NEOEN AUSTRALIA PTY. LTD.

GOORAMBAT EAST SOLAR FARM

location_onVIC Australia
location_on

VIC Australia

business

NEOEN AUSTRALIA PTY. LTD.

Project Primary Contact
person_outline
Lisa Maro
Renewable Energy Industry Adviser
phone_enabled
+61 3 9864 6720
Overview

About Neoen Australia

Neoen is a leading independent producer of renewable energy, with a capacity of 4.8 GW in operation or under construction worldwide, aiming to reach more than 10 GW by the end of 2025. Neoen began operations in Australia in 2012, where it now owns a cumulative capacity of 2 GW of solar, wind and storage projects currently in operation or under construction.


Goorambat East Solar Farm Pty Ltd is a fully owned subsidiary of Neoen Australia Pty Ltd.


For more information, please visit the Neoen Website.


About the Project

The Goorambat East Solar Farm provides 640ha for a large utility scale solar farm rated at 250MWac. The project is located in the township of Goorambat, approximately 12km North of Benalla.


The solar plant and connection assets were approved with a planning permit in December 2019 by the Benalla Rural City Council. The project was also granted grid connection approval by AEMO in July 2021. It is now preparing for the construction stage, which is expected to begin in late 2022.


Goorambat East Solar Farm will include:


  1. an array of approximately 570,000 solar modules mounted onto horizontal single-axis trackers;
  2. low-voltage DC cabling reticulation network;
  3. approximately 78 inverters and medium-voltage transformers;
  4. 33kV AC cabling reticulation network;
  5. 33/250kV substation;
  6. operations and maintenance (O&M) buildings;
  7. internal roads and
  8. fences.


For more information, please visit the project website.


Committed to deliver local and regional economic development through its projects, Neoen is seeking to engage with businesses across Benalla region and the State of Victoria to identify potential suppliers for goods and services related to the construction and operation of Goorambat East Solar Farm.


First work packages are open to expressions of interest to enable Neoen in identifying local suppliers for the project, in particular suppliers who address Victoria's social and sustainable procurement objectives. The list of suppliers who have expressed their interest during this phase will be communicated to the EPC contractor which will be selected before construction.


HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)

  • To submit an EOI, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
  • This is an initial, generic EOI submission only. All companies who submit an EOI will be included in information presented to companies who are short listed to bid for this Project.
  • The services, programmes and initiatives provided by ICN Victoria are aimed at complementing a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.


ICN GATEWAY COMPANY REGISTRATION

  • Click here to register your company profile on ICN Gateway.
  • Support and assistance are available through the web links listed below.
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • Companies should ensure that the email notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to Information & Updates, Major Projects and Regional Opportunities.


1) Gateway by ICN Setup Wizard

2) Gateway by ICN User Guide

3) Gateway by ICN EOI User Guide

22
Total Work Packages
1
Open Work Package
21
Other Work Packages
22
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
General
Status
Open
Full scope EOI closes on
31 Dec 2024

Express interest for any opportunities that may arise for this project.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Miscellaneous
Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Supply accommodation for workers during construction and operation of the plant.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Supply and installation of low-voltage DC and medium voltage AC cabling for internal reticulation network of the plant.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Supply of stainless-steel clamps for trackers.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Deliver periodic cleaning services to the facilities of the solar farm during the construction stage.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Supply and installation of concrete foundations for inverters, MV transformers, HV substation, and O&M buildings.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Supply and installation of DC combiner boxes.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Supply and installation of steel made water tanks.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Supply food and catering service for workers during construction and operation of the plant.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Build of internal roads.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Planting of approximately 14,000 trees along 10km of the perimeter of the plant, including maintenance (e.g. watering) until trees reach maturity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Installation of trackers and mounting of solar modules.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Supply and installation of fences around native vegetation to be preserved during construction works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Installation of stainless-steel piles driven to the ground for the foundations of trackers.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Supply of stainless-steel posts for trackers.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Supply of S Bearing for trackers.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Supply and installation of a temporary site compound for the duration of the construction period.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Supply and installation of 22km of fence around the perimeter of the plant.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Supply of stainless-steel piles for the foundations of trackers.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Supply of stainless-steel torque tubes for trackers.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Removal of approximately 67 trees.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2021
Partial scope EOI closes on
26 Nov 2021

Deliver the service of waste disposal during the construction of the solar field, including opportunities for recycling.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.