB Bid


Project at a glance


NSW Australia
Early Contract Involvement (ECI) Tender
CPB CONTRACTORS PTY LIMITED

Contact Details


Ian Hudson
Industry Capability Network
+61 428 129 048

The RPA redevelopment will focus on developing a whole of campus solution which brings together new models of care, enabling technology and physical infrastructure to support service expansion and changes in service delivery, including Virtual Care.


The Project will include the development of clinical and non-clinical services infrastructure to expand, integrate, transform and optimise current capacity at RPAH to provide contemporary patient-centered care that is evidence based including an expanded and enhanced Emergency Department (ED) and Intensive Care Unit (ICU), expanded, integrated, and enhanced Operating Theatres (OT) and Interventional Cardiology, expanded Adult Acute Inpatient accommodation, increased interventional and imaging services appropriate for the increased demand, associated and appropriate clinical and non-clinical support services, facilities and capabilities for further Integrated research, education and training capabilities, and improved accessibility to the campus.


The RPAH campus represents a complex brownfield redevelopment with services under ever increasing demand, the East campus accommodating the majority of critical clinical and high value infrastructure and construction to occur in an inner-city context. The redevelopment will include a combination of new build, refurbishment, repurposing and change management strategies, further enabled by a focused technology investment and implementation plan. Integration between existing and new / refurbished facilities and adaptive re-use of historic facilities will form the basis of the final built solution.


The scope of the proposed works includes the following:

  • New East Building comprising the following enhanced services - Women's Ambulatory Care service, Birthing Suites, NICU/SCN, Emergency Department expansion, ED Satellite Imaging, Cardiology Close Observation Unit (CCOU), Inpatient Units (IPUs) for General Medicine/ Surgical/ Palliative, Engineering Zone and Plant
  • East Extension (to Building 89) comprising the following enhanced services - Operating Theatres, Engineering Zone
  • Vertical Extension (to Building 89) comprising the following enhanced services - Emergency Department expansion and cold shell space, an IPU, Intensive Care Unit (ICU) and ICU support/ link, Plant
  • Refurbishment within the existing RPA hospital for the following services - Recovery/ Perioperative Unit, Emergency Department and Ambulance entry, Medical Imaging expansion including Radiology Rooms, Cardiac Cath Labs (warm shell)
  • Early Works includes allignment works at Lambie Dew Drive and Temporary Helicopter Landing Site.
  • Option works including Molecular Imaging expansion and Fitout to Shell at ICU, IPU + Theatres

How to register an Expression of Interest (EOI)

- Work Packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to theEOI User Guidebelow for instructions and assistance to submit an EOI.

- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.


ICN Gateway Company Registration

- Click here to register your company profile on ICN Gateway.

- Support and assistance is available through the web links listed below.

- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
AccordianPlus 3100 - Demolition

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 3300 - Piling

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 4700 - Post Tensioning

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 5200 - Metal Roofing

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 6050.01 - Blockwork

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 6100 - Metalwork

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 6380.01 FFE GROUP 1

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 6400.01 Joinery

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 6530 FFE Group 2

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 6600.01 - Insulation

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 6600.02 - Partitions

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 6600.03 - Ceilings

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 6720.02 - Carpet

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 6730 - Tiling

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 6770 - Waterproofing

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 6800 - Painting

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 7200.01 - Electrical

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 7200.02 - Security

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 7400 - Fire Services

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 7610 - Pneumatic Tube

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 7620 - Medical Gases

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 7630 - Nurse Call

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 8100 - Civil Works

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 8300 - Landscaping

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
AccordianPlus 8510 - Stormwater

Full Scope EOI

Create EOI
Closes: 
24 Oct 2022

Partial Scope EOI

  Open
Note: The closing date/s for expressions of interest are subject to change.