Cabramatta Loop Project

The Port Botany Rail Duplication (including Cabramatta Loop) project comprises the duplication of the remaining single-track section of the Port Botany Rail Line and delivery of a new passing loop on the Southern Sydney Freight Line. The Project aims to provide the capacity to meet predicted growth in the containerised freight task and support rail services between Port Botany and metropolitan freight intermodal terminals.


Fulton Hogan has been awarded the contract to design and construct the Cabramatta Loop Project.


The Project includes the following key features:

- New rail track – providing a 1.65 kilometre long section of new track adjacent to the existing track, with connections to the existing track at the northern and southern ends

- Track realignment – moving about 550 metres of existing track sideways to make room for the new track

- Bridge works – constructing two new bridge structures adjacent to the existing rail bridges over Sussex Street and Cabramatta Creek

- Road works – reconfiguring Broomfield Street for a distance of about 680 metres between Sussex and Bridge streets.


Ancillary work includes communication, signalling and power upgrades, works to existing retaining and noise walls, drainage work and protecting/relocating utilities. In addition, minor works in the form of new signalling would be installed at a number of locations within the rail corridor.


More information about the project is available at https://artc_botanyandcabramattaprojects.icn.org.au and http://cabramattaloop.com.au.


How to register an Expression of Interest (EOI)

- Work packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to the 'EOI User Guide' below for instructions and assistance to submit an EOI.

- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.



ICN Gateway Company Registration

- Click here to register your company profile on ICN Gateway.

- Support and assistance are available through the document 'Creating an ICN Gateway Company Profile' below.

- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.


Share this project on:

FB Twitter LinkedIn

Project at a glance


NSW Australia
Under construction
FULTON HOGAN CONSTRUCTION PTY LTD
$80M

Contact Details


Thuy Ho
Senior Consultant | Sydney Metropolitan
+61 2 9927 3100

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status

Full Scope EOI

Create EOI
Closes: 
31 Dec 2021

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
31 Dec 2021

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
01 Feb 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
01 Feb 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
09 Feb 2022

Partial Scope EOI

  Open

Full Scope EOI

Closed: 
16 Oct 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
10 Nov 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
12 Nov 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
10 Oct 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
10 Oct 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
07 Nov 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
15 Oct 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closes: 
11 Mar 2022

Partial Scope EOI

  Pending
AccordianPlus SC7215 - 039 Piling

Full Scope EOI

Closes: 
31 Mar 2022

Partial Scope EOI

  Pending
Note: The closing date/s for expressions of interest are subject to change.
PROJECT
NSW AUSTRALIA

The Project’s objectives are to:- Increase rail capacity to meet forecast demand for freight services;

- Accommodate port shuttle services to move more containers in and out of the port via rail;

- Reduce road congestion, heavy vehicle road safety incidents, and road maintenance expenditure;

- Reduce rail congestion between Port Botany and intermodals;

- Provide operational flexibility flowing from reduced congestion and increased capacity;

- Improve service reliability for freight rail customers through enhanced train movements and connectivity; and

- Reduce air pollution, greenhouse gas emissions and noise from diversion of freight from road.

View Project
PROJECT
NSW AUSTRALIA

The Botany Rail Duplication project involves the duplication of the remaining single-track section of the Port Botany Rail Line. The Project aims to provide the capacity to meet predicted growth in the containerised freight task and support rail services between Port Botany and metropolitan freight intermodal terminals.The Botany Rail Duplication project involves the duplication of the remaining single-track section of the Port Botany Rail Line. The Project aims to provide the capacity to meet predicted growth in the containerised freight task and support rail services between Port Botany and metropolitan freight intermodal terminals.

View Project