Hunter Power Project - UGL


Project at a glance


NSW Australia
Under Construction
UGL ENGINEERING PTY LIMITED

Contact Details


Dusko Bajic
Industry Manager
+61 417 323 636

About the Project

CIMIC Group's UGL is the Principal Contractor of Snowy Hydro Limited's Hunter Power Project for the construction of a 660MW power generation plant in Kurri Kurri, New South Wales.

This power station will generate energy with two heavy-duty "F Class" open cycle gas turbines. These turbines will be capable of operating on hydrogen, natural gas and diesel as a backup.

The purpose of the Hunter Power Project is to provide dispatchable "firmed" energy, ensuring security and stability to support the volatility that arises from intermittent renewable energy sources. In addition, this facility will fill the gap in electricity demand and ensure that the supply of electricity is secured after the Liddell Power Station at Muswellbrook retires.

The Hunter Power Project will receive gas through a new lateral pipeline connecting to the Jemena Gas Network Northern Trunk and a gas compression station, both being developed in parallel to the facility as a separate project.

The power station will also include a new 132 kV electrical switchyard, that will eventually be owned and operated by Ausgrid as the Network Service Provider (NSP).

For more information about the Hunter Power Project, please visit www.snowyhydro.com.au/hunter-power-project/


Work with us

We're looking for local suppliers of goods and services.

Click on the "Work Packages" tab above to find a suitable work package for your business and express your interest in participating.

Alternatively, please fill in our Capability Assessment Form and send it to hpp.suppliers@ugllimited.com with information about your business and how you could be part of this great initiative.


How to register an Expression of Interest (EOI)

  • Available work packages are listed in the "Work Packages" tab above.
  • Refer to the EOI User Guide for instructions and assistance to submit an EOI.
  • Your business must have an ICN Gateway company profile to submit an initial EOI for the work packages. To create a profile, please refer to the information below on how to register your company on ICN Gateway.


ICN Gateway Company Registration

  • Click here to register your company profile on ICN Gateway.
  • Your company summary and description will be used to assess your ability to complete projects when you lodge an EOI. Please ensure that your team invests the time and energy required to represent your company in the most effective manner possible.


Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status

Full Scope EOI

Closed: 
25 Nov 2022 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 May 2023 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus C103. Security Systems

Full Scope EOI

Closed: 
25 Nov 2022 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 May 2023 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus C106. Instruments

Full Scope EOI

Closed: 
25 Nov 2022 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus C13. Landscaping

Full Scope EOI

Closed: 
31 Aug 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 May 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
30 Jun 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
30 Jun 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
23 Dec 2022 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Aug 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
25 Nov 2022 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
25 Nov 2022 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus F5. Foundation Bolts

Full Scope EOI

Closed: 
31 May 2023 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus Landscaping

Full Scope EOI

Closed: 
31 Mar 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
25 Nov 2022 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
30 Jun 2023 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus M17. Piping Insulation

Full Scope EOI

Closed: 
31 May 2023 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus M18. Nitrogen System

Full Scope EOI

Closed: 
25 Nov 2022 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus M19. Hydrogen System

Full Scope EOI

Closed: 
25 Nov 2022 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus M24 GTG Grouting

Full Scope EOI

Closed: 
31 Mar 2023 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus M31. Monorail Crane

Full Scope EOI

Closed: 
30 Jun 2023 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus M32. Safety Shower

Full Scope EOI

Closed: 
30 Jun 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
30 Jun 2023 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus M34. Quench Vessels

Full Scope EOI

Closed: 
30 Jun 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Aug 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Mar 2023 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus P05 Test Equipment

Full Scope EOI

Closed: 
31 May 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 May 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Mar 2023 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus P30 NDT Services

Full Scope EOI

Closed: 
31 May 2023 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus P33 Site Photographs

Full Scope EOI

Closed: 
31 May 2023 (AEDT)

Partial Scope EOI

  Closed
AccordianPlus P34 GT Assembly Tools

Full Scope EOI

Closed: 
31 May 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 May 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 May 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 May 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 May 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 May 2023 (AEDT)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
25 Nov 2022 (AEDT)

Partial Scope EOI

  Closed
Note: The closing date/s for expressions of interest are subject to change.